The disclosure generally relates to a method of constructing a building, and a vertical slip form construction system therefor.
Many methods of constructing multi-story buildings exist. Traditionally, multi-story buildings have been constructed from the ground up, in which construction of the building begins on a ground level by attaching higher elevation structural elements on top of previously assembled lower structural elements to construct the building in upward direction, i.e., from bottom up. This construction method requires that the structural elements be lifted by a crane and connected in situ at elevation.
Known methods for constructing high-rise buildings may be inefficient. Presently, structural framing elements may be assembled into a building frame one member at a time, well above ground level. Tower cranes may be used to facilitate construction, which may include executing thousands of individual lifts for each element of the structure, building enclosure, finishes, mechanical and electrical equipment and many other components of a finished building. Furthermore, concrete or another hardenable material is pumped to the final elevation of each floor. These operations may require specialized equipment and setup logistics, and may be time-consuming and costly when constructing tall buildings.
A multi-story building that includes a vertical support core and a plurality of floor plates is described, wherein fabrication of the building includes fabricating each of the floor plates at or near ground level, and lifting each of the floor plates to a final position on the vertical support core. A method for assembling one of the floor plates includes determining expected loads for the floor plate, and determining expected deflections for cantilevered portions of the floor plate based upon the expected loads. A floor plate frame is assembled near ground level, wherein the floor plate frame includes a plurality of framing members disposed on a plurality of girders. Cambers are imparted into each of the plurality of framing members based upon the expected deflections, and metal decking is installed onto the floor plate frame. A plurality of permanent support points for the floor plate are determined, wherein the floor plate is attachable to the vertical support core at the permanent support points. First pedestals are installed between ground level and the floor plate frame, wherein the plurality of first pedestals are disposed proximal to the permanent support points for the floor plate, and the first pedestals are controlled to lift the floor plate frame. Hardenable material is dispersed onto the metal decking of the floor plate frame while the floor plate frame is lifted at the permanent support points.
An aspect of the disclosure includes the plurality of permanent support points for the floor plate including elements disposed on the floor plate that are attachable to the vertical support core when the floor plate is lifted into a final location.
Another aspect of the disclosure includes installing, at key support points, a plurality of secondary pedestals between the ground level and the floor plate frame prior to the dispersing of the hardenable material onto the metal decking, and controlling vertical heights of the secondary pedestals based upon the imparted cambers of the plurality of the framing members of the floor plate frame.
Another aspect of the disclosure includes the secondary pedestals being attached to a base that is disposed on the ground level and attached to the floor plate frame at the key support points; and wherein the secondary pedestals are disposed to oppose upward and downward deflection of the floor plate frame at the key support points.
Another aspect of the disclosure includes the plurality of girders including first and second girders, wherein assembling the floor plate frame includes arranging the first and second girders in parallel on opposed sides of the vertical support core at ground level, and assembling each of a plurality of framing members to the first and second girders, wherein each of the framing members includes a medial beam attached to first and second cantilevered beams, wherein each of the framing members is arranged transverse to and supported by the first and second girders.
Another aspect of the disclosure includes the first and second girders each including a vertically-oriented web portion and a flange portion, wherein a plurality of apertures are disposed in the web portions of the first and second girders. Assembling each of the plurality of framing members to the first and second girders includes inserting a first end of the first cantilevered beam into one of the apertures of the first girder, inserting a first end of the second cantilevered beam into one of the apertures of the second girder, joining the first end of the first cantilevered beam to a first end of the medial beam at a first junction, securing the first junction of the medial beam and the first cantilevered beam at the first camber, joining the first end of the second cantilevered beam to a second end of the medial beam at a second junction, and securing the second junction of the medial beam and the second cantilevered beam at the second camber.
Another aspect of the disclosure includes determining expected deflections for the cantilevered portions of the floor plate based upon the expected loads, including determining an expected deflection for the first cantilevered beam and determining an expected deflection for the second cantilevered beam based upon the expected loads. This includes imparting vertical cambers into the plurality of framing members of the floor plate frame based upon the expected deflections, including setting a first camber between the medial beam and the first cantilevered beam based upon the expected deflection of the first cantilevered beam, and setting a second camber between the medial beam and the second cantilevered beam based upon the expected deflection of the second cantilevered beam.
