Method and apparatus for facilitating management of information technology investment

Abstract
A method and apparatus to facilitate management of IT investment includes storing data associated with performance metrics of a number of information technology (IT) projects, and generating a number of “scorecards” for a number of IT portfolios, using the stored data, with each scorecard indicating status of the IT projects of an IT portfolio relative to performance metrics, each IT portfolio having a subset of the IT projects. The method/apparatus further includes generating a number of “dashboards” for the IT projects, using also the stored data, with each dashboard graphically illustrating one or more aspects of at least one IT project, and facilitating navigation from a scorecard to a corresponding one of the dashboards for a selected IT project by a user of the scorecard through selection of a representation of the IT project.
Description




BACKGROUND OF THE INVENTION




1. Field of the Invention




The present invention relates to the field of information management. More specifically, the present invention relates to management of Information Technology (IT) investments.




2. Background Information




Ever since the invention of computer, enterprises, business or otherwise, have used computers to improve the productivity of their workers and efficiency of their business operations. In the beginning, enterprises tended to focus in a handful of high priority operation areas, such as financial management, general ledger, payroll and so forth. While these projects were often important, and the investment were not insignificant, but relatively speaking, the investment often represented only a small portion of the enterprises' investment in infrastructure or research and development, and the overall success of the enterprises were not perceived to be critically dependent on these projects. Accordingly, except perhaps for periodic briefing for management of the organizational units that were directly impacted, senior management were seldom involved, and management of these projects were typically relegated to data processing professionals, and managed in an ad hoc manner.




Over time, continuing advances in computer and other related technology, such as networking and telecommunication, have made it economically as well as technically feasible to make available computing power to virtually every single worker of an enterprise, and support virtually every aspect of an enterprise's operations. As a result, the number as well as the type of applications have broaden, from individual worker productivity, such as word processing, email, and the like, to mission critical operations, such as reservation and flight scheduling in the case of the airline industry. The typical size and scope of many of these applications have also increased. In fact, not only the success of increasing number of conventional business enterprises are increasingly dependent on the success of their IT projects, we have new business enterprises, such as Internet access providers, Internet portals, e-Commerce companies, emerging that are made possible by information technology, which otherwise would not have existed.




With the increase in significance as well as in amount of investment, increasingly senior management of these enterprises are actively involved in the management of their enterprises' investment in IT. Unfortunately, while the significance and the investment in IT have skyrocketed in recent years, little advances have been made in the area of managing IT. Project managers, mid-level managers as well as senior executives continue to rely on a hodgepodge of non-integrated or poorly integrated individual software applications such as spreadsheet and project management applications.




Thus, increasingly there are interest and desire in having automated tools to assist management of all levels to manage these ever more critical IT projects.




SUMMARY OF THE INVENTION




A method and apparatus to facilitate management of IT investments includes, in one embodiment, storing data associated with performance metrics of a number of information technology (IT) projects, generating a number of scorecards for a number of IT portfolios, using the stored data, with each scorecard showing where IT projects of an IT portfolio stand on the performance metrics, and each IT portfolio having a subset of the IT projects. The method/apparatus further includes generating one or more investment maps of the IT portfolios, using also the stored data, with each investment map showing at least where a subset of the IT portfolios stand on a number of performance metrics. The method/apparatus further includes facilitating navigation from an investment map to a corresponding one of the scorecards for a selected IT portfolio by a user of the investment map through selection of a representation of the IT portfolio.




In another embodiment, the method/apparatus further includes generating a number of dashboards for the IT projects, using also the stored data, with each dashboard graphically illustrating one or more aspects of at least one IT project. The method/apparatus further includes facilitating navigation from a scorecard to a corresponding one of the dashboards for a selected IT project by a user of the scorecard through selection of a representation of the IT project.











BRIEF DESCRIPTION OF DRAWINGS




The present invention will be described by way of exemplary embodiments, but not limitations, illustrated in the accompanying drawings in which like references denote similar elements, and in which:





FIG. 1

illustrates an overview of the present invention, in accordance with one embodiment;





FIG. 2

illustrates an organization of project data of

FIG. 1

, in accordance with one embodiment;





FIGS. 3



a


-


3




c


illustrate the dashboard, the scorecard and the investment map of

FIG. 1

, in accordance with one embodiment each;





FIGS. 4



a


-


4




c


illustrate the relevant operational flows of the dashboard generator/viewer, the scorecard generator/viewer, and the investment map generator/viewer of

FIG. 1

, in accordance with one embodiment each;





FIGS. 5



a


-


5




c


illustrate additional relevant operational flows of the investment map generator/viewer and the scorecard generator/viewer of

FIG. 1

, in accordance with one embodiment each;





FIG. 6

illustrates a networking environment suitable for practicing the facilitation of IT management of the present invention, in accordance with one embodiment; and





FIG. 7

illustrates a computer system suitable for use as an IT executive, a portfolio manager or a project manager's computing device or a server of

FIG. 6

, in accordance with one embodiment.











