Method and apparatus for determining the dynamic range of an optical link in an HFC network

Information

  • Patent Grant
  • 9088355
  • Patent Number
    9,088,355
  • Date Filed
    Wednesday, December 13, 2006
    17 years ago
  • Date Issued
    Tuesday, July 21, 2015
    9 years ago
Abstract
The dynamic range of an optical link in a network is determined by simultaneously transmitting signals from two network elements at first and second frequencies, which create a combined signal at a third frequency. The transmission power levels of selected network elements is successively increased until the measured power from the third frequency no longer changes in a predictable manner, at which point the upper limit of the dynamic range of the optical link is determined.
Description
FIELD OF THE INVENTION

This disclosure is directed toward determining the dynamic range of an optical link in an HFC network. More particularly, this disclosure is directed toward an automated approach to detecting an upper limit to the dynamic range of an optical link including the occurrence of laser clipping.


BACKGROUND OF THE INVENTION

Hybrid fiber coaxial (HFC) cable television systems have been in widespread use for many years and extensive networks have been developed. A typical HFC network generally contains a headend which provide communications between user in the HFC network and the IP/PSTN networks. The headend usually contains a cable modem termination system (CMTS) containing several receivers, each receiver handling communications between hundreds of end user network elements. The headend is generally connected to several nodes and each node is connected to many network elements, such as data over cable system (DOCSIS) terminal network elements (e.g. media terminal adapters (MTA) or cable modems), e.g., a single node may be connected to hundreds of modems. In many instances several nodes may serve a particular area of a town or city.


A typical HFC network uses optical fiber for communications between the headend and the nodes, and uses coaxial cable for communications between the nodes and the end users. Downstream optical communications over the optical fiber are typically converted at the nodes to RF communications for transmission over the coaxial cable. Conversely, upstream (or return path) RF communications from the users are provided over the coaxial cables and are typically converted at the nodes to optical communications for transmission over the optical fiber. The return path optical link (the optical components in the HFC network, e.g. the transmission lasers, optical receivers, and optical fibers) contribute to the performance of the HFC network. More particularly, the optical components contribute to the quality of signals received by the CMTS from the users, and may cause distortion of the signals or otherwise degrade their quality.


Driving the RF input power too high at the optical transmitter in the return path on a node, via either mismanagement of the active channels or ingress noise, often creates excess distortion and degrades the quality of the received signals at the CMTS. This overdriving condition is typically known as laser clipping, which may be corrected by properly managing the RF input power to the transmitter and allowing for adequate headroom to withstand ingress events.


However, the cause for the overdriving condition and laser clipping is often difficult to detect when it occurs due to the burstiness of the signals typically present on the return path. Currently, diagnosing the cause for laser clipping requires a technician or engineer to be at multiple locations within the HFC plant simultaneously with specialized test equipment, such as a vector signal analyzer and signal generators. This manual diagnostic process is labor intensive, time consuming and costly.


SUMMARY OF THE INVENTION

This disclosure explains an automated process to determine dynamic range of the return path optical link in conjunction with measurements made at the headend via a CMTS device, which does not require rolling trucks to remote locations within a HFC plant.


In accordance with principles of the invention, an apparatus for measuring a network may comprise: a controller configured to instruct a first network element to transmit a first signal at a first frequency f1 and a second network element to transmit a second signal at a second frequency f2 so that the first signal and the second signal are received by a common node at the same time; a receiver configured to receive communications on a third frequency f3 based on the first signal from the first network element and the second signal from the second network element, whereby the third frequency f3 is a combination of the first signal from the first network element at the first frequency f1 and the second signal from the second network element at the second frequency f2; and a power monitoring unit which is configured to measure power in signals contained in the third frequency, wherein the controller is configured to determine a dynamic range of an optical link based on the measured power in the signals contained in the third frequency.


An upper limit to the dynamic range of the optical link may be determined when an increase in power level in frequency f3 is not in a predictable manner.


Also in accordance with the present invention a method for determining a dynamic range of an optical link in a network may comprise the steps of: selecting a first network element to transmit a first signal at a first frequency f1 and a second network element to transmit a second signal at a second frequency f2 so that the first signal and the second signal are received by a common node at the same time; receiving communications on a third frequency f3, whereby the third frequency f3 is a combination of the first signal from the first network element at the first frequency f1 and the second signal from the second network element at the second frequency f2; measuring power in signals contained in the third frequency; and determining a dynamic range of an optical link based on the measured power in the signals contained in the third frequency.


In accordance with the principles of the invention, a computer readable medium carrying instructions for a computer to perform a method for determining a dynamic range of an optical link in a network may comprise the steps of: selecting a first network element to transmit a first signal at a first frequency f1 and a second network element to transmit a second signal at a second frequency f2 so that the first signal and the second signal are received by a common node at the same time; receiving communications on a third frequency f3, whereby the third frequency f3 is a combination of the first signal from the first network element at the first frequency f1 and the second signal from the second network element at the second frequency f2; measuring power in signals contained in the third frequency; and determining a dynamic range of an optical link based on the measured power in the signals contained in the third frequency.


The invention enables the technician or engineer to remotely characterize upstream dynamic range (or headroom) of optical links at a central location, such as the headened, such as by using the Motorola BSR64000, rather than using external test equipment, such as the vector signal analyzer and deploying technicians to various locations within the cable plant. The invention also avoids impacting active services. It also allows the cable operator to plan for future offerings and schedule needed maintenance by allowing periodic monitoring of the dynamic range of the optical link. All measurements may be made through the use of the existing terminal devices (specifically, DOCSIS terminal devices such as MTAs and cable modems) as well as headend equipment (specifically a DOCSIS CMTS).


Accurate knowledge of the dynamic range (or headroom) of an optical link will enable an operator to utilize the available resources of their network more efficiently, such as by adding additional network elements to portions of the network, which has a limited dynamic range, to avoid disruption of the signals from the optical link and to improve signal quality and network speed.





BRIEF DESCRIPTION OF THE DRAWINGS

The following drawings serve to illustrate the principles of the invention.



FIG. 1 illustrates an exemplary network in accordance with the principles of the invention.



FIG. 2 illustrates an exemplary CMTS architecture in accordance with the principles of the invention.



FIG. 3 illustrates an exemplary receiver arrangement which may communicate with an exemplary CMTS of the present invention.



FIG. 4 illustrates an exemplary architecture of an optical transceiver in a headend which may contain an exemplary CMTS of the present invention.



FIG. 5 illustrates an exemplary architecture of a network element which may communicate with an exemplary CMTS of the present invention.



FIG. 6 illustrates an exemplary process in accordance with the principles of the present invention.