Another aspect of the disclosure includes the first and second cambers being selected such that an upper planar surface of the floor plate forms a flat horizontal surface when the floor plate is fixedly attached to the vertical support core of the building.
Another aspect of the disclosure includes lifting the liftable floor plate upward on the vertical support core, and permanently affixing the liftable floor plate onto the vertical support core.
Another aspect of the disclosure includes installing the metal decking onto the floor plate frame onto a lower portion of the floor plate frame.
The above features and advantages and other features and advantages of the present teachings are readily apparent from the following detailed description of the best modes for carrying out the teachings when taken in connection with the accompanying drawings.
It should be understood that the appended drawings are not necessarily to scale, and present a somewhat simplified representation of various preferred features of the present disclosure as disclosed herein, including, for example, specific dimensions, orientations, locations, and shapes. Details associated with such features will be determined in part by the particular intended application and use environment.
The components of the disclosed embodiments, as described and illustrated herein, may be arranged and designed in a variety of different configurations. Thus, the following detailed description is not intended to limit the scope of the disclosure, as claimed, but is merely representative of possible embodiments thereof. In addition, while numerous specific details are set forth in the following description in order to provide a thorough understanding of the embodiments disclosed herein, some embodiments can be practiced without some of these details. Moreover, for the purpose of clarity, certain technical material that is understood in the related art has not been described in detail in order to avoid unnecessarily obscuring the disclosure. Furthermore, the drawings are in simplified form and are not to precise scale. For purposes of convenience and clarity only, directional terms such as top, bottom, left, right, up, over, above, below, beneath, rear, and front, may be used with respect to the drawings. These and similar directional terms are not to be construed to limit the scope of the disclosure. Furthermore, the disclosure, as illustrated and described herein, may be practiced in the absence of an element that is not specifically disclosed herein. Those having ordinary skill in the art will recognize that terms such as “above,” “below,” “upward,” “downward,” “top,” “bottom,” etc., are used descriptively for the figures, and do not represent limitations on the scope of the disclosure, as defined by the appended claims.
Referring to the Figures, wherein like numerals indicate like parts throughout the several views, a construction system is generally shown at 10 in
As used herein, the term “floor plate 20” includes all structural or frame members, e.g., joists and/or purlins, flooring, e.g., concrete floor, interior walls, exterior curtain walls, modular room subassemblies, e.g., a lavatory module, utilities, etc., that form a floor or level of the building 100. The term “floor plate 20” may include a plate for the roof structure of the building 100, as well as a plate for a floor or level of the building 100. Accordingly, it should be appreciated that the term “floor plate 20” is used herein to refer to both the roof structure for the roof of the building 100, as well as a floor structure for a floor or level of the building 100. As used herein and shown in the Figures, the reference numeral 20 may refer to and indicate any floor plate 20 of the building 100. The floor plate 20 specifically includes a floor plate frame 21, the fabrication of which is described herein.
The construction system 10 includes the vertical support core 12, which is an element of a vertical slip form system 13. The vertical slip form system 13 is operable to form the vertical support core 12 of the building 100 from a hardenable material 26 while moving vertically upward from the ground elevation 14 to a finished elevation. The hardenable material 26 may include, but is not limited to, a concrete mixture or other similar composition. The hardenable material 26 may include one or more additives to enhance one or more physical characteristics of the hardenable material 26, such as to reduce curing time, reduce slump, increase strength, etc. The specific type and contents of the hardenable material 26 may be dependent upon the specific application of the building 100, and may be dependent upon the specific geographic region in which the building 100 is being constructed. The specific type and contents of the hardenable material 26 are understood by those skilled in the art, are not pertinent to the teachings of this disclosure, and are therefore not described in greater detail herein.
