Embodiments of the present invention generally relate to the field of subsea production operations. Embodiments of the present invention further pertain to methods for managing hydrate formation in subsea equipment such as a production line.
More than two-thirds of the Earth's surface is covered by oceans. As the petroleum industry continues its search for hydrocarbons, it is finding that more and more of the untapped hydrocarbon reservoirs are located beneath the oceans. Such reservoirs are referred to as “offshore” reservoirs.
A typical system used to produce hydrocarbons from offshore reservoirs includes hydrocarbon-producing wells located on the ocean floor. The producing wells are sometimes referred to as “producers” or “subsea production wells.” The produced hydrocarbons are transported from the producing wells to a host production facility which is located on the surface of the ocean or immediately on-shore.
The producing wells are in fluid communication with the host production facility via a system of pipes that transport the hydrocarbons from the subsea wells on the ocean floor to the host production facility. This system of pipes typically comprises a collection of jumpers, flowlines and risers. Jumpers are typically referred to in the industry as the portion of pipes that lie on the floor of the body of water. They connect the individual wellheads to a central manifold, or directly to a production flowline. The flowline also lies on the marine floor, and transports production fluids from the manifold to a riser. The riser refers to the portion of a production line that extends from the seabed, through the water column, and to the host production facility. In many instances, the top of the riser is supported by a floating buoy, which then connects to a flexible hose for delivering production fluids from the riser to the production facility.
The drilling and maintenance of remote offshore wells is expensive. In an effort to reduce drilling and maintenance expenses, remote offshore wells are oftentimes drilled in clusters. A grouping of wells in a clustered subsea arrangement is sometimes referred to as a “subsea well-site.” A subsea well-site typically includes producing wells completed for production at one and oftentimes more “pay zones.” In addition, a well-site will oftentimes include one or more injection wells to aid in maintaining in-situ pressure for water drive and gas expansion drive reservoirs.
The grouping of remote subsea wells facilitates the gathering of production fluids into a local production manifold. Fluids from the clustered wells are delivered to the manifold through the jumpers. From the manifold, production fluids may be delivered together to the host production facility through the flowline and the riser. For well-sites that are in deeper waters, the gathering facility is typically a floating production storage and offloading vessel, or “FPSO.” The FPSO serves as a gathering and processing facility.
One challenge facing offshore production operations is flow assurance. During production, the produced fluids will typically comprise a mixture of crude oil, water, light hydrocarbon gases (such as methane), and other gases such as hydrogen sulfide and carbon dioxide. In some instances, solid materials such as sand may be mixed with the fluids. The solid materials entrained in the produced fluids may typically be deposited during “shut-ins,” i.e. production stoppages, and require removal.
Of equal concern, changes in temperature, pressure and/or chemical composition along the pipes may cause the deposition of other materials such as methane hydrates, waxes or scales on the internal surface of the flowlines and risers. These deposits need to be periodically removed, as build-up of these materials can reduce line size and constrict flow.
Hydrates are crystals formed by water in contact with natural gases and associated liquids, in a ratio of 85 mole % water to 15% hydrocarbons. Hydrates can form when hydrocarbons and water are present at the right temperature and pressure, such as in wells, flow lines, or valves. The hydrocarbons become encaged in ice-like solids which can rapidly grow and agglomerate to sizes which can block flow lines. Hydrate formation most typically occurs in subsea production lines which are at relatively low temperatures and elevated pressures.
The low temperatures and high pressures of a deepwater environment cause hydrate formation as a function of gas-to-water composition. In a subsea pipeline, hydrate masses usually form at the hydrocarbon-water interface, and may accumulate as flow pushes them downstream. The resulting porous hydrate plugs have the unusual ability to transmit some degree of gas pressure, while acting as a flow hindrance to liquid. Both gas and liquid may sometimes be transmitted through the plug; however, lower viscosity and surface tension favors the flow of gas.
It is desirable to maintain flow assurance between cleanings by minimizing hydrate formation. One offshore method used for hydrate plug removal is the depressurization of the pipeline system. Traditionally, depressurization is most effective in the presence of lower water cuts. However, the depressurization process sometimes prevents normal production for several weeks. At higher water cuts, gas lift procedures may be required. Further, hydrates may quickly re-form when the well is placed back on line.