DETAILED DESCRIPTION OF THE INVENTION




In the following description, various aspects of the present invention will be described. However, it will be apparent to those skilled in the art that the present invention may be practiced with only some or all aspects of the present invention. For purposes of explanation, specific numbers, materials and configurations are set forth in order to provide a thorough understanding of the present invention. However, it will also be apparent to one skilled in the art that the present invention may be practiced without the specific details. In other instances, well known features are omitted or simplified in order not to obscure the present invention.




Parts of the description will be presented in terms of operations performed by a computer system, using terms such as data, flags, bits, values, characters, strings, numbers and the like, consistent with the manner commonly employed by those skilled in the art to convey the substance of their work to others skilled in the art. As well understood by those skilled in the art, these quantities take the form of electrical, magnetic, or optical signals capable of being stored, transferred, combined, and otherwise manipulated through mechanical and electrical components of the computer system; and the term computer system include general purpose as well as special purpose data processing machines, systems, and the like, that are standalone, adjunct or embedded.




Various operations will be described as multiple discrete steps in turn, in a manner that is most helpful in understanding the present invention, however, the order of description should not be construed as to imply that these operations are necessarily order dependent. In particular, these operations need not be performed in the order of presentation.




Referring now

FIG. 1

, wherein a block diagram illustrating the integrated facilitation of IT management of the present invention, in accordance with one embodiment, is shown. As illustrated, in accordance with the present invention, data associated with IT projects


102


are collected and stored. More particularly, as will described in more detail below, project data


102


are associated with a number of performance metrics of IT projects. Also illustrated, in accordance with the present invention, “integrated” dashboard generator/viewer


112


, scorecard generator/viewer


114


and investment map generator/viewer


116


are provided to generate IT project dashboards


122


, IT portfolio scorecards


124


and IT investment mapsmap


126


respectively. IT project dashboards


122


are designed to assist IT project managers to manage their respective projects, whereas IT portfolio scorecards


124


are designed to assist “mid-level” IT portfolio mangers to manage their respective IT portfolios. IT investment maps


126


in turn are designed to assist an IT executive (or its business partners) to manage the entire IT investment of his/her enterprise. More particularly, project dashboards


122


, portfolio scoreboards


124


and investment maps


126


are logically integrated (as denoted by arrows


132


and


134


) to facilitate more in-depth understanding of issues surfaced by investment maps


126


and by scorecards


124


.





FIG. 2

illustrates an organization of project data


102


in accordance with one embodiment. As alluded to earlier, in accordance with the present invention, project data


102


are associated with performance metrics designed to show where IT projects stand. In one embodiment, the performance metrics are key performance categories (KPC). In one embodiment, these performance metrics (or KPC) include budget metrics, staffing metrics, project size and quality metrics, and progress metrics. In one embodiment, the budget metrics include expense to budget ratios for a number of expense categories, such as personnel expenses, overhead expenses and the like. In another embodiment, the staffing metrics include current staffing level to staffing requirement ratios for a number of staffing categories, such as senior analysts, software engineers with web design skills, software engineers with C++ programming skills, engineers with networking skills and the like. In yet another embodiment, project size and quality metrics include metrics measuring the quantity of code and documentation being developed, the amount of defects encountered or removed from these code and documentation. In yet another embodiment, the progress metrics includes metrics measuring a number of task completion to schedule milestone indicators for a number of project phases, e.g. feasibility phase, design phase, unit test phase, functional test phase and system test phase. In alternate embodiments, data may also be stored for other performance metrics (or KPC) in addition to or in lieu of some or all of the above enumerated example metrics/categories.




For the illustrated embodiment, project data


102


are stored in tables


202


of a relational database, with each table storing a subset of the data (in columns) for a subset of the projects (in rows). The data may be organized into the various tables in any one of a number of application dependent manner, taking into consideration the number projects, the number of performance metrics as well as other factors. In alternate embodiments, project data


102


may also be stored employing other data organization techniques, including but limited to flat files, hierarchical databases and the like. In one embodiment, historic data are also stored and maintained for some or all of the metrics for which data are being stored. In one embodiment, user annotations for all or selected ones of the metrics are also stored.