The vertical support core 12 is designed to carry the vertical loads of the building 100. As such, the shape of the vertical support core 12 may be designed as necessary to provide the required compressive strength, shear strength, and bending strength for the particular application, size, and location of the building 100. It should be appreciated that the wall of the vertical support core 12 may be configured to include multiple load bearing columns connected by shear walls. In other embodiments, the wall of the vertical support core 12 may be designed to include a generally uniform construction around the entire perimeter of the vertical support core 12.
As shown in
The floor plates 20 make up discrete sections of the building 100. Each of the floor plates 20 is assembled a few feet above ground level and lifted to its design elevation employing one or more of the lifting devices 15 or other vertical conveyance structure(s), and permanently affixed to and supported by the vertical support core 12. The floor plates 20 are cantilevered from the lifting devices 15 and therefore, the weight of each of the floor plates 20 is best distributed symmetrically around the vertical support core 12 and the lifting devices 15. The floor plates 20 may be designed asymmetrically around the lifting devices 15 so long as proper design and loading techniques are utilized.
As described herein with reference to
A plurality of the continuous framing members 40 are disposed transverse to the first and second girders 30, 31. Each of the framing members 40 includes the medial beam 50 that is attached to the first and second cantilevered beams 60, 70, and is arranged transverse to and supported by the first and second girders 30, 31.
The medial beam 50 and the first and second cantilevered beams 60, 70 are each configured to have a flat beam section on a top portion of the respective beam along its longitudinal axis. The medial beam 50 may be configured as an I-beam, a C-beam, a T-beam, an L-beam, a square beam, a rectangular beam, etc., which defines a respective cross-sectional shape. The medial beam 50 includes first and second ends 52, 54, respectively, with a plurality of bolt through-holes 53 disposed thereat.
Each of the first and second cantilevered beams 60, 70 may be an I-beam, a C-beam, a T-beam, an L-beam, a square beam, a rectangular beam, etc., which defines a respective cross-sectional shape. The cross-sectional shape associated with the first cantilevered beam 60 corresponds to the respective aperture 36 in the first girder 30, and the cross-sectional shape associated with the second cantilevered beam 70 corresponds to the respective aperture 36 in the second girder 31. Each of the first cantilevered beams 60 includes first and second ends 62, 64, respectively, with a plurality of bolt through-holes 63 disposed thereat. Each of the second cantilevered beams 70 includes first and second ends 72, 74, respectively, with a plurality of bolt through-holes 73 disposed thereat. The medial beams 50 are horizontally disposed between the first and second girders 30, 31. The length of each of the medial beams 50 is selected to define inflection points, including a first inflection point 66 and a second inflection point 76.
The first end 62 of each of the first cantilevered beams 60 is threaded through one of the apertures 36 of the first girder 30 and is attached to the first end 52 of the respective medial beam 50 at a first junction 65, which defines a first inflection point 66 that has a first camber 67. The first end 62 the first cantilevered beam 60 is attached to the first end 52 of the respective medial beam 50 employing span plates 80 and friction bolts 82 via respective bolt through-holes 53 and bolt through-holes 63. The first cantilevered beam 60 is also attached to the first girder 30 mid-span employing angle plates 84 and friction bolts 82 via other bolt through-holes 86. The second ends 64 of the first cantilevered beams 60 are attached to a spandrel 90 in one embodiment.
The first end 72 of each of the second cantilevered beams 70 is threaded through one of the apertures 36 of the second girder 31 and is attached to the second end 54 of the respective medial beam 50 at a second junction 75, which defines a second inflection point 76 that has a second camber 77. The first end 72 of the second cantilevered beam 70 is attached to the second end 54 of the respective medial beam 50 employing span plates 80 and friction bolts 82 via respective bolt through-holes 53 and bolt through-holes 63. The second cantilevered beam 70 is also attached to the first girder 30 mid-span employing angle plates 84 and friction bolts 82 via other bolt through-holes. The second ends 74 of the second cantilevered beams 70 are attached to another spandrel 90.
