This disclosure relates generally to apparatus and methods for packet cell change order. More particularly, the disclosure relates to packet cell change order for wireless communication systems.
Wireless networks may have a need to transition from second generation (2G) systems such as GSM/GPRS/Edge to enhanced third generation (3G) systems such as UMTS (Universal Mobile Telecommunications System). UMTS uses a WCDMA air interface, instead of a TDMA air interface in GSM. 3G systems have both circuit switched (CS) and packet switched (PS) transport services. CS services implement a dedicated connection (circuit) between users. PS services, in contrast, provide more efficient utilization of the frequency spectrum by time sharing a pool of network resources. However, PS services are more prone to variable transport delay and possible data loss due to congestion at switching nodes.
Wireless networks are being upgraded to UMTS. Since UMTS deployments are not complete, in general, these wireless networks are dual mode, GSM and UMTS. As mobile users transit out of UMTS (3G) coverage cells, the wireless units will fall back to GSM/GPRS/Edge (2G) mode. Conventional handoff procedure is for the UMTS radio network controller (RNC), which controls base stations, to first commence compressed mode (CM) to enable user equipment (UE) to perform signal quality measurements and to report the best available GSM cells prior to cell change order (CCO). Compressed mode requires significant network resources and it is not necessary for packet switched (PS) services which are delay tolerant.
Disclosed is an apparatus and method for a relatively simple cell change order (CCO) transition from one network to another network (for example, 3G to 2G) without complex implementation of mobile operations. In particular, compressed mode is not required to implement a cell change order.
According to one aspect, a method for cell change order comprises issuing a cell change order message with no compressed mode measurement to a user equipment to find a target cell in a first network, performing a power scan on the first network to find a suitable cell if the target cell is not found, and camping on the suitable cell if the suitable cell is found.
According to another aspect, a method for cell change order comprises issuing a cell change order message with no compressed mode measurement to a user equipment to find a target cell in a first network, determining if the user equipment found the target cell, determining if a dedicated resource in a second network is reserved for the user equipment if the target cell is not found, performing a power scan on the first network to find a suitable cell if there is no dedicated resource in the second network, determining if the suitable cell is found, and returning to the second network if the suitable cell is not found or camping on the suitable cell if the suitable cell is found.
According to another aspect, a method for cell change order comprises issuing a cell change order message with no compressed mode measurement to a user equipment to find a target cell in a first network, determining that the user equipment found the target cell, and camping on the target cell.
According to another aspect, a user equipment comprising a processor and a memory, the memory containing program code executable by the processor for performing the following: issuing a cell change order message with no compressed mode measurement to a user equipment to find a target cell in a first network; performing a power scan on the first network to find a suitable cell if the target cell is not found; and camping on the suitable cell if the suitable cell is found.
According to another aspect, a user equipment comprising a processor and a memory, the memory containing program code executable by the processor for performing the following: issuing a cell change order message with no compressed mode measurement to a user equipment to find a target cell in a first network; determining if the user equipment found the target cell; determining if a dedicated resource in a second network is reserved for the user equipment if the target cell is not found; performing a power scan on the first network to find a suitable cell if there is no dedicated resource in the second network; determining if the suitable cell is found; and returning to the second network if the suitable cell is not found or camping on the suitable cell if the suitable cell is found.
According to another aspect, a user equipment comprising a processor and a memory, the memory containing program code executable by the processor for performing the following: issuing a cell change order message with no compressed mode measurement to a user equipment to find a target cell in a first network; determining that the user equipment found the target cell; and camping on the target cell.
According to another aspect, a computer-readable medium including program code stored thereon, comprises program code to issue a cell change order message with no compressed mode measurement to a user equipment to find a target cell in a first network, program code to perform a power scan on the first network to find a suitable cell if the target cell is not found, and program code to camp on the suitable cell if the suitable cell is found.
According to another aspect, a computer-readable medium including program code stored thereon, comprises program code to issue a cell change order message with no compressed mode measurement to a user equipment to find a target cell in a first network, program code to determine if the user equipment found the target cell, program code to determine if a dedicated resource in a second network is reserved for the user equipment if the target cell is not found, program code to perform a power scan on the first network to find a suitable cell if there is no dedicated resource in the second network, program code to determine if the suitable cell is found, and program code to return to the second network if the suitable cell is not found or camping on the suitable cell if the suitable cell is found.
According to another aspect, a computer-readable medium including program code stored thereon, comprises program code to issue a cell change order message with no compressed mode measurement to a user equipment to find a target cell in a first network, program code to determine that the user equipment found the target cell, and program code to camp on the target cell.