In one embodiment, the data to be stored, and whether historical and/or annotations are to be stored, are user defined. The user definition may be provided through any one of a number of “input dialogues” known in the art.





FIGS. 3



a


-


3




c


illustrate a dashboard, a scorecard, and an investment map of

FIG. 1

in further detail, in accordance with one embodiment each. As described earlier, dashboard


122


is designed to assist a project manager in managing a project. As shown in

FIG. 3



a


, for the illustrated embodiment, dashboard


122


includes a number of graphical depictions


302




a


-


302




d


for a number of aspects of a project (as indicated by one or more of the earlier described performance metrics). The graphical depictions


302




a


-


302




d


may include the illustrated non-linear graph


302




a


, histogram


302




b


, pie chart


302




c


, linear graphs


302




d


, as well as other depictions. The various graphical depictions


302




a


-


302




d


are “tiled” in the illustrated presentation. In other embodiments, the graphical depictions


302




a


-


302




d


are arranged in a cascaded overlapping manner instead. Further, a dashboard


122


may present graphical depictions for multiple projects instead.




In a preferred one of the embodiments, a project manager may select the subject matters (i.e. the projects and their performance metrics/categories) to be graphically depicted, the graphical depictions to be employed, as well as the manner in which the graphical depictions are to be presented. These selections may be specified by the project manager through any one of a number of “selection dialogues” known in the art.




As described earlier, scorecard


124


is designed to assist a portfolio manager in managing the portfolio of IT projects he/she is responsible for. As shown in

FIG. 3



b


, for the illustrated embodiment, each scorecard


124


is a tabular presentation of where the projects of a portfolio stand on various performance indicators, with measurements of the various performance indicators of the projects occupying columns


306


of corresponding rows


304


. Each performance indicator may correspond to a performance metric or may be an aggregate, weighted or otherwise, of a number of performance metrics (which may or may not be individually depicted in the subject scorecard). Additionally, in lieu of conventional numerical and/or textual presentation, the measurements may be advantageously depicted in symbols


308


(in color or otherwise) to enable the current standing of a performance indicator of a project to be easily highlighted for a portfolio manager. Furthermore, for selected ones of the performance indicators, corresponding cross project composite measures are automatically computed and presented in columns of a cross project row (the top row, for the illustrated embodiment). Likewise, the cross project composite measures may be “aggregated” in a weighted or non-weighted manner, as well as presented in symbolic fashion (color or otherwise). Similarly, the contributing projects for the computation of the cross project composite measures may or may not be part of the subject scorecard. Most importantly, the presented projects are logically linked to their dashboards


122


, to facilitate a portfolio manager to drill down or focus on a project if necessary.




In one embodiment, scorecards


124


may be used to present the status of portfolios of portfolios (as opposed to projects) instead. But, for ease of understanding, the remaining description will primarily focus on scorecards


124


being used to present the status of portfolios of projects.




Similar to dashboard


122


, in a preferred one of the embodiments, a portfolio manager may select the projects of a portfolio and the performance indicators of the projects to be included, the manner the performance indicators are to be “aggregated”, whether any cross project composite measures are to be computed, the manner in which the cross project composite measures are to be computed, as well as the manner in which the measurements are to be presented. These selections may too be specified by the portfolio manager through any one of a number of “selection dialogues” known in the art.




As also described earlier, investment maps


126


are designed to assist an IT executive in managing IT investments of his/her enterprise. As shown in

FIG. 3



c


, for the illustrated embodiment, an investment map


126


graphically depicts a selected subset of the IT portfolios in accordance with risk, technology type, their size and their soundness. Each IT portfolio is graphically represented by a “bubble”. In alternate embodiments, other graphical representations may be employed instead. The size and soundness of a portfolio are depicted by the size and color of the “bubble”. The risk and technology type of the portfolio determines the placement of the “bubble”, e.g. with risk determining the y-axis value and the technology type determining the x-axis value. In alternate embodiments, the technology type, risk, size and soundness may be conveyed through other visual attributes instead. Again, most importantly, the portfolios are logically linked to their scorecards


124


to facilitate an IT executive to drill down or focus on a portfolio if necessary.




In one embodiment, the technology type of each portfolio is characterized by the portfolio manager as being evolutionary in nature, or instrumental in establishing a new computing platform or technologically transforming in nature. In one embodiment, the characterization may be accomplished through quantified indices (which in turn are employed to generate the normalized x-coordinates). Similarly, the risk of each-portfolio is characterized by the portfolio manager as being high, medium or low. In one embodiment, the characterization may also be accomplished through quantified indices (which in turn are employed to generate the normalized y-coordinates). In like manner, a portfolio manager also specifies how the size of a portfolio is to be measured, e.g. in terms of total dollars budgeted, total staffing, total number of lines of code to be written and so forth, as well as how “soundness” of a portfolio is to be measured, e.g. by the number of critical performance indicators in an “alert” state, or by the number of projects having at least one critical performance indicators in the “alert” state, or both. These specifications may too be made by the portfolio managers through any one of a number of “selection dialogues” known in the art.




