Claims
- 1. Apparatus for use in completing the erection of a structure partially-erected to a level, comprising:
- a temporary tower projecting upwardly alongside the partially-erected portion of the structure to a location above said level, said tower having an upper section above said level, a lower section below said level, and means releasably connecting said upper and lower sections to afford lateral disengagement of one from the other;
- a superstructure assembly transferable onto said partially-erected structure for use thereon, said superstructure assembly including:
- a jib crane, tower climbing means carried by said jib crane for engaging the tower to advance said crane vertically therealong, and traveling means supporting said crane for movement horizontally along a surface; said tower climbing means including upper tower locking means, lower tower locking means below said upper tower locking means, extensible linkage means projecting upwardly toward said superstructure assembly from said lower tower locking means; and means releasably securing said extensible linkage means to said superstructure assembly; and
- horizontally-disposed rail means supported by said lower section of said tower and by said partially-erected structure for providing a temporary bridge across said tower and said structure at said level and providing said support surface for said crane traveling means;
- whereby the upper section of the tower can be separated from the lower section thereof and moved laterally with the superstructure assembly on the rail means onto the partially-erected structure to enable the jib
- 2. A method of completing erection of a structure partially-erected to at least one level with apparatus including a plurality of tower sections; means releasably connecting said sections to afford lateral separation of one from the other; a superstructure assembly including a jib crane having tower climbing means and traveling means, bridging means eagageable by the traveling means of the jib crane, said climbing means including upper tower locking means, lower tower locking means, and extensible linkage means projecting upwardly from the lower tower locking means; and means releasably fastening said linkage means to said superstructure assembly; said method comprising the steps of:
- erecting alongside the partially-erected structure a temporary tower composed of said built-up sections with at least one of the sections projecting upwardly beyond the partially-erected level of the structure;
- sequentially actuating the upper tower locking means, the lower tower locking means and the extensible linkage means to raise the superstructure assembly upwardly on the tower above said level;
- fastening the bridging means to the tower below said one section and supporting the bridging means on the partially-erected structure at said level;
- actuating said extensible means to lower the superstructure assembly relative to the upper section of the tower and to dispose the jib crane traveling means on the bridging means;
- disconnecting said one section of the tower from the tower sections therebelow;
- disconnecting the fastening means; and
- advancing the jib crane by its traveling means across the bridging means onto the partially-erected structure while carrying the upper section of the tower therewith.
Priority Claims (1)
Number |
Date |
Country |
Kind |
47-120138 |
Nov 1972 |
JA |
|
Parent Case Info
This application is a continuation-in-part of copending application Ser. No. 417,912 filed on Nov. 21, 1973, now abandoned for Climbing Crane For Construction.
US Referenced Citations (1)
Number |
Name |
Date |
Kind |
3080981 |
Kuschel |
Mar 1963 |
|
Foreign Referenced Citations (3)
Number |
Date |
Country |
262,893 |
Jun 1968 |
OE |
1,076,799 |
Oct 1954 |
FR |
1,091,724 |
Oct 1960 |
DT |
Continuation in Parts (1)
|
Number |
Date |
Country |
Parent |
417912 |
Nov 1973 |
|