DETAILED DESCRIPTION OF THE INVENTION

This disclosure provides for a dynamic range characterization of an optical link and the identification of available upstream frequency regions which would support communications. The methodology described in this invention instructs two DOCSIS terminal devices (cable modems or MTAs) to transmit simultaneously and measures the affects on a third frequency communication channel. Subsequently, power is increased for the two DOCSIS terminal devices until, nonlinear behavior at a known distortion frequency location is detected. That is, it monitors the affects of increasing power in the return-path of the cable network on a communications signal and logs the total power added when the power no longer changes in a predictable manner. The approach detailed in this disclosure requires that the two DOCSIS terminal devices reside on the same optical node. A methodology for isolating devices which reside on the same optical node is provided in a commonly assigned disclosure Attorney Docket No. BCS04122, entitled METHOD AND APPARATUS FOR GROUPING TERMINAL NETWORK DEVICES filed on Sep. 5, 2006 and assigned U.S. Ser. No. 11/470,034, herein incorporated by reference in its entirety. Preferably, the dynamic range test should not occur in conjunction with other changes in the network, such as changing of optical routing, ingress level switching or any other routine or event that will likely cause RF levels to be unstable.


Adequate margin should also preferably be available in the network to allow the addition of 2 DOCSIS channels. A methodology for determining the available power margin in a network is described in commonly assigned disclosure Attorney Docket No. BCS04121, entitled METHOD AND APPARATUS FOR DETERMINING THE TOTAL POWER MARGIN AVAILABLE FOR AN HFC NETWORK filed on Oct. 20, 2006 and assigned U.S. Ser. No. 11/551,014, herein incorporated by reference in its entirety.


Preferably, an active Return Path is providing services at the time that the operator desires to associate (group) network elements according to common optical nodes. Also, this test picks test frequency locations based upon avoiding interference of 2nd order intermods on active data services. We are assuming adequate margin is available such that 3rd order products are not a problem for the active services.



FIG. 1 illustrates an exemplary network in which a plurality of terminal network elements 8 (e.g. cable modems, set top boxes, televisions equipped with set top boxes, or any other element on a network such as an HFC network) are connected to a cable modem termination system (CMTS) 10 located in a headend 14 through nodes 12 and one or more taps (not shown). In an exemplary arrangement, headend 14 also contains an optical transceiver 16 which provides optical communications through an optical fiber to the plurality of nodes 12. The CMTS 10 connects to an IP or PSTN network 6. Those of skill in the art will appreciate that there may be a plurality of nodes 12 connected to a headend, and a headend may contain a plurality of CMTS units, each of which contain a plurality of receivers (e.g. 8 receivers) each of which communicate with a plurality (e.g. 100 s) of network elements 8. The CMTS 10 may also contain a spare receiver which is not continuously configured to network elements 8, but may be selectively configured to network elements 8. Use of a spare receiver is described in commonly assigned patent application Ser. No. 11/171,066, filed on Jun. 30, 2005 and titled Automated Monitoring of a Network, herein incorporated by reference in its entirety.



FIG. 2 illustrates a logical architecture of an exemplary CMTS 10 to facilitate an understanding of the invention. As illustrated in FIG. 2, CMTS 10 may contain a processing unit 100 which may access a RAM 106 and a ROM 104, and may control the operation of the CMTS 10 and RF communication signals to be sent by the network elements 8 to the CMTS 10. Processing unit 100 preferably contains a microprocessor 102 which may receive information, such as instructions and data, from a ROM 104 or RAM 106. Processing unit 100 is preferably connected to a display 108, such as a CRT or LCD display, which may display status information such as whether a station maintenance (SM) is being performed or a receiver is in need of load balancing. An input keypad 110 may also be connected to processing unit 100 and may allow an operator to provide instructions, processing requests and/or data to processor 100.


RF transceiver (transmitter/receiver) unit 3 preferably contains a plurality of transmitters 4 and receivers 2 to provide bidirectional communication with a plurality of network elements 8 through optical transceivers 16, nodes 12 and a plurality of network taps (not shown). Those of skill in the art will appreciate that CMTS 10 may contain a plurality of RF receivers 2, e.g. 8 RF receivers and a spare RF receiver. Each RF receiver 2 may support over 100 network elements. The RF receiver 2, such as a Broadcom 3140 receiver, preferably provides the received RF signals to an equalizer (not shown) which is used to acquire equalizer values and burst modulation error ratio (MER) measurements, packet error rate (PER) and bit error rate (BER). The equalizer is preferably a multiple tap linear equalizer (e.g. a 24 tap linear equalizer), which also may be known as a feed forward equalizer (FFE). The equalizer may be integrally contained in RF receiver 2 or may be a separate device. The communication characteristics of each receiver 2 may be stored on ROM 104 or RAM 106, or may be provided from an external source, such as headend 14. RAM 104 and/or ROM 106 may also carry instructions for microprocessor 102.


RF receiver 2 may also include a Fast Fourier Transform (FFT) module 108 such as a Broadcom 3140 receiver FFT, identifies frequencies in the optical signals received and provides desired frequencies to power monitoring unit 120. Preferably, the FFT supports different windows, and sample lengths (256, 512, 1024, 2048) with an output of frequency of 0-81.92 MHz. Minimum resolution results from maximum window length of 2048 samples and yields an FFT cell resolution of 80 kHz.



FIG. 3 illustrates a logical arrangement of a group of receivers 2 to facilitate an understanding of the invention. As illustrated in FIG. 3 a spare receiver 204 may be tapped into each of the primary receiver ports 220 (e.g. R0-R7) in a non-intrusive manner. As illustrated, CMTS receiver ports 220, which may be in the form of Amphenol connectors, are provided to allow cables, e.g. coaxial cables, (not shown) to be connected with primary receivers 2. The receivers 2 provide data signals to CMTS 10 through ports 212, and spare receiver 204 provides data signals to CMTS 10 through port 214.


Spare receiver 204 preferably taps into signal lines 221 of primary receiver ports 220 via signal lines 222, and the taps are preferably located where the cable signal comes from receiver ports 220 into the receivers 2 so both the connected primary receiver 2 and the spare receiver 204 may receive the same signal. Those of skill in the art will appreciate that each of the primary receivers 2 (e.g. receivers R0-R7) receive signals according to different communication characteristics, e.g. communication on a different frequency (RF band) and communication protocols. Spare receiver 204 is preferably tunable to the RF bands of each of the primary receivers 2. Preferably, the spare receiver 204 connects (matrices) with only one primary receiver 2 at a time.


When a cable operator initiates a testing operation they may select any registered network element of their choice or the CMTS 10 may select the network element for them. Once the network element has been selected it is moved (tuned to the frequency) to the spare receiver testing data is passed to it and the results are measured. Once the testing measurements are completed the network element is moved back (instructed to retune to frequency of the primary receiver) to its original primary receiver. This whole process is preferably performed without deregistering the network element from the network to avoid disrupting the subscriber's service or any other services on the primary receiver to other subscribers.