In alternate embodiments, investment maps


126


may depict the status of a selection of IT portoflios relative to other performance metrics/categories (as opposed to risk, technology type etc.). Again, the performance metrics/categories to be referenced in the depiction of the status of IT portfolios may be user specified, through any one of a number of known “specification dialogues” known in the art.





FIGS. 4



a


-


4




c


illustrate the relevant generation operational flows of the dashboard generator/viewer, the scorecard generator/viewer, and investment map generator/viewer of

FIG. 1

, in accordance with one embodiment each. As illustrated by

FIG. 4



a


, for dashboard generator/viewer


112


, upon start of the dashboard generation process for a project, at


402


, dashboard generator/viewer


122


selects one of the specified graphs for generation. At


404


, dashboard generator/viewer


122


generates the selected graph for the specified performance metrics. The manner of generation is graph dependent, i.e. whether it is a histogram or a pie chart and so forth, to be generated. The generation of these types of graphs are known in the art, accordingly will not be further described. At


406


, upon generation of the selected graph, dashboard generator/viewer


122


determines if additional graphs are to be generated. If so, dashboard generator/viewer


122


returns to


402


, otherwise, dashboard generator/viewer


122


continues at


408


, where it arranges the graphs for presentation. For the earlier described embodiment, dashboard generator/viewer


122


places and tiles the generated graphs.




As illustrated by

FIG. 4



b


, for scorecard generator/viewer


114


, upon start of the scorecard generation process for a portfolio, at


412


, scorecard generator/viewer


124


selects one of the project of the portfolio for generation. At


414


, scorecard generator/viewer


124


selects one of the specified performance indicators. At


416


, scorecard generator/viewer


124


determines the measurement value of the selected performance indicator for the selected project. The manner of determination is performance indicator dependent. For some performance indicators, the determination may simply involve determining whether a performance metric is higher or lower than a threshold value, for others, the determination may involve any one of a number of intermediate computations such as additions, subtractions, multiplications or divisions known in the art. At


418


, upon determining the measurement value of a performance indicator for a project, scorecard generator/viewer


124


determines if measurement values for additional performance indicators are to be determined. If so, scorecard generator/viewer


124


returns to


414


, otherwise, scorecard generator/viewer


124


continues at


420


. At


420


, scorecard generator/viewer


124


determines if the portfolio has additional projects to be processed. If so, scorecard generator/viewer


124


returns to


412


, otherwise, scorecard generator/viewer


124


continues at


422


. At


422


, scorecard generator/viewer


124


determines the cross project measure values for applicable ones of the performance indicators. Finally, at


424


, scorecard generator/viewer


124


displays the generated scorecard.




As illustrated by

FIG. 4



c


, for investment map generator/viewer


114


, upon start of the map generation process, at


432


, map generator/viewer


126


selects one of the portfolios for generation. At


434


, map generator/viewer


126


selects a project of the selected portfolio. At


436


, map generator/viewer


126


“aggregates” the performance metric values for the selected project. The manner of “aggregation” is performance metrics dependent. For some performance metrics, the “aggregation” may simply involve summation of performance metric values, for others, the “aggregation” may involve a number of intermediate transformation or normalization operations known in the art. At


438


, upon aggregating the performance metrics for a project, map generator/viewer


126


determines if the selected portfolio has more projects to be processed. If so, map generator/viewer


126


returns to


434


, otherwise, map generator/viewer


126


continues at


440


. At


440


, map generator/viewer


126


determines color of the bubble representation, to appropriately represent the soundness of the portfolio. Additionally, map generator/viewer


126


determines the size of the bubble representation, to appropriately represent the total investment of the portfolio, as well as the proper placement of the bubble representation, to appropriately depict the technology type and risk associated with the portfolio. At


442


, map generator/viewer


126


determines if additional portfolios are to be processed. If so, map generator/viewer


126


returns to


432


, otherwise map generator/viewer


126


continues at


444


, and displays the generated map.