It is understood that other aspects will become readily apparent to those skilled in the art from the following detailed description, wherein it is shown and described various aspects by way of illustration. The drawings and detailed description are to be regarded as illustrative in nature and not as restrictive.
The detailed description set forth below in connection with the appended drawings is intended as a description of various aspects of the present disclosure and is not intended to represent the only aspects in which the present disclosure may be practiced. Each aspect described in this disclosure is provided merely as an example or illustration of the present disclosure, and should not necessarily be construed as preferred or advantageous over other aspects. The detailed description includes specific details for the purpose of providing a thorough understanding of the present disclosure. However, it will be apparent to those skilled in the art that the present disclosure may be practiced without these specific details. In some instances, well-known structures and devices are shown in block diagram form in order to avoid obscuring the concepts of the present disclosure. Acronyms and other descriptive terminology may be used merely for convenience and clarity and are not intended to limit the scope of the disclosure.
The various illustrative logical blocks, modules, and circuits described herein may be implemented or performed with one or more processors. A processor may be a general purpose processor, such as a microprocessor, a specific application processor, such a digital signal processor (DSP), or any other hardware platform capable of supporting software. Software shall be construed broadly to mean any combination of instructions, data structures, or program code, whether referred to as software, firmware, middleware, microcode, or any other terminology. Alternatively, a processor may be an application specific integrated circuit (ASIC), a programmable logic device (PLD), a field programmable gate array (FPGA), a controller, a micro-controller, a state machine, a combination of discrete hardware components, or any combination thereof The various illustrative logical blocks, modules, and circuits described herein may also include machine readable medium for storing software. The machine readable medium may also include one or more storage devices, a transmission line, or a carrier wave that encodes a data signal.
As examples, shown in
In one aspect, the 2G network includes GSM/GPRS/Edge, cdma one (IS-95) or others, etc. The 2G network 170 includes a plurality of 2G base stations 190 which serve as a 2G network interface between the user equipment 100 and terrestrial networks such as, but not limited to, the Public Switched Telephone Network (PSTN) 196, the Internet 197 or others, etc. In one aspect, the 2G network includes a 2G radio network controller 195 which is used to manage the connections between the user equipment 100 and the 2G base station 190. One skilled in the art would understand other radio network controllers with the functions described herein are included in other wireless networks.
3G network coverage, for example UMTS coverage, is not ubiquitous and can be spotty. Thus, wireless network operators rely on 2G network as a fallback network when 3G network coverage is unavailable. To accommodate the cell change order from 3G to 2G, the user equipment 100 is compatible with both 3G networks and 2G networks in a hybrid access mode. In one example, as the user equipment 100 moves out of 3G coverage, the wireless network transitions the user equipment 100 to a 2G network for coverage. Transition from the 3G network to the 2G network requires some finite time to implement and may degrade both network capacity and call reliability and performance.
In UMTS (3G) networks, the radio network controller (RNC) initiates an operational mode known as compressed mode (CM) to enable the user equipment 100 to measure and report back the best available GSM (2G) cell to the RNC. The RNC then uses these empirical measurements to generate a cell change order (CCO) directive to transition the user equipment 100 from 3G coverage (UMTS in this example) to 2G coverage (GSM in this example). However, using compressed mode requires significant network resources to implement. Delay tolerant transport services such as those employing packet switched (PS) technique do not typically require compressed mode.
Transport services between two communicating users are distinguished by the switching technique used to route information between the two users. Circuit switching (CS) is used in telephony networks. In the CS technique, a dedicated set of network resources, such as frequency slot, time slot, CDMA code, antenna beam, etc. are reserved along the wireless path between the user equipment 100 and the base station. These dedicated network resources are generally known as “circuit.” Information between the users flow in a continuous manner over one dedicated path. In this manner, the transport latency is minimized since the reserved network resources are dedicated for this user-base station path only. However, not all user applications require the dedicated allocation of network resources. For example, certain delay tolerant applications such as, but not limited to, message transfers, e-mails, file downloads, Web browsing and others etc. do not require a dedicated user-base station path.
In packet switching (PS) technique, information between users does not need to flow in a continuous manner over one dedicated path. Rather, in one aspect, the information can be first decomposed into discrete message blocks of variable size, known as packets. Additional overhead information is attached to each packet to provide, for example, a destination address. The packet switched service operates by routing each packet individually according to the destination address and the routing protocol used at each switching node in the network. Since in the packet switched services the network resources are not dedicated a priori, the information may travel along various paths. This versatility promotes efficient usage of network resources through statistical multiplexing and provides a simpler implementation of network resource allocation. However, in packet switched services, there may be the introduction of a variable transport delay between users. For communications that demand continuous message transport such as voice telephony, streaming video, etc., the transport service must be operated in a manner that the user perceives as a continuous stream. For discrete message transport such as message transfers, e-mail, file downloads, Web browsing, etc., the need for an emulation of continuous streams is not as great. These discrete message transports are often considered to be delay tolerant applications.