Most known deepwater subsea pipeline arrangements rely on two production lines for hydrate management. In the event of an unplanned shutdown, production fluids in the flowline and riser are commonly displaced with dehydrated dead crude oil using a pig. Displacement is completed before the production fluids (which are typically untreated or “uninhibited”) cool down below the hydrate formation temperature. This prevents the creation of a hydrate blockage in the production lines. The pig is launched into one production line, is driven with the dehydrated dead crude out to the production manifold, and is driven back to the host facility through the second production line.
The two-production-line operation is feasible for large installations. However, for relatively small developments the cost of a second production line can be prohibitive. Therefore, an improved process of hydrate management is needed which does not, in certain embodiments, employ or rely upon two production lines. Further, a need exists for a hydrate management method that utilizes a water injection line and a single production line.
Further relevant information may be found in U.S. application Ser. No. 11/660,777, filed Feb. 21, 2007, and U.S. Provisional Patent Application No. 60/995,134 filed Sep. 25, 2007.
A method of managing hydrates in a subsea production system is provided. The subsea production system operates with a host production facility, a production cluster comprising one or more producers, a water injection cluster comprising one or more water injectors, a water injection line, and a single production line. The single production line directs fluids from the one or more producers to the host production facility. In one aspect, the method includes storing a pig in the subsea production system, shutting in production from the one or more producers, and injecting a hydrate inhibitor into the subsea production system. Hydrate inhibitor is injected in order to move the pig to the subsea production cluster, thereby at least partially displacing production fluids from the production cluster.
The method also includes injecting a displacement fluid into the subsea production system. The displacement fluid is injected in order to displace the hydrate inhibitor and any remaining production fluids into the single production line. This serves to further move the pig through the production line.
The method may also include further injecting displacement fluid into the subsea production system in order to displace the hydrate inhibitor and pig through the single production line and to the host production facility. Preferably, the displacement fluid is a dead displacement fluid such as crude oil, diesel, or a combination thereof. Alternatively, the displacement fluid may be additional hydrate inhibitor.
The subsea production system may include additional components. For example, the subsea production system preferably also comprises a control umbilical having a hydrate inhibitor line and a displacement fluid service line. In this arrangement, displacement fluid may be injected from the displacement fluid service line into the subsea production system.
The production cluster may include not only the one or more producers, but also a production manifold. Further, the production cluster may include jumpers for providing fluid communication between the production manifold and the one or more producers. The single production line preferably comprises a subsea production flowline and a production riser in fluid communication with the host production facility.
The subsea production system also preferably includes a water injection cluster. The water injection cluster comprises one or more water injectors, and a water injection manifold. In this arrangement, the water injection line may comprise a water injection riser and a subsea flowline for receiving injection water from the host production facility.
The subsea production system may also have a crossover manifold. A central pipeline may be placed in the crossover manifold to provide fluid communication between the water injection cluster and the production cluster.
In one aspect of the method, injecting a hydrate inhibitor into the subsea production system further comprises pumping the hydrate inhibitor from the hydrate inhibitor line into the production manifold and the jumpers. This serves to provide light touch operations before moving the pig through the production cluster.
In another aspect of the method, storing a pig in the subsea production system comprises injecting the pig into the water injection line, and then advancing the pig into a subsea storage location in the subsea production system using injection water. Alternatively, storing a pig in the subsea production system comprises placing the pig into the water injection cluster using a subsea pig launcher. In either instance, the method may further include storing the pig in the subsea storage location for a period of time, and launching the pig from the subsea storage location. Launching the pig may comprise advancing the pig from the subsea storage location, through the central pipeline, and to the production manifold.
After the pig has been launched from the subsea storage location, a new pig may be placed in the subsea storage location. Thus, in one aspect, the method further comprises launching a new pig from the host production facility. From there, the pig is moved through the water injection riser, through the water injection flowline, and to the subsea storage location. The pig is stored in the subsea storage location until a later time. The producers may be put back into production either before, during, or after the new pig is moved to the subsea storage location. Upon production, hydrocarbon fluids are produced from the one or more producers, through the production manifold, through the production flowline, through the production riser, and to the host production facility.
During a production line displacement procedure, it is optional to continue to inject water through the one or more injectors. In one aspect, water continues to be injected through the one or more injectors even while the pig is being moved to the subsea production cluster.
In one embodiment, the subsea production system further comprises a stand-alone manifold located near an outer end of the production flowline. This is in lieu of placing a crossover manifold between the injection manifold and the production manifold. The water injection line and the stand-alone manifold are interconnected by an extension of the water injection flowline and a smaller-bore water return line.