FIG. 4 illustrates further detail of an exemplary optical transceiver 16 in headend 14. Optical transceiver 16 preferably includes an optical receiver 316 configured to receive optical signals through an optical fiber from nodes 12. A laser transmitter 312 provides downstream optical communications to nodes 12 through an optical fiber. Laser transmitter 312 is typically assigned to communicate with a single node. Signals received by the optical receiver 316 converted to RF signals and transmitted to by RF transmitter 322 to the receivers 2. Signals from the receivers 2 are received by RF receiver 324 and provided to laser transmitter 312 for transmission to the nodes 12. CPU 30 preferably contains a microprocessor 301 which interacts with RAM 306 and ROM 304 and controls the operation of the receiver 316 and the laser 312.


Upon receiving a downstream communication signal from a network element, via CMTS 10, CPU 30 preferably provides instructions to modulate one of the laser transmitters 312 to transmit the communication signal to nodes 12. Optical receivers 316 are preferably configured to monitor the optical signal transmitted by nodes 12, such as by receiving a portion of the signal.



FIG. 5 illustrates an exemplary network element 8, such as a cable modem. Network element 8 preferably contains a processor 302 which may communicate with a RAM 306 and ROM 304, and which controls the general operation of the network element 8, including the pre-equalization parameters and preamble lengths of communications sent by the network element in accordance with instructions from the CMTS 10. Network element 8 also contains a transceiver (which includes a transmitter and receiver) which provides bidirectional RF communication with CMTS 10. Network element 8 may also contain an equalizer unit 316 which may equalize the communications received from and sent to CMTS 10. Network element 8 may also contain an attenuator 320 which may be controlled by microprocessor to attenuate signals to be transmitted to be within a desired power level. Those of skill in the art will appreciate that the components of network element 8 have been illustrated separately only for discussion purposes and that various components may be combined in practice.


In a preferred implementation, the present invention may use a DOCSIS network element, such as a cable modem, to generate the test signals. Accordingly, the test signals may be implemented using one of the available upstream DOCSIS bandwidths, e.g. 200 kHz, 400 kHz, 800 kHz, 1600 kHz, 3200 kHz or 6400 kHz. A preferred implementation may use the narrow 800 kHz bandwidth at the upper band edge where diplexer rolloff is significant since narrow bandwidths minimize the amount of clean spectrum required within the return path, and because many modems have problems with the 400 and 200 kHz widths. Wider bandwidths may be used where available spectrum permits in order to gain improved resolution in the measurements.


An exemplary process for automatically determining the dynamic range of the optical link in the network, e.g. on an optical node is illustrated in FIG. 6. As illustrated in step S0 of FIG. 6, two network elements NE1 and NE2 are selected to be used in the process. Preferably, the two modems are connected to the same HFC node and return laser, are currently idle, have sufficient ability to have their transmit power turned up by (15) dB, and can be controlled remotely by the CMTS to move to new frequencies at command and change their transmission power level. The two network elements will be instructed to transmit on a channel which impacts the test frequency, whose power is increased sufficiently to cause loading (compression) of the RF devices (most likely the return laser transmitter) in the system.


As illustrated in step S2 of FIG. 6, the power of the test frequency band (Pbase), e.g. the expected band for the test frequency f3, such as 42-52 MHz, is measured, and the power in a 1 MHz band around f3 (Pref) is measured. These measurements provide a reference baseline power of the test frequency band, as illustrated in FIG. 6. In a preferred implementation, these measurements may be performed as an incremental power measurement of the band of interest (42-52) MHz and may be recorded showing amplitude vs. frequency for at least 10 times showing occupied frequency bands and periodicity of channels on the network and to eliminate the possibility that a coincidental ingress happened at the exact same instance as the measurement. An estimation of the total network RF power vs. single channel power may also be mathematically estimated from measured data.


The output power level of the selected network elements NE1 and NE2 is determined in step S4. The power may be measured at the CMTS, for example by measuring the received RF power at FFT module 108 and Power monitor module 120. Alternatively, power may be determined from the settings on attenuator 320 of network element 8. The measured power of network elements NE1 and NE2 preferably serve as the nominal power setting for PL1 and PL2 in the test.


As illustrated in step S6 of FIG. 6, network element 1 is assigned to frequency f1 and network element 2 is assigned to frequency f2. Preferably, the f1 and/or f2 are vacant frequency slots which can occupy QSPK, 800 kS/sec. It is assumed that the output power level of the network elements NE1 and NE2 will not change with the assignment of new frequencies. Preferably, the measured power level will be the initial power levels PL1 and PL2, respectively.


Ideally, we want to find two frequencies f1 and f2 to assign network elements NE1 and NE2 which produce a 2nd order intermod at a third frequency (the test frequency) in the test frequency band of about 42-52 MHz. Each of the three frequencies are preferably within the 5-42 MHz spectrum. The possible frequencies may be identified by a plurality of techniques, such as by empirically determining usable frequency regions for QPSK (quadrature phase shift keying, also referred to as four QAM) transmission from a survey process. The two frequencies are also preferably selected such that the second order products (f3) from these frequencies do not fall on desired traffic in the network, if possible. Preferably, frequencies f1 and f2 can be activated as DOCSIS upstream channels with default upstream CMTS receive levels without causing any significant harm to any other active services.


As illustrated in step S8 of FIG. 6, network elements NE1 and NE2 are instructed to transmit signals at the initial power level PL1 and PL2, respectively so that the signal from the first network element and the signal from the second network element interfere with each other to produce a third signal at a third frequency. Accordingly, the signals may be transmitted simultaneously or the transmission of one of the signals from one of the network element may be delay to accommodate for transmission delays in the network to make sure the respective signals from the first network element NE1 and the second network element NE2 are received by their common node at the same time. PL1 and PL2 may be the same power level and may be at level L which was assigned as the nominal power level. In this step, network elements 1 and 2 are preferably instructed to perform a station maintenance (SM) burst at exactly the same time. Those of skill in the art will appreciate that this may be done by lining up the minislots in the MAPS for the two upstream channels associated with network elements A and B. Those of skill in the art will also appreciate that the MAP or MAPS data provide a schedule of time slots which allocates different network elements specific time intervals in which they are allowed to transmit data to the CMTS. From a CMTS software perspective, this should not be a complicated problem as the IM broadcast intervals are already aligned across all channels within a single spectrum group. The FFT processor should also be configured to trigger samples based upon the MAP minislot interval when the two SM bursts from the network elements will align.