In one wireless network scenario, a user equipment 100 is first within the coverage of a 3G network 160. As the user equipment 100 moves out of the coverage of the 3G network 160, the 3G network must transition the user equipment 100 to a 2G network 170 if no other 3G networks are available. The 3G radio network controller 185 monitors the received signal quality between the 3G base station 180 and the user equipment 100. Based on these received signal quality, the 3G radio network controller 185 may interpret a degrading received signal as due to user equipment 100 motion out of the coverage area of the 3G network, If no other 3G networks are available, the 3G radio network controller 185 may decide to transition the user equipment 100 to the 2G network 170 coverage area. The 3G radio network controller 185 issues a cell change order (CCO) to initiate the transition by the user equipment 100 to the 2G network 170. Prior to the issuance of the CCO, the compressed mode (CM) is not enabled so that the user equipment need not measure and report back other available cells in the 2G network 170 while it is still within the 3G network coverage area. By not enabling the compressed mode, the burden of the wireless network operator is greatly reduced. The simplification in the CCO does not require implementation of the compressed mode for delay tolerant services and does not require monitoring equipments to determine the target cell from the 2G network prior to issuing the CCO message.
As illustrated in
The previous description of the disclosed aspects is provided to enable any person skilled in the art to make or use the present disclosure. Various modifications to these aspects will be readily apparent to those skilled in the art, and the generic principles defined herein may be applied to other aspects without departing from the spirit or scope of the disclosure.
The present application for patent claims priority to Provisional Application No. 60/889,248 entitled “Methods and Apparatus For Improving Packet Cell Change Order Procedure” filed Feb. 9, 2007, and assigned to the assignee hereof and hereby expressly incorporated by reference herein.
Number | Name | Date | Kind |
---|---|---|---|
6259917 | Elzein | Jul 2001 | B1 |
6463054 | Mazur et al. | Oct 2002 | B1 |
6925095 | Pecen et al. | Aug 2005 | B2 |
7085570 | Tigerstedt et al. | Aug 2006 | B2 |
7203512 | Jeong et al. | Apr 2007 | B2 |
20040242199 | Edlund et al. | Dec 2004 | A1 |
20050107109 | Gunaratnam et al. | May 2005 | A1 |
20050266845 | Aerrabotu et al. | Dec 2005 | A1 |
20060258386 | Jeong et al. | Nov 2006 | A1 |
20080037494 | Hietalahti et al. | Feb 2008 | A1 |
20080043679 | Karlsson et al. | Feb 2008 | A1 |
20080137612 | Gallagher et al. | Jun 2008 | A1 |
20080194257 | Zhang et al. | Aug 2008 | A1 |
20090061877 | Gallagher et al. | Mar 2009 | A1 |
20100099454 | Reddy | Apr 2010 | A1 |
20110228704 | Oerton | Sep 2011 | A1 |
Entry |
---|
International Search Report, PCT/US08/053348, International Search Authority, European Patent Office, Jul. 22, 2008. |
Written Opinion, PCT/US08/053348, International Search Authority, European Patent Office, Jul. 22, 2008. |
Muhammad, “Roaming from one G to another,” IEE Communication Engineer, Apr./May 2004, pp. 40-43, XP002487446. |
Lugara et al., “UMTS to GSM handover based on compressed mode technique,” 2004 IEEE International Conference on Communications, Paris, France, Jun. 20-24, 2004, pp. 3051-3055, vol. 5, IEEE, Piscataway, NJ, USA, XP010709763. |
Alsenmyr et al., “Handover between WCDMA and GSM,” Ericsson Review No. 1, 2003, pp. 6-11, XP002487447. |
Taiwan Search Report—TW097104966—TIPO—Aug. 3, 2011. |
Tung-Wen Huang, “Training report for 3G network radio resource management technology teacher training,” http://210.241.21.163/OpenFront/report/show—file.jsp?sysId=C09305546&fileNo=001 Dec. 16, 2004 Sections 1.2, 1.3, 2.4, 2.6; Fig. 2. |
Number | Date | Country | |
---|---|---|---|
20080194287 A1 | Aug 2008 | US |
Number | Date | Country | |
---|---|---|---|
60889248 | Feb 2007 | US |