The first and second cambers 67, 77 are selected such that an upper planar surface 22 of the floor plate 20 forms a flat horizontal surface when the floor plate 20 is fixedly attached to the vertical support core 12. The first inflection point 66 is defined for each of the continuous framing members 40 at the first junction 65 between the first end 62 of the first cantilevered beams 60 attached to the first end 51 of the medial beam 50, with the associated first camber 67. Likewise, the second inflection point 76 is defined at the second junction 75 between the first end 72 of the second cantilevered beam 70 attached to the second end 54 of the medial beam 50, with the associated second camber 77.
The bolt through-holes 53 of the medial beam 50, and/or the bolt through-holes 63 of the respective first ends 62, 72 of the first and second cantilevered beams 60, 70, respectively, may be slightly enlarged to allow play in the respective first and second junctions 65, 75. As such, the first and second junctions 65, 75 permit pivoting of the first and second cantilevered beams 60, 70 at the respective inflection points 66, 76, which can be employed to impart and adjust the first and second cambers 67, 77. This arrangement facilitates camber control and adjustment to achieve flatness of each of the floor plates 20 during construction. This arrangement permits adjustment of the final geometry of the floor plate 20 during fabrication to achieve a desired camber requirement prior to tightening of the friction bolts 82.
Prior to fabrication of one of the floor plates 20, each previously constructed, lifted and permanently supported one of the floor plates 20 is analyzed for deflection as part of the design process. Anticipated deflection values for each of the completed plates in its permanently supported configuration are plotted for key points on the structural frame. The purpose is to allow each roof and floor plate to achieve a flat, level geometry in its final connected condition.
Prior to tightening the friction bolts 82 at the first and second junctions 65, 75, elements of the floor plate frame 21 may be adjusted to achieve the designed deflection values at key points. Shims may be installed at fixed pedestals, or the required values may be input into a control system of a network of first, second and third pedestals 17, 18, and 19, respectively, to impart the desired camber. Once the desired camber values have been achieved, the friction bolts 82 can be tightened to secure the first and second junctions 65, 75. Alternatively, or in addition, the first and second junctions 65, 75 may be secured by welding the span plates 80 to the respective ones of the first and second cantilevered beams 60, 70 and the medial beam 50.
The floor plate frame 21 may be lifted by the first pedestals 17 at locations that are proximal to the permanent support points 23, and additional ones of the second and third pedestals 18, 19 may be installed as required to maintain the required geometry during placement and curing of the hardenable material 26. As each floor plate 20 is installed in its final connected condition, field measurements of flatness may be taken. Additional adjustments to camber may be made through the adjustment of the imparted camber junctions to improve flatness tolerances of each successively installed floor plate.
The first, second and third pedestals 17, 18, 19 may include two-way hydraulic cylinders that are connected to the assembly pad 16 and connected to the portion of the floor plate 20 being supported. The use of two-way hydraulic cylinders, or an equivalent device, permits control of the first, second and third pedestals 17, 18, 19 to induce tension force or compressive force on the affected portion of the floor plate frame 21. As such, each of the first, second and third pedestals 17, 18, 19 may push upward on the affected portion of the floor plate frame 21 or pull downward on the portion of the floor plate frame 21 to achieve a desired camber and flatness during fabrication. The first, second and third pedestals 17, 18, 19 may be computer-controlled hydraulic pedestals that provide the capability to make in-field height adjustments to adjust camber, which in turn facilitates the achievement a high degree of floor flatness. The hydraulic pedestals move, i.e., vertically adjust the floor plate frame 21 to the desired right camber position before the hardenable material 26 has cured, and holds the floor plate assembly 21 in position during curing in order to achieve desired flatness. This operation facilitates shaping the floor plate 20 while it is being fabricated and while the hardenable material is being poured by making in-process adjustments. Flatness can be monitored and adjusted while the hardenable material is being poured and during curing.
As each of the floor plates 20 is lifted and locked in to its permanently supported condition at its design elevation, the achieved flatness is measured and outcomes may be used to adjust the geometry of the next one of the floor plates 20 being fabricated. This process improves the flatness tolerance of each successive floor plate.