The power of the test frequency band (Ptb), e.g. the expected band for the test frequency f3, such as 42-52 MHz, is measured, and the power in a 1 MHz band around f3 (Pf3) is measured again, as illustrated in step S10. The power may be measured at the CMTS, for example by measuring the received RF power at FFT module 108 and Power monitor module 120. Alternatively, power may be determined from the settings on attenuator 320 of network element 8. It may be desirable to perform steps S8 and S10 a number of times (e.g. 10 times) to eliminate the possibility that a coincidental ingress happened at the exact same instance as the SM bursts, which may affect the power measurement. In doing so, an average measured power, a mean measured power or a lowest value of measured power may be used.


The CMTS spare receiver may be used to make the power measurements to avoid impacting service provided to customers. Alternatively, another receiver could be used to make the measurements by being taken “off line” or by adjusting for the impact caused by normal service.


If the simultaneous transmission has increased the power levels in the test frequency band and the 1 MHz bandwidth around the test frequency in a predictable expected manner (e.g. by 9 dB for a 3 dB increase in power by NE1 and NE2), step S12, Yes, the optical link is not degrading the signals, so the power levels PL1 and/or PL2 are increased, such as by 3 dB, step S18. Steps S8 through S12 are repeated with the increased transmit power levels. If the simultaneous transmission has increased the power levels in the test frequency band and the 1 MHz bandwidth around the test frequency in an unpredictable manner, step S12, No, the optical link is degrading the signals, such as by clipping the signals. The measured power levels of the test frequency band (Ptb) and the 1 MHz band around f3 (Pf3) are compared with the initial power of the test frequency band (Pbase) and the 1 MHz band around f3 (Pf3), from step S2 to determine the power added, which provides the available headroom in the optical link prior to degrading the signals. The measured and calculated values are logged in step S16.


The processes in FIG. 6 may be implemented in hard wired devices, firmware or software running in a processor. A processing unit for a software or firmware implementation is preferably contained in the CMTS. Any of the processes illustrated in FIG. 6 may be contained on a computer readable medium which may be read by microprocessor 102. A computer readable medium may be any medium capable of carrying instructions to be performed by a microprocessor, including a CD disc, DVD disc, magnetic or optical disc, tape, silicon based removable or non-removable memory, packetized or non-packetized wireline or wireless transmission signals.


The invention enables the technician or engineer to remotely characterize upstream dynamic range (or headroom) of optical links at a central location, such as the headened, such as by using the Motorola BSR64000, rather than using external test equipment, such as the vector signal analyzer and deploying technicians to various locations within the cable plant. The invention also avoids impacting active services. It also allows the cable operator to plan for future offerings and schedule needed maintenance by allowing periodic monitoring of the dynamic range of the optical link. All measurements may be made through the use of the existing terminal devices (specifically, DOCSIS terminal devices such as MTAs and cable modems) as well as headend equipment (specifically a DOCSIS CMTS).


Accurate knowledge of the dynamic range (or headroom) of an optical link will enable an operator to utilize the available resources of their network more efficiently, such as by adding additional network elements to portions of the network with a small headroom to avoid disruption of the signals from the optical link and to improve signal quality and network speed.

Claims
  • 1. An apparatus for measuring a network comprising: a controller configured to instruct a first network element to transmit a first signal at a first frequency f1 and a second network element to transmit a second signal at a second frequency f2 so that the first signal and the second signal are received by a common node at the same time;a receiver configured to receive communications on a third frequency f3 based on the first signal from the first network element and the second signal from the second network element, whereby the third frequency f3 is a combination of the first signal from the first network element at the first frequency f1 and the second signal from the second network element at the second frequency f2; anda power monitoring unit which is configured to measure power levels in an RF band comprising the third frequency while receiving signals on the third frequency,wherein the controller is configured to determine a dynamic range of an optical link based on the measured power levels in the RF band comprising the third frequency.
  • 2. The apparatus of claim 1, wherein the power monitoring unit is further configured to measure power levels in an expected frequency band of the third frequency, the expected frequency band being less than an assigned communication bandwidth of an upstream communication bandwidth of the network.
  • 3. The apparatus of claim 2, wherein the power monitoring unit is further configured to measure power in a 1 MHz band around the third frequency f3.
  • 4. The apparatus of claim 1, wherein the controller is configured to determine an upper limit to the dynamic range of the optical link by determining when an increase in power level in frequency f3 is not in a predictable manner.
  • 5. The apparatus of claim 4, wherein the controller is configured to instruct at least one of the first network element or the second network element to increase transmission power of the first signal or the second signal, respectively, when the upper limit of the dynamic range of the optical link has not been reached.
  • 6. The apparatus of claim 1, wherein the first frequency f1 and the second frequency f2 are selected so that an interaction between f1 and f2 produces an intermodulation frequency at the third frequency f3.
  • 7. A method for determining a dynamic range of an optical link in a network comprising the steps of: selecting, by a microprocessor, a first network element to transmit a first signal at a first frequency f1 and a second network element to transmit a second signal at a second frequency f2 so that the first signal and the second signal are received by a common node at the same time;receiving communications, by a receiver, on a third frequency f3, whereby the third frequency f3 is a combination of the first signal from the first network element at the first frequency f1 and the second signal from the second network element at the second frequency f2;measuring power in signals contained in the third frequency; anddetermining a dynamic range of the optical link based on the measured power levels in the RF band comprising the third frequency.
  • 8. The method of claim 7, wherein the step of measuring power measures power in an expected frequency band of the third frequency, the expected frequency band being less than an assigned communication bandwidth of an upstream communication bandwidth of the network.
  • 9. The method of claim 8, wherein the step of measuring power measures power in a 1 MHz band around the third frequency f3.
  • 10. The method of claim 7, wherein the step of determining a dynamic range of an optical link determines an upper limit to the dynamic range of the optical link by determining when an increase in power level in frequency f3 is not in a predictable manner.
  • 11. The method of claim 7, further comprising the step of instructing at least one of the first network element or the second network element to increase transmission power of the first signal or the second signal, respectively, when an upper limit of the dynamic range of the optical link has not been reached.
  • 12. The method of claim 7, wherein the first frequency f1 and the second frequency f2 are selected so that an interaction between f1 and f2 produces an intermodulation frequency at the third frequency f3.
  • 13. A non-transitory computer readable medium comprising stored instructions which, when executed by one or more processors of a computer, cause the computer to perform steps of a method for determining a dynamic range of an optical link in a network comprising: selecting a first network element to transmit a first signal at a first frequency f1 and a second network element to transmit a second signal at a second frequency f2 so that the first signal and the second signal are received by a common node at the same time;receiving communications on a third frequency f3, whereby the third frequency f3 is a combination of the first signal from the first network element at the first frequency f1 and the second signal from the second network element at the second frequency f2;measuring power in signals contained in the third frequency; anddetermining a dynamic range of the optical link based on the measured power levels in the RF band comprising the third frequency.
  • 14. The computer readable medium of claim 13, wherein the step of measuring power measures power in an expected frequency band of the third frequency, the expected frequency bandwidth being less than an assigned communication bandwidth of an upstream communication bandwidth of the network.
  • 15. The computer readable medium of claim 14, wherein the step of measuring power measures power in a 1 MHz band around the third frequency f3.
  • 16. The computer readable medium of claim 13, wherein the step of determining a dynamic range of an optical link determines an upper limit to the dynamic range of the optical link by determining when an increase in power level in frequency f3 is not in a predictable manner.
  • 17. The computer readable medium of claim 13, the steps further comprising instructing at least one of the first network element or the second network element to increase transmission power of the first signal or the second signal, respectively, when an upper limit of the dynamic range of the optical link has not been reached.
  • 18. The computer readable medium of claim 13, wherein the first frequency f1 and the second frequency f2 are selected so that an interaction between f1 and f2 produces an intermodulation frequency at the third frequency f3.
Parent Case Info

