General Electric (1983) publication filed by applicant (p. 1, first entry). |
General Electric, "Instructions, Cleaning of Main Steam Piping and Provision for Hydrostatic Testing of Reheater", entire text 1983. |
Brian E. Hopkinson & Omar Bravo, "Refinery Chemical Cleaning, Solution and Vapor Phase", Apr. 2, 1984, entire article. |
Dowel Schlumberger, "Pre-Operational Cleaning of Refinery and Petrochemical Plants", entire text, 1977. |
Chris Bloch, Mission Industrial Supply, "Enhanced Steam Blows" entire text, 1981. |
Chris Bloch, Dow Industrial Services, "D.I.S. Introductory Engineering Handbook", 1974 edition, entire text. |
The Engineering Dept. of Crain Co., "Flow of Fluids through Valves Fitting and Pipe" (technical paper No. 410), 1957-1986, entire text. |
Govier and Aziz, "The Flow of Complex Mixtures in Pipes", 1972, pp. 416-452 and 589-616. |
Claude B. Nolte, "Optimum Pipe Size Selection", 1979, pp. 47-67. |
Norman B. Miller and John W. Siegmond, "Chemical Cleaning Practices Used for Controlling Solid Particle Erosion of Steam Turbines", about 1985, pp. 3-29, to 3-47. |
C. E. Fox, "Many Traditional Chemical Cleaning Problems Eliminated by New Chemicals and New Techniques", May, 1964, p. 3. |
Vern Duckett, "Main Steam Line Blowdown Rust Inter-Office Correspondence", Feb. 17, 1984, entire document. |
Anthony W. Montana, "A Results Report", Nov. 6, 1984, entire work. |
Edwin J. Brailey, Jr. "A Review of Exfoliation Chemical Cleaning Experience in the New England Electric System", 1985, pp. 3-49 to 3-60. |
W. E. Stevens and John Gatewood, "Practices for Chemical Cleaning of Steam Cycle Pendant Loops and Steam Leads", 1985, pp. 3-61 to 3-73. |
Unknown Employee of Combustion Engineering, "Combustion Engineering Resource Recovery Systems", project initiation on Jul. 13, 1987, entire document. |
Letter of Century Contractors West, Inc., Subject--"Steam Blow", Jan. 22, 1987, entire document. |
Unknown Employee of Hatachi, Ltd., "Hatachi, Ltd.--Steam Blowing Procedure of Gland Steam Pipe", not dated, entire document. |
G. Wolch, Letter and attachments of Baltimore Resco Refuse Energy Systems Company entitled "Main Steam Lines Blowing Procedure", Aug. 23, 1984, entire document. |
Joseph G. Singer, "Combustion-Fossil Power Systems", third edition 1981, pp. 10-20 to 20-23. |