So that the manner in which the features of the present invention can be better understood, certain flow charts, drawings, and graphs are appended hereto. It is to be noted, however, that the drawings illustrate only selected embodiments of the inventions and are therefore not to be considered limiting of scope, for the inventions may admit to other equally effective embodiments and applications.
As used herein, the term “displacement fluid” refers to a fluid used to displace another fluid. Preferably, the displacement fluid has no hydrocarbon gases. Non-limiting examples include dead crude and diesel.
The term “umbilical” refers to any line that contains a collection of smaller lines, including at least one service line for delivering a working fluid. The “umbilical” may also be referred to as an umbilical line or a control umbilical. The working fluid may be a chemical treatment such as a hydrate inhibitor or a displacement fluid. The umbilical will typically include additional lines, such as hydraulic power lines and electrical power cables.
The term “service line” refers to any tubing within an umbilical. The service line is sometimes referred to as an umbilical service line, or USL. One example of a service line is an injection tubing used to inject a chemical.
The term “low dosage hydrate inhibitor,” or “LDHI,” refers to both anti-agglomerates and kinetic hydrate inhibitors. It is intended to encompass any non-thermodynamic hydrate inhibitor.
The term “production facility” means any facility for receiving produced hydrocarbons. The production facility may be a ship-shaped vessel located over a subsea well site, an FPSO vessel (floating production, storage and offloading vessel) located over or near a subsea well site, a near-shore separation facility, or an onshore separation facility. Synonymous terms include “host production facility” or “gathering facility.” In some embodiments, the term “production facility” may refer to more than one facility including at least one for injecting water and another for receiving production fluids.
The terms “tieback,” “tieback line,” and “riser” and “production line” are used interchangeably herein, and are intended to be synonymous. These terms mean any tubular structure or collection of lines for transporting produced hydrocarbons to a production facility. A production line may include, for example, a production flowline, a riser, spools, and topside hoses.
The term “production line” means a riser and any other pipeline used to transport production fluids to a production facility. The production line may include, for example, a subsea production line and a flexible jumper.
“Subsea production system” means an assembly of production equipment placed in a marine body. The marine body may be an ocean environment, or it may be, for example, a fresh water lake. Similarly, “subsea” includes both an ocean body and a deepwater lake.
“Subsea equipment” means any item of equipment placed proximate the bottom of a marine body as part of a subsea production system. Such equipment may include production equipment and water injection equipment.
“Subsea well” means a well that has a tree proximate the marine body bottom, such as an ocean bottom. “Subsea tree,” in turn, means any collection of valves disposed over a wellhead in a water body.
“Manifold” means any item of subsea equipment that gathers produced fluids from one or more subsea trees, and delivers those fluids to a production line, either directly or through a jumper line.
“Inhibited” means that produced fluids have been mixed with or otherwise been exposed to a chemical inhibitor for inhibiting formation of gas hydrates including natural gas hydrates. Conversely, “uninhibited” means that produced fluids have not been mixed with or otherwise been exposed to a chemical inhibitor for inhibiting formation of gas hydrates.
The production system 10 includes one or more subsea wells. In this arrangement, three wells 12, 14 and 16 are shown. The wells 12, 14, 16 may include at least one injection well and at least one production well. In the illustrative system 10, wells 12, 14, 16 are all producers, thereby forming a production cluster.
Each of the wells 12, 14, 16 has a subsea tree 15 on a marine floor 85. The trees 15 deliver production fluids to jumpers 22, or short flowlines. The jumpers 22, in turn, deliver production fluids from the production wells 12, 14, 16 to a manifold 20. The manifold 20 is an item of subsea equipment comprised of valves and piping in order to collect and distribute fluid. Fluids produced from the production wells 12, 14, 16 are usually commingled at the manifold 20, and exported from the well-site through a subsea production jumper 24 and the riser and flowline 38.
The production riser 38 ties back to a production facility 70. The production facility, also referred to as a “host facility” or a “gathering facility,” is any facility where production fluids are collected. The production facility may, for example, be a ship-shaped vessel capable of self-propulsion in the ocean. The production facility may alternatively be fixed to land and reside near shore or immediately on-shore. However, in the illustrative system 10, the production facility 70 is a floating production, storage and offloading vessel (FPSO) moored in the ocean. The FPSO 70 is shown positioned in a marine body 80, such as an ocean, having a surface 82 and a marine floor 85. In one aspect, the FPSO 70 is 3 to 15 kilometers from the manifold 20.