This application claims the benefit of U.S. Provisional Application No. 60/785,648 filed on Mar. 24, 2006, titled “Laser Dynamic Range Test”, herein incorporated by reference in its entirety.

US Referenced Citations (342)
Number Name Date Kind
3838221 Schmidt et al. Sep 1974 A
4245342 Entenman Jan 1981 A
4385392 Angell et al. May 1983 A
4811360 Potter Mar 1989 A
4999787 McNally et al. Mar 1991 A
5197064 Chao et al. Mar 1993 A
5228060 Uchiyama Jul 1993 A
5251324 McMullan et al. Oct 1993 A
5271060 Moran, III et al. Dec 1993 A
5278977 Spencer et al. Jan 1994 A
5347539 Sridhar et al. Sep 1994 A
5390339 Bruckert et al. Feb 1995 A
5463661 Moran, III et al. Oct 1995 A
5532865 Utsumi et al. Jul 1996 A
5557603 Barlett et al. Sep 1996 A
5606725 Hart Feb 1997 A
5631846 Szurkowski May 1997 A
5692010 Nielsen Nov 1997 A
5694437 Yang et al. Dec 1997 A
5732104 Brown et al. Mar 1998 A
5757526 Shiragaki et al. May 1998 A
5771274 Harris Jun 1998 A
5790523 Ritchie et al. Aug 1998 A
5862451 Grau et al. Jan 1999 A
5867539 Koslov Feb 1999 A
5870429 Moran, III et al. Feb 1999 A
5886749 Williams et al. Mar 1999 A
5939887 Schmidt et al. Aug 1999 A
5943604 Chen et al. Aug 1999 A
6032019 Chen et al. Feb 2000 A
6061393 Tsui et al. May 2000 A
6108351 Hardy et al. Aug 2000 A
6154503 Strolle Nov 2000 A
6229792 Anderson et al. May 2001 B1
6230326 Unger et al. May 2001 B1
6233274 Tsui et al. May 2001 B1
6240553 Son et al. May 2001 B1
6272150 Hrastar et al. Aug 2001 B1
6278730 Tsui et al. Aug 2001 B1
6308286 Richmond et al. Oct 2001 B1
6310909 Jones Oct 2001 B1
6321384 Eldering Nov 2001 B1
6330221 Gomez Dec 2001 B1
6334219 Hill et al. Dec 2001 B1
6377552 Moran, III et al. Apr 2002 B1
6385773 Schwartzman et al. May 2002 B1
6389068 Smith et al. May 2002 B1
6434583 Dapper et al. Aug 2002 B1
6445734 Chen et al. Sep 2002 B1
6456597 Bare Sep 2002 B1
6459703 Grimwood et al. Oct 2002 B1
6477197 Unger Nov 2002 B1
6477526 Hayashi et al. Nov 2002 B2
6480469 Moore et al. Nov 2002 B1
6483033 Simoes et al. Nov 2002 B1
6498663 Farhan et al. Dec 2002 B1
6512616 Nishihara Jan 2003 B1
6526260 Hick et al. Feb 2003 B1
6546557 Ovadia Apr 2003 B1
6556239 Al Araji et al. Apr 2003 B1
6556562 Bhagavath et al. Apr 2003 B1
6556660 Li et al. Apr 2003 B1
6559756 Al-Araji et al. May 2003 B2
6563868 Zhang et al. May 2003 B1
6570394 Williams May 2003 B1
6570913 Chen May 2003 B1
6574797 Naegeli et al. Jun 2003 B1
6588016 Chen et al. Jul 2003 B1
6606351 Dapper et al. Aug 2003 B1
6611795 Cooper Aug 2003 B2
6646677 Noro et al. Nov 2003 B2
6662135 Burns et al. Dec 2003 B1
6662368 Cloonan et al. Dec 2003 B1
6671334 Kuntz et al. Dec 2003 B1
6687632 Rittman Feb 2004 B1
6690655 Miner et al. Feb 2004 B1
6700875 Schroeder et al. Mar 2004 B1
6700927 Elsiger et al. Mar 2004 B1
6711134 Wichelman et al. Mar 2004 B1
6741947 Wichelman et al. May 2004 B1
6748551 Furudate et al. Jun 2004 B2
6757253 Cooper et al. Jun 2004 B1
6772388 Cooper et al. Aug 2004 B2
6772437 Cooper et al. Aug 2004 B1
6775840 Naegel et al. Aug 2004 B1
6785473 Sasaki et al. Aug 2004 B1
6816463 Cooper et al. Nov 2004 B2
6834057 Rabenko et al. Dec 2004 B1
6839829 Daruwalla et al. Jan 2005 B1
6853932 Wichelman et al. Feb 2005 B1
6877166 Roeck et al. Apr 2005 B1
6895043 Naegeli et al. May 2005 B1
6895594 Simoes et al. May 2005 B1
6906526 Hart, Jr. et al. Jun 2005 B2
6928475 Schenkel et al. Aug 2005 B2
6944881 Vogel Sep 2005 B1
6961314 Quigley et al. Nov 2005 B1
6961370 Chappell Nov 2005 B2
6967994 Boer et al. Nov 2005 B2
6973141 Isaksen et al. Dec 2005 B1
6985437 Vogel Jan 2006 B1
6987754 Shahar et al. Jan 2006 B2
6999408 Gomez Feb 2006 B1
7002899 Azenkot et al. Feb 2006 B2
7010002 Chow et al. Mar 2006 B2
7017176 Lee et al. Mar 2006 B1
7027685 Harres Apr 2006 B2
7032159 Lusky et al. Apr 2006 B2
7039939 Millet et al. May 2006 B1
7050419 Azenkot et al. May 2006 B2
7054554 McNamara et al. May 2006 B1
7058007 Daruwalla et al. Jun 2006 B1
7072365 Ansley Jul 2006 B1
7079457 Wakabayashi et al. Jul 2006 B2
7099412 Coffey Aug 2006 B2
7099580 Bulbul Aug 2006 B1
7139283 Quigley et al. Nov 2006 B2
7142609 Terreault et al. Nov 2006 B2
7145887 Akgun et al. Dec 2006 B1
7152025 Lusky et al. Dec 2006 B2
7158542 Zeng et al. Jan 2007 B1
7164694 Nodoushani et al. Jan 2007 B1
7177324 Choudhury et al. Feb 2007 B1
7197067 Lusky et al. Mar 2007 B2
7209656 Peddanarappagari et al. Apr 2007 B2
7222255 Claessens et al. May 2007 B1
7227863 Leung et al. Jun 2007 B1
7242862 Saunders et al. Jul 2007 B2
7246368 Millet et al. Jul 2007 B1
7263123 Yousef Aug 2007 B2
7274735 Lusky et al. Sep 2007 B2
7286756 Marshall et al. Oct 2007 B1
7295518 Monk et al. Nov 2007 B1
7315573 Lusky et al. Jan 2008 B2
7315967 Azenko et al. Jan 2008 B2