FIGS. 5



a


-


5




c


illustrate the relevant viewing operational flows of the scorecard generator/viewer and investment map generator/viewer of

FIG. 1

, in accordance with one embodiment each. As illustrated by

FIG. 5



a


, for map generator/viewer


116


, upon being notified of the selection of a portfolio by a user (e.g. by way of clicking on the bubble representation using a cursor control device such as a mouse), map generator/viewer


116


determines the identity of the selected portfolio,


502


. Upon determining the identity of the selected portfolio, at


504


, map generator/viewer


116


invokes scorecard generator/viewer


114


to display the scorecard for the selected portfolio, thereby facilitating an IT executive in drilling down and focusing on a portfolio of interest.




As illustrated by

FIG. 5



b


, for scorecard generator/viewer


114


, upon being notified of the selection of a project by a user (e.g. by way of clicking on the row of a project using a cursor control device such as a mouse), scorecard generator/viewer


114


determines the identity of the selected project,


512


. Upon determining the identity of the selected project, at


514


, scorecard generator/viewer


114


invokes dashboard generator/viewer


112


to display the dashboard for the selected project, thereby facilitating an IT executive/a portfolio manager in drilling down and focusing on a project of interest.





FIG. 6

illustrates a network environment suitable for practicing the present invention, in accordance with one embodiment. As illustrated, network environment


600


includes data server


602


, IT executive computing device


604


, portfolio manager computing devices


606


, and project manager computing devices


608


. Server


602


and computing devices


604


-


608


are coupled to each other via networking fabric


610


. Further, server


602


and computing devices


604


-


608


are incorporated with the earlier described teachings of the present invention. More particularly, server


602


is employed to store project data


102


, and provided with dashboard, scorecard and investment map generator/viewer


112


-


116


to facilitate generation and viewing of the earlier described dashboards, scorecards and investment map for an enterprise, by IT executives, portfolio managers, and project managers as described earlier, using computing devices


604


-


608


.




Server


602


is intended to represent one or more servers coupled to each other through a local or a wide area network. In one embodiment, dashboard, scorecard and investment map generator/viewer


112


-


116


may execute exclusively on server


602


with the results transmitted to display on computing devices


604


-


608


through networking fabric


610


. In other embodiments, part or all of dashboard, scorecard and investment map generator/viewer


112


-


116


may be executed on computing devices


604


-


608


instead. Further, there may be more than one executive computing device


604


, as well as having computing devices that serve as a computing device with more than one role, e.g. for an IT executive as well as a portfolio manager or a project manager. Networking fabric


610


is intended to represent a wide range of interconnected private and public networks, each constituted with networking equipment such as gateways, switches, routers and the like, such as the Internet.





FIG. 7

illustrates a computer system suitable for use as either server


602


or computing devices


604


-


608


of

FIG. 6

in accordance with one embodiment. As shown, computer system


700


includes one or more processors


702


(typically depending on whether it is used as server


602


or one of computing devices


604


-


608


) and system memory


704


. Additionally, computer system


700


includes mass storage devices


706


(such as diskette, hard drive, CDROM and so forth), input/output devices


708


(such as keyboard, cursor control and so forth) and communication interfaces


710


(such as network interface cards, modems and so forth). The elements are coupled to each other via system bus


712


, which represents one or more buses. In the case of multiple buses, they are bridged by one or more bus bridges (not shown). Each of these elements perform its conventional functions known in the art. In particular, system memory


704


and mass storage


706


are employed to store a working copy and a permanent copy of the programming instructions implementing the teachings of the present invention. The permanent copy of the programming instructions may be loaded into mass storage


706


in the factory, or in the field, as described earlier, through a distribution medium (not shown) or through communication interface


710


(from a distribution server (not shown). The constitution of these elements


702


-


712


are known, and accordingly will not be further described.




Thus, a novel method and apparatus for facilitating management of IT investment has been described. While the present invention has been described in terms of the above illustrated embodiments, those skilled in the art will recognize that the invention is not limited to the embodiments described. The present invention can be practiced with modification and alteration within the spirit and scope of the appended claims. For example, in addition to the above described dashboard, scorecard and investment map, the present invention may also be practiced with a “management notebook” encapsulating the various project data for a project manager, and navigationally coupling e.g. the dashboards to these “management notebooks”. The description is thus to be regarded as illustrative instead of restrictive on the present invention.