The building 100 employs cantilevered floor plates for roof and floor plate framing. The roof and floor plate assemblies have progressing conditions of loading and deflection throughout fabrication, lifting to final elevation, permanent connection to the vertical slip form system 13, application of service loads, and similar conditions encountered during construction and use. Consequently, the structural engineering process incorporates these multiple and varying conditions into the design of the structural system, along with consideration of appropriate tolerances for other elements, including but not limited to building envelope, interior partitions, mechanical and electrical systems, live loads, etc.
The camber of each of the floor plates 20 in its final connected condition is determined by engineering calculation, resulting in a final deflection value from true level at key points along the structural frame. The camber required for the floor plate 20 can then be set so that it will achieve a flat, level configuration in its final connected condition.
As each floor is installed in its final connected condition, field measurements of flatness are taken. Additional adjustments to camber may be made through the adjustment of the imparted camber connections to improve flatness tolerances of each successively installed floor plate.
The members of the floor plate frame 21 are set on hydraulic pedestals with pre-designed cambers. Once the hardenable material 26 has been placed on the metal decking 25 that is attached to the floor plate frame 21, the entire floor plate 20 becomes rigid. As it is placed, the weight of the hardenable material 26 is properly supported, and the methodology used and location points of supports during concreting operations may be helpful in achieving an acceptable outcome. The supported points are proximal to the final locked-in condition to avoid variations in floor flatness throughout the floor plate assembly once it is permanently supported. Hardenable material 26 is placed and cured while the floor plate frame 21 is supported only at its permanent support points by the lifting provided with the vertical conveyance structure 13. The floor plate 20 is expected to achieve its final geometry prior to being lifted to its final elevation. Before the weight of hardenable material 26 is added to the floor plate frame 21, additional second and third pedestals 18, 19 may be installed in key locations, with heights being computer-controlled. Movement is possible in both up and down direction. All of the first, second and third pedestals 17, 18, 19 can be adjusted simultaneously to move the entire floor plate 20 or adjusted individually control of camber. Hydraulic pedestals may be used to raise and lower the entire floor plate 20, within the pedestal's range of movement, while still maintaining a unique geometry without variation. This movement capability may facilitate worker access to various portions of the structural frame for fabrication, the on-loading of delivered materials and equipment to the roof or floor plate, and the off-loading of debris and waste materials from the roof or floor plate.
The detailed description and the drawings or figures are supportive and descriptive of the disclosure, but the scope of the disclosure is defined solely by the claims. While some of the best modes and other embodiments for carrying out the claimed teachings have been described in detail, various alternative designs and embodiments exist for practicing the disclosure defined in the appended claims.
Number | Name | Date | Kind |
---|---|---|---|
2732177 | Ludowici | Jan 1956 | A |
3070845 | Cheskin | Jan 1963 | A |
3283465 | Cheskin | Nov 1966 | A |
3721056 | Toan | Mar 1973 | A |
3971179 | Bodocsi | Jul 1976 | A |
3978630 | Labie et al. | Sep 1976 | A |
3981109 | Termohlen | Sep 1976 | A |
4071988 | Bowes | Feb 1978 | A |
4709456 | Iyer | Dec 1987 | A |
5074095 | Wilnau | Dec 1991 | A |
5469684 | Franklin | Nov 1995 | A |
7581709 | Gillespie | Sep 2009 | B2 |
7640702 | Termohlen | Jan 2010 | B2 |
7784231 | Termohlen | Aug 2010 | B2 |
8806820 | Ahn | Aug 2014 | B2 |
9752316 | Thornton | Sep 2017 | B2 |
20030089050 | Tipping | May 2003 | A1 |
20040037653 | Kelso | Feb 2004 | A1 |
20080276550 | Termohlen | Nov 2008 | A1 |
20090049762 | Termohlen | Feb 2009 | A1 |
Number | Date | Country |
---|---|---|
4048007 | Feb 2008 | JP |
Entry |
---|
International search report for international application No. PCT/US2020/027778 dated Jun. 25. |
Number | Date | Country | |
---|---|---|---|
20200340234 A1 | Oct 2020 | US |