7400677 Jones Jul 2008 B2
7421276 Steer et al. Sep 2008 B2
7451472 Williams Nov 2008 B2
7492703 Lusky et al. Feb 2009 B2
7554902 Kim et al. Jun 2009 B2
7573884 Klimker et al. Aug 2009 B2
7573935 Min et al. Aug 2009 B2
7584298 Klinker et al. Sep 2009 B2
7616654 Moran et al. Nov 2009 B2
7650112 Utsumi et al. Jan 2010 B2
7672310 Cooper et al. Mar 2010 B2
7684315 Beser Mar 2010 B1
7684341 Howald Mar 2010 B2
7693042 Wei Apr 2010 B1
7693090 Kimpe Apr 2010 B1
7701938 Bernstein et al. Apr 2010 B1
7716712 Booth et al. May 2010 B2
7739359 Millet et al. Jun 2010 B1
7742697 Cooper et al. Jun 2010 B2
7742771 Thibeault Jun 2010 B2
7760624 Goodson et al. Jul 2010 B1
7764231 Karr et al. Jul 2010 B1
7778314 Wajcer et al. Aug 2010 B2
7787557 Kim et al. Aug 2010 B2
7792183 Massey et al. Sep 2010 B2
7826569 Popper et al. Nov 2010 B2
7856049 Currivan et al. Dec 2010 B2
7876697 Thompson et al. Jan 2011 B2
7953144 Allen et al. May 2011 B2
7958534 Beser Jun 2011 B1
7970010 Denney et al. Jun 2011 B2
7983162 Ford et al. Jul 2011 B1
8000254 Thompson et al. Aug 2011 B2
8037541 Montague et al. Oct 2011 B2
8040915 Cummings Oct 2011 B2
8059546 Pai et al. Nov 2011 B2
8081674 Thompson et al. Dec 2011 B2
8116360 Thibeault Feb 2012 B2
8265559 Cooper et al. Sep 2012 B2
8279764 Cooper et al. Oct 2012 B2
8284828 Cooper et al. Oct 2012 B2
8345557 Thibeault et al. Jan 2013 B2
8526485 Thompson et al. Sep 2013 B2
8537972 Thompson et al. Sep 2013 B2
8594118 Cooper et al. Nov 2013 B2
20010055319 Quigley et al. Dec 2001 A1
20020038461 White et al. Mar 2002 A1
20020044531 Cooper et al. Apr 2002 A1
20020091970 Furudate et al. Jul 2002 A1
20020116493 Schenkel et al. Aug 2002 A1
20020119783 Bourlas et al. Aug 2002 A1
20020154620 Azenkot et al. Oct 2002 A1
20020168131 Walter et al. Nov 2002 A1
20020181395 Foster et al. Dec 2002 A1
20030028898 Howald Feb 2003 A1
20030043732 Walton et al. Mar 2003 A1
20030067883 Azenkot et al. Apr 2003 A1
20030067944 Sala et al. Apr 2003 A1
20030101463 Greene et al. May 2003 A1
20030108052 Inoue et al. Jun 2003 A1
20030120819 Abramson et al. Jun 2003 A1
20030138250 Glynn Jul 2003 A1
20030149991 Reidhead et al. Aug 2003 A1
20030158940 Leigh Aug 2003 A1
20030179768 Lusky et al. Sep 2003 A1
20030179770 Reznic et al. Sep 2003 A1
20030179821 Lusky et al. Sep 2003 A1
20030181185 Lusky et al. Sep 2003 A1
20030182664 Lusky et al. Sep 2003 A1
20030185176 Lusky et al. Oct 2003 A1
20030188254 Lusky et al. Oct 2003 A1
20030200317 Zeitak et al. Oct 2003 A1
20030212999 Cai Nov 2003 A1
20040015765 Cooper et al. Jan 2004 A1
20040042385 Kim et al. Mar 2004 A1
20040047284 Eidson Mar 2004 A1
20040052248 Frank et al. Mar 2004 A1
20040052356 McKinzie et al. Mar 2004 A1
20040062548 Obeda et al. Apr 2004 A1
20040073937 Williams Apr 2004 A1
20040096216 Ito May 2004 A1
20040109661 Bierman et al. Jun 2004 A1
20040139473 Greene Jul 2004 A1
20040163129 Chapman et al. Aug 2004 A1
20040181811 Rakib Sep 2004 A1
20040208513 Peddanarappagari et al. Oct 2004 A1
20040233234 Chaudhry et al. Nov 2004 A1
20040233926 Cummings Nov 2004 A1
20040248520 Miyoshi Dec 2004 A1
20040261119 Williams et al. Dec 2004 A1
20050010958 Rakib et al. Jan 2005 A1
20050025145 Rakib et al. Feb 2005 A1
20050034159 Ophir et al. Feb 2005 A1
20050039103 Azenko et al. Feb 2005 A1
20050058082 Moran et al. Mar 2005 A1
20050064890 Johan et al. Mar 2005 A1
20050097617 Currivan et al. May 2005 A1
20050099951 Mohan et al. May 2005 A1
20050108763 Baran et al. May 2005 A1
20050122996 Azenkot et al. Jun 2005 A1
20050163088 Yamano et al. Jul 2005 A1
20050175080 Bouillett Aug 2005 A1
20050183130 Sadja et al. Aug 2005 A1
20050198688 Fong Sep 2005 A1
20050226161 Jaworski Oct 2005 A1
20050281200 Terreault Dec 2005 A1
20060013147 Terpstra et al. Jan 2006 A1
20060088056 Quigley et al. Apr 2006 A1
20060121946 Walton et al. Jun 2006 A1
20060250967 Miller et al. Nov 2006 A1
20060262722 Chapman et al. Nov 2006 A1
20060291503 Chapman Dec 2006 A1
20070002752 Thibeault et al. Jan 2007 A1
20070030805 Pantelias et al. Feb 2007 A1
20070058542 Thibeault Mar 2007 A1
20070076592 Thibeault et al. Apr 2007 A1
20070076789 Thibeault Apr 2007 A1
20070076790 Thibeault et al. Apr 2007 A1
20070086328 Kao et al. Apr 2007 A1
20070094691 Gazdzinski Apr 2007 A1
20070097907 Cummings May 2007 A1
20070121712 Okamoto May 2007 A1
20070133672 Lee et al. Jun 2007 A1
20070143654 Joyce et al. Jun 2007 A1
20070147489 Sun et al. Jun 2007 A1
20070177526 Siripunkaw et al. Aug 2007 A1
20070184835 Bitran et al. Aug 2007 A1
20070189770 Sucharczuk et al. Aug 2007 A1
20070201547 Willcocks et al. Aug 2007 A1
20070206600 Klimker et al. Sep 2007 A1
20070206625 Maeda Sep 2007 A1
20070211618 Cooper et al. Sep 2007 A1