Claims
  • 1. A method comprising:storing data associated with performance metrics of a plurality of information technology (IT) projects; generating a plurality of scorecards for a plurality of IT portfolios, using said stored data, wherein said generating of scorecards comprises generating a plurality of rows and columns for each of said scorecards, and populating measures of the performance metrics of each IT project in columns of a row, and wherein said generating of scorecards further comprises generating, for one or more of the scorecards, a cross-project composite measure for at least one of the performance metrics, and populating the generated cross-project composite measure in the corresponding column of a cross-project summary row, with each scorecard showing where IT projects of an IT portfolio stand on said performance metrics, each IT portfolio having a subset of said IT projects; generating one or more investment maps of said IT portfolios, using also said stored data, showing where said IT portfolios stand on a plurality of performance metrics; and facilitating navigation from a selected one of said one or more investment maps to a corresponding one of said scorecards for a selected IT portfolio by a user of the selected investment map through selection of a representation of the IT portfolio.
  • 2. The method of claim 1, wherein said populating of the generated cross-project composite measure comprises populating a selected one of a composite metric value and a graphical composite indicator of the performance metric in the corresponding column of a cross-project summary row.
  • 3. A method comprising:storing data associated with performance metrics of a plurality of information technology (IT) projects; generating a plurality of scorecards for a plurality of IT portfolios, using said stored data, with each scorecard showing where IT projects of an IT portfolio stand on said performance metrics, each IT portfolio having a subset of said IT projects; generating one or more investment maps of said IT portfolios, using also said stored data, wherein said generating of one or more investment maps comprises generating a plurality of graphical representations for the IT portfolios of each investment map, and placing the graphical representations in the investment map in accordance with their IT portfolios' technology type and risk, said investment maps showing where said IT portfolios stand on a plurality of performance metrics; and facilitating navigation from a selected one of said one or more investment maps to a corresponding one of said scorecards for a selected IT portfolio by a user of the selected investment map through selection of a representation of the IT portfolio.
  • 4. A method comprising:storing data associated with performance metrics of a plurality of information technology (IT) projects; generating a plurality of scorecards for a plurality of IT portfolios, using said stored data, with each scorecard showing where IT projects of an IT portfolio stand on said performance metrics, each IT portfolio having a subset of said IT projects; generating one or more investment maps of said IT portfolios, using also said stored data, wherein said generating of one or more investment maps comprises generating a plurality of graphical representations for the IT portfolios of each investment map with at least a selected one of the size of each of the graphical representations representing the investment size of the IT portfolio, and the color of each of the graphical representations representing the soundness of the IT portfolio, each investment map showing where said IT portfolios stand on a plurality of performance metrics; and facilitating navigation from a selected one of said one or more investment maps to a corresponding one of said scorecards for a selected IT portfolio by a user of the selected investment map through selection of a representation of the IT portfolio.
  • 5. A method comprising:storing data associated with performance metrics of a plurality of information technology (IT) projects; generating a plurality of scorecards for a plurality of IT portfolios, using said stored data, with each scorecard showing where IT projects of an IT portfolio stand on said performance metrics, each IT portfolio having a subset of said IT projects; generating one or more investment maps of said IT portfolios, using also said stored data, showing where said IT portfolios stand on a plurality of performance metrics; facilitating navigation from a selected one of said one or more investment maps to a corresponding one of said scorecards for a selected IT portfolio by a user of the selected investment map through selection of a representation of the IT portfolio; generating a plurality of dashboards for said IT projects, using also said stored data, with each dashboard graphically illustrating one or more aspects of at least one IT project; and facilitating navigation from a scorecard to a corresponding one of said dashboards for a selected IT project by a user of the scorecard through selection of a representation of said IT project.
  • 6. The method of claim 5, wherein each generation of a dashboard for an IT project comprises generating a plurality of graphs for a plurality of aspects of the IT project, and placing and tiling said graphs.
  • 7. A method comprising:storing data associated with performance metrics for a plurality of information technology (IT) projects; generating a plurality of dashboards for said IT projects, using said stored data, with each dashboard graphically illustrating one or more aspects of at least one IT project; generating a scorecard for an IT portfolio, using also said stored data, with the scorecard showing where IT projects of the IT portfolio stand on said performance metrics; and facilitating navigation from said scorecard to a corresponding one of said dashboards for a selected IT project by a user of the scorecard through selection of a representation of said IT project.
  • 8. The method of claim 7, wherein said storing comprises storing data associated with performance metrics that include selected ones of budget metrics, staffing metrics, project size and quality metrics, and progress metrics.
  • 9. The method of claim 7, wherein said generating of scorecards comprises generating a plurality of rows and columns for each of said scorecards, and populating measures of the performance metrics of each IT project in columns of a row.