20070223512 Cooper et al. Sep 2007 A1
20070223513 Pantelias et al. Sep 2007 A1
20070223920 Moore et al. Sep 2007 A1
20070245177 Cooper et al. Oct 2007 A1
20080056713 Cooper et al. Mar 2008 A1
20080062888 Lusky et al. Mar 2008 A1
20080065960 Cheng et al. Mar 2008 A1
20080069006 Walter et al. Mar 2008 A1
20080075157 Allen et al. Mar 2008 A1
20080101210 Thompson et al. May 2008 A1
20080125984 Skendzic et al. May 2008 A1
20080140823 Thompson et al. Jun 2008 A1
20080193137 Thompson et al. Aug 2008 A1
20080200129 Cooper et al. Aug 2008 A1
20080242339 Anderson Oct 2008 A1
20080250508 Montague et al. Oct 2008 A1
20080274700 Li Nov 2008 A1
20080291840 Cooper et al. Nov 2008 A1
20090031384 Brooks et al. Jan 2009 A1
20090103557 Hong et al. Apr 2009 A1
20090103669 Kolze et al. Apr 2009 A1
20090109877 Murray et al. Apr 2009 A1
20090158096 Ali et al. Jun 2009 A1
20090249421 Liu et al. Oct 2009 A1
20090252234 Samdani et al. Oct 2009 A1
20100083356 Steckley et al. Apr 2010 A1
20100095360 Pavlovski et al. Apr 2010 A1
20100128739 Jung et al. May 2010 A1
20100154016 Li et al. Jun 2010 A1
20100154017 An et al. Jun 2010 A1
20100157824 Thompson et al. Jun 2010 A1
20100158093 Thompson et al. Jun 2010 A1
20100185391 Lee et al. Jul 2010 A1
20100223650 Millet et al. Sep 2010 A1
20100251320 Shafer et al. Sep 2010 A1
20100322390 Bialk et al. Dec 2010 A1
20110026577 Primo et al. Feb 2011 A1
20110030019 Ulm et al. Feb 2011 A1
20110069745 Thompson et al. Mar 2011 A1
20110072127 Gerber et al. Mar 2011 A1
20110099570 Sadja et al. Apr 2011 A1
20110110415 Cooper et al. May 2011 A1
20110150058 Oh Jun 2011 A1
20110153683 Hoskinson Jun 2011 A1
20110194418 Wolcott et al. Aug 2011 A1
20110194597 Wolcott et al. Aug 2011 A1
20110197071 Wolcott et al. Aug 2011 A1
20110243214 Wolcott et al. Oct 2011 A1
20120027069 Clausen et al. Feb 2012 A1
20120054312 Salinger Mar 2012 A1
20120084416 Thibeault et al. Apr 2012 A1
20120093240 McFarland et al. Apr 2012 A1
20120115505 Miyake et al. May 2012 A1
20120147751 Ulm Jun 2012 A1
20120190380 Dupray et al. Jul 2012 A1
20130003565 Gotwals et al. Jan 2013 A1
20130041990 Thibeault et al. Feb 2013 A1
20130051442 Cooper et al. Feb 2013 A1
20130070772 Watson et al. Mar 2013 A1
20130128723 Thibeault et al. May 2013 A1
20130148707 Thibeault et al. Jun 2013 A1
20130286852 Bowler et al. Oct 2013 A1
20130290783 Bowler et al. Oct 2013 A1
20130290791 Basile et al. Oct 2013 A1
20130291034 Basile et al. Oct 2013 A1
20130294489 Thibeault et al. Nov 2013 A1
20140029654 Thompson et al. Jan 2014 A1
20140029655 Thompson et al. Jan 2014 A1
20140133533 Thibeault et al. May 2014 A1
20140185428 Thibeault et al. Jul 2014 A1
20140267788 Bowler et al. Sep 2014 A1
20140269416 Bowler et al. Sep 2014 A1
20140269869 Bowler et al. Sep 2014 A1
20140270095 Bowler et al. Sep 2014 A1
20140278273 Bowler et al. Sep 2014 A1
Foreign Referenced Citations (22)
Number Date Country
69631420 Dec 2004 DE
0905998 Mar 1999 EP
1235402 Aug 2002 EP
1341335 Sep 2003 EP
1956782 Aug 2008 EP
55132161 Oct 1980 JP
04208707 Jul 1992 JP
6120896 Apr 1994 JP
6177840 Jun 1994 JP
09008738 Jan 1997 JP
9162816 Jun 1997 JP
10247893 Sep 1998 JP
11230857 Aug 1999 JP
2001044956 Feb 2001 JP
2003530761 Oct 2003 JP
2004172783 Jun 2004 JP
2004343678 Dec 2004 JP
0192901 Jun 2001 WO
0233974 Apr 2002 WO
2004062124 Jul 2004 WO
2007046876 Apr 2007 WO
2009146426 Dec 2009 WO
Non-Patent Literature Citations (40)
Entry
Office Action, Japanese App. No. 2008-557449 (Foreign Text and English Translation), Oct. 12, 2010.
Cable Television Laboratories, Inc., “A Simple Algorithm for Fault Localization Using Naming Convention and Micro-reflection Signature,” Invention Disclosure 60193, 2 pages, Jun. 2008.
Cable Television Laboratories, Inc., “Data-Over-Cable Service Interface Specifications DOCSIS 3.0: MAC and Upper Layer Protocols Interface,” CM-SP-MULPIv3.0-I16-110623, section 8, pp. 242-266, Jun. 2011.
Cable Television Laboratories, Inc., “Data-Over-Cable Service Interface Specifications DOCSIS® 3.0—MAC and Upper Layer Protocols Interface Specification,” CM-SP-MULPIv3.0-I17-111117, Nov. 2011.
Cable Television Laboratories, Inc., “DOCSIS Best Practices and Guidelines: Proactive Network Maintenance Using Pre-Equalization,” CM-GL-PNMP-V01-100415, Apr. 2010.
Cable Television Laboratories, Inc., “Pre-Equalization Based Pro-active Network Maintenance Process Model for CMs Transmitting on Multiple Upstream Channels,” Invention Disclosure 60203, 2 pages, May 2009.
Cable Television Laboratories, Inc., “Pre-Equalization based pro-active network maintenance process model”, Invention Disclosure 60177, 2 pages, Jun. 2008.
Cable Television Laboratories, Inc., “DOCSIS® Best Practices and Guidelines: Proactive Network Maintenance Using Pre-equalization,” CM-GL-PNMP-V02-110623, Jun. 2011.
Cable Television Laboratories, Inc., “Data-Over-Cable Service Interface Specifications: DOCSIS 2.0 Radio Frequency Interface Specification,” CM-SP-RFIv2.0-I06-040804, Apr. 2004.
L.A. Campos, et al., “Pre-equalization based Pro-active Network Maintenance Methodology”, Cable Television Laboratories, Inc., presentation, 32 pages, 2008.
R.L. Howald, et al., “Customized Broadband—Analysis Techniques for Blended Multiplexes,” NCTA Technical Papers, 2002.
R. Howald, “Access Networks Solutions: Introduction to S-CDMA,” Presentation to Society of Cable Telecommunications Engineers (SCTE) South Florida Chapter, 2009.
R. Howald, “Upstream Snapshots & Indicators (2009),” Regional Samples, Presentation to Society of Cable Telecommunications Engineers (SCTE) South Florida Chapter, Jan. 2010.
R.L. Howald et al., “Characterizing and Aligning the HFC Return Path for Successful DOCSIS 3.0 Rollouts”, SCTE Cable-Tec Expo, Oct. 2009.
R. Howald, et al., “DOCSIS 3.0 Upstream: Readiness & Qualification,” SCTE Cable-Tec Expo, Oct. 2009.
R. Howald, et al., “The Grown-Up Potential of a Teenage PHY”, NCTA Convention and Exposition, May 2012.
R. Howald, “DOCSIS 3.0 Upstream: Technology, RF Variables & Case Studies,” Access Networks Solutions, 2009, presentation to Society of Cable Telecommunications Engineers (SCTE) South Florida Chapter, 23 pages, Jan. 2010.
R. Hranac, “Linear Distortions, Part 1,” Communication Technology, Jul. 2005.
X. Liu, et al., “Variable Bit Rate Video Services in DOCSIS 3.0 Networks,” NCTA Technical Papers, 2008.
Motorola, Inc., “White Paper: Expanding Bandwidth Using Advanced Spectrum Management,” Sep. 25, 2003.
H. Newton, Newton's Telecom Dictionary, Flatiron Publishing, 9th ed., pp. 216 and 1023 (definitions of “carrier to noise ratio” and “signal to noise ratio”), Sep. 1995.
M. Patrick, et al., “Delivering Economical IP Video over DOCSIS by Bypassing the M-CMTS with DIBA,” SCTE 2007 Emerging Technologies, NCTA Technical Papers, 2007.
A. Popper, et al., “An Advanced Receiver with Interference Cancellation for Broadband Cable Networks,” 2002 International Zurich Seminar on Broadband Communications—Access, Transmission, Networking, pp. 23-1-23-6, IEEE, 2002.
A. Popper, et al, “Ingress Noise Cancellation for the Upstream Channel in Broadband Cable Access Systems,” 2002 IEEE International Conference on Communications, vol. 3, pp. 1808-1812. IEEE, 2002.
S.U.H. Qureshi, “Adaptive Equalization,” Proceedings of the IEEE, vol. 73, No. 9, pp. 1349-1387, Sep. 1985.
S. Ramakrishnan, “Scaling the DOCSIS Network for IPTV,” SCTE Conference on Emerging Technologies, NCTA Cable Show, Apr. 2009.
Y.R. Shelke, “Knowledge Based Topology Discovery and Geo-localization”, Thesis, Master of Science, Ohio State University, 2010.
R. Thompson, et al., “256-QAM for Upstream HFC,” NCTA 2010 Spring Technical Forum Proceedings, pp. 142-152, May 2010.
R. Thompson, et al., “256-QAM for Upstream HFC Part Two”, SCTE Cable-Tec Expo 2011, Technical Paper, Nov. 2011.
R. Thompson, et al., “Multiple Access Made Easy,” SCTE Cable-Tec Expo 2011, Technical Paper, Nov. 2011.
R. Thompson, et al., “Optimizing Upstream Throughput Using Equalization Coefficient Analysis”, National Cable & Telecommunications Association (NCTA) Technical Papers, Apr. 2009.
R. Thompson, et al., “Practical Considerations for Migrating the Network Toward All-Digital”, Society of Cable Telecommunications Engineers (SCTE) Cable-Tec Expo, Oct. 2009.
R. Thompson, et al., “64-QAM, 6.4MHz Upstream Deployment Challenges,” SCTE Canadian Summit, Toronto, Canada, Technical Paper, Mar. 2011.
B. Volpe, et al., “Cable-Tec Expo 2011: Advanced Troubleshooting in a DOCSIS© 3.0 Plant,” Nov. 2011.
L. Wolcott, “Modem Signal Usage and Fault Isolation,” U.S. Appl. No. 61/301,835, filed Feb. 5, 2010.
F. Zhao, et al., “Techniques for minimizing error propagation in decision feedback detectors for recording channels,” IEEE Transactions on Magnetics, vol. 37, No. 1, pp. 592-602, Jan. 2001.
Y. Morishita, et al., “An LMS adaptive equalizer using threshold in impulse noise environments”, IEEE, ICT 2003 10th International Conference on Telecommunications, vol. 1, pp. 578-582, Feb. 2003.
Office Action, German App. No. 11 2007 000 663.3-35 (Foreign Text and English Translation), Aug. 30, 2011.
PCT International Search Report and Written Opinion for PCT/US07/62417—Dated Dec. 21, 2007.
European Search Report for EP 07017516, dated Feb. 20, 2008.
Related Publications (1)
Number Date Country
20070223920 A1 Sep 2007 US
Provisional Applications (1)
Number Date Country
60785648 Mar 2006 US