  • 10. The method of claim 9, wherein said generating of scorecards further comprises generating, for one or more of the scorecards, a cross-project composite measure for at least one of the performance metrics, and populating the generated cross-project composite measure in the corresponding column of a cross-project summary row.
  • 11. A method comprising:storing data associated with performance metrics of a plurality of information technology (IT) projects; and generating a plurality of scorecards for a plurality of IT portfolios, using said stored data, with each scorecard showing where IT projects of an IT portfolio stand on said performance metrics, each IT portfolio having a subset of said IT projects, each scorecard having a plurality of rows and columns with measures of the performance metrics of a project populating corresponding columns of a row, and at least one column having a cross project composite measure of the performance metric populated in the column of a cross project summary row.
  • 12. The method of claim 11, wherein said measures and cross project measures of the performance metrics comprise selected ones of metric values and graphical indicators.
  • 13. A method comprising:storing data associated with performance metrics of a plurality of information technology (IT) projects; and generating an investment map of a plurality of IT portfolios, using said stored data, showing at least where said IT portfolios stand on technology type, risk, investment size and soundness, with placement of each graphical representation of an IT project denoting the technology type and risk of the IT portfolio, a first visual attribute of the graphical representation denoting an amount of investment in the IT portfolio, and a second visual attribute of the graphical representation denoting soundness of the IT portfolio.
  • 14. The method of claim 13, wherein said first and second visual attributes of the graphical representation comprise size and color of the graphical representation.
  • 15. An apparatus comprising:a storage medium having stored therein data associated with performance metrics of a plurality of information technology (IT) projects, first programming instructions to generate a plurality of scorecards for a plurality of IT portfolios, using said stored data, and generate a plurality of rows and columns for each of said scorecards, and populate measures of the performance metrics of each IT project in columns of a row, and generate, for one or more of the scorecards, a cross-project composite measure for at least one of the performance metrics, and populate the generated cross-project composite measure in the corresponding column of a cross-project summary row, with each scorecard showing where IT projects of an IT portfolio stand on said performance metrics, each IT portfolio having a subset of said IT projects, second programming instructions to generate one or more investment maps of said IT portfolios, using also said stored data, showing where said IT portfolios stand on a plurality of performance metrics, third programming instructions to facilitate navigation from a selected one of said investment maps to a corresponding one of said scorecards for a selected IT portfolio by a user of the investment map through selection of a representation of the IT portfolio; and at least one processor coupled to the storage medium to execute said first, second and third programming instructions.
  • 16. The apparatus of claim 15, wherein said first programming instructions populate a selected one of a composite metric value and a graphical composite indicator of the performance metric in the corresponding column of a cross-project summary row.
  • 17. An apparatus comprising:a storage medium having stored therein data associated with performance metrics of a plurality of information technology (IT) projects, first programming instructions to generate a plurality of scorecards for a plurality of IT portfolios, using said stored data, with each scorecard showing where IT projects of an IT portfolio stand on said performance metrics, each IT portfolio having a subset of said IT projects, second programming instructions to generate one or more investment maps of said IT portfolios, using also said stored data, and generate a plurality of graphical representations for the IT portfolios and placing the graphical representations in said investment map in accordance with their IT portfolios' technology type and risk, each investment map showing where said IT portfolios stand on a plurality of performance metrics, third programming instructions to facilitate navigation from a selected one of said investment maps to a corresponding one of said scorecards for a selected IT portfolio by a user of the investment map through selection of a representation of the IT portfolio; and at least one processor coupled to the storage medium to execute said first, second and third programming instructions.
  • 18. An apparatus comprising:a storage medium having stored therein data associated with performance metrics of a plurality of information technology (IT) projects, first programming instructions to generate a plurality of scorecards for a plurality of IT portfolios, using said stored data, with each scorecard showing where IT projects of an IT portfolio stand on said performance metrics, each IT portfolio having a subset of said IT projects, second programming instructions to generate one or more investment maps of said IT portfolios, using also said stored data, and generate a plurality of graphical representations for the IT portfolios with at least a selected one of the size of each of the graphical representations representing the investment size of the IT portfolio, and the color of each of the graphical representations representing the soundness of the IT portfolio, each investment map showing where said IT portfolios stand on a plurality of performance metrics, third programming instructions to facilitate navigation from a selected one of said investment maps to a corresponding one of said scorecards for a selected IT portfolio by a user of the investment map through selection of a representation of the IT portfolio; and at least one processor coupled to the storage medium to execute said first, second and third programming instructions.
  • 19. An apparatus comprising:a storage medium having stored therein data associated with performance metrics of a plurality of information technology (IT) projects, first programming instructions to generate a plurality of scorecards for a plurality of IT portfolios, using said stored data, with each scorecard showing where IT projects of an IT portfolio stand on said performance metrics, each IT portfolio having a subset of said IT projects, second programming instructions to generate one or more investment maps of said IT portfolios, using also said stored data, showing where said IT portfolios stand on a plurality of performance metrics, third programming instructions to facilitate navigation from a selected one of said investment maps to a corresponding one of said scorecards for a selected IT portfolio by a user of the investment map through selection of a representation of the IT portfolio; fourth programming instructions to generate a plurality of dashboards for said IT projects, using also said stored data, with each dashboard graphically illustrating one or more aspects of at least one IT project, and fifth programming instructions to facilitate navigation from a scorecard to a corresponding one of said dashboards for a selected IT project by a user of the scorecard through selection of a representation of said IT project; and at least one processor coupled to the storage medium to execute said first, second, third, fourth, and fifth programming instructions.
  • 20. The apparatus of claim 19, wherein said fourth programming instructions generate a plurality of graphs for a plurality of aspects of the IT project, and place and tile said graphs.
  • 21. An apparatus comprising:one or more storage medium having stored therein data associated with performance metrics for a plurality of information technology (IT) projects, first programming instructions to generate a plurality of dashboards for said IT projects, using said stored data, with each dashboard graphically illustrating one or more aspects of at least one IT project, second programming instructions to generate a scorecard for an IT portfolio, using also said stored data, with the scorecard showing where IT projects of the IT portfolio stand on said performance metrics, and third programming instructions to facilitate navigation from said scorecard to a corresponding one of said dashboards for a selected IT project by a user of the scorecard through selection of a representation of said IT project; and at least one processor coupled to the one or more storage medium to execute the first, second and third programming instructions.
  • 22. The apparatus of claim 21, wherein said data associated with performance metrics include selected ones of budget metrics, staffing metrics, project size and quality metrics, and progress metrics.
  • 23. The apparatus of claim 21, wherein said second programming instructions generate a plurality of rows and columns for each of said scorecards, and populate measures of the performance metrics of each IT project in columns of a row.
  • 24. The apparatus of claim 23, wherein said second programming instructions generate, for one or more of the scorecards, a cross-project composite measure for at least one of the performance metrics, and populate the generated cross-project composite measure in the corresponding column of a cross-project summary row.
  • 25. An apparatus comprising:one or more storage medium having stored therein data associated with performance metrics of a plurality of information technology (IT) projects, and programming instructions to generate a plurality of scorecards for a plurality of IT portfolios, using said stored data, with each scorecard showing where IT projects of an IT portfolio stand on said performance metrics, each IT portfolio having a subset of said IT projects, each scorecard having a plurality of rows and columns with measures of the performance metrics of a project populating corresponding columns of a row, and at least one column having a cross project composite measure of the performance metric populated in the column of a cross project summary row; and at least one processor coupled to the at least one storage medium to execute the programming instructions.
  • 26. The apparatus of claim 25, wherein said measures and cross project measures of the performance metrics comprise selected ones of metric values and graphical indicators.
  • 27. An apparatus comprising:one or more storage medium having stored therein data associated with performance metrics of a plurality of information technology (IT) projects, and programming instructions to generate an investment map of a plurality of IT portfolios, using said stored data, showing at least where said IT portfolios stand on technology type, risk, investment size and soundness, with placement of each graphical representation of an IT project denoting the technology type and risk of the IT portfolio, a first visual attribute of the graphical representation denoting an amount of investment in the IT portfolio, and a second visual attribute of the graphical representation denoting soundness of the IT portfolio; and at least one processor coupled to the at least one storage medium to execute said programming instructions.
  • 28. The apparatus of claim 27, wherein said first and second visual attributes of the graphical representation comprise size and color of the graphical representation.
US Referenced Citations (4)
Number Name Date Kind
5381332 Wood Jan 1995 A
5446895 White et al. Aug 1995 A
5907490 Oliver May 1999 A
5960196 Carrier et al. Sep 1999 A
Foreign Referenced Citations (2)
Number Date Country
9420918 Sep 1994 WO
9707472 Feb 1997 WO
Non-Patent Literature Citations (6)
Entry
Cooper et al.; Best practices for managing R&D portfolios Research Technology Management; Washington; Jul./Aug. 1998.*
Karie A Willyerd; Balancing your evaluation act, Training; Minneapolis; Mar. 1997.*
Asbrand; IT metrics for success, Information Week; Manhasset; Aug. 17, 1998.*
Anonymous; Metrics make you fast, Machine Design; Cleveland; Sep. 28, 1995.*
Dobson, Chapter 7-How to Manage Multiple Projects in an Independent Portfolio, Chapter, The Juggler's Guide to managing Multiple projects, 1999.*
Hartman, Chapter 14—Project Control and Metrics, 2000, Project management Institute, Inc.