In the arrangement of
The subsea production system 10 also includes a utility umbilical 42. The utility umbilical 42 represents an integrated electrical/hydraulic control line. Utility umbilical line 42 typically includes conductive wires for providing power to subsea equipment. A control line within the umbilical 42 may carry hydraulic fluid to the subsea distribution unit (SDU) 50 used for controlling items of subsea equipment such as a subsea manifold 20, and trees 15. Such control lines allow for the actuation of valves, chokes, downhole safety valves, and other subsea components from the surface. Utility umbilical 42 also includes a chemical injection tubing or service line which transmits chemical inhibitors to the ocean floor, and then to equipment of the subsea production system 10. The inhibitors are designed and provided in order to ensure that flow from the wells is not affected by the formation of solids in the flow stream such as hydrates, waxes and scale. Thus, the umbilical 42 will typically contain a number of lines bundled together to provide electrical power, control, hydraulic power, fiber optics communication, chemical transportation, or other functionalities.
The utility umbilical 42 connects subsea to an umbilical termination assembly (“UTA”) 40. From the umbilical termination assembly 40, flying lead 44 is provided, and connects to a subsea distribution unit (“SDU”) 50. From the SDU 50, flying leads 52, 54, 56 connect to the individual wells 12, 14, 16, respectively.
In addition to these lines, a separate umbilical line 51 may be directed from the UTA 40 directly to the manifold 20. A displacement fluid injection service line (not seen in
The displacing fluids may be dehydrated and degassed crude oil. Alternatively, the displacing fluids may be diesel. In either instance, an additional option is to inject a traditional chemical inhibitor such as methanol, glycol or MEG before the displacement fluid.
It is understood that the architecture of system 10 shown in
The subsea production system 300 also includes a production facility 330. Typically, the production facility 330 will be either (1) a ship-shaped floating production, storage and offloading vessel (or “FPSO”), or (2) a semi-submersible vessel, (3) a tension-leg platform vessel, or (4) a deep-draft caisson vessel. However, the present methods are not limited by the nature or configuration of the host production facility 330. Indeed, the production facility 330 may be a near-shore or on-shore facility. Further, the production facility 330 may include multiple facilities, such as one facility for injecting water and another facility for receiving produced fluids.
The production cluster 310 is placed in fluid communication with the production facility 330 by a production line. The production line generally comprises a production flowline 315 along the marine floor, and a production riser 335p. Similarly, the injection cluster 320 is placed in fluid communication with the production facility by means of a water injection line. The water injection line generally comprises an injection flowline 325 along the marine floor, and a water injection riser 335i.
The production flowline 315 is preferably insulated. More specifically, the production flowline 315 is preferably a rigid steel pipe-in-pipe insulated flowline such as a catenary riser. It is also preferred that the various jumpers and trees used in the subsea production cluster 310 be insulated. The insulation is designed such that the produced fluids do not enter hydrate formation conditions during steady state conditions at the anticipated minimum flow rates for the produced fluids. However, the water injection flowline 325 is preferably a rigid steel uninsulated flowline.
For the production riser 335p, the connection to the production facility 330 may include a length of flexible production hose 332. Similarly, for the injection line 335i, the connection to the production facility 330 may include a length of flexible injection hose 334. This is particularly true if a riser tower (not shown) is used. It is understood that the connection between the production riser 335p and the flexible production hose 332 is typically at or near a buoy 336. Similarly, it is understood that the connection between the production riser 335p and the flexible production hose 332 is typically at or near a separate buoy 338.
Next, the production system 300 preferably includes a “crossover manifold” 340. The crossover manifold 340 defines an arrangement of pipes and valves that provide selective fluid communication between the production manifold in the production cluster 310 and the injection manifold in the injection cluster 320. The crossover manifold 340 provides a connection path between the water injection flowline 325 and the production flowline 315 for the purpose of moving a pig from the injection cluster 320 to the production cluster 310. The pig is shown at 345 in
In the view of
The subsea production system 300 also may include an umbilical 355. The umbilical 355 may comprise one or more chemical injection tubings, one or more electrical power lines, one or more electrical communication lines, one or more hydraulic fluid lines, a fiber optics communication line, and an oil injection tubing. The chemical injection tubing within the umbilical 355 transmits a hydrate inhibitor to the ocean floor, and then to production equipment of the subsea processing system 300. Similarly, the oil injection tubing transmits a displacement fluid such as diesel or dead crude to the ocean floor. Thus, the umbilical 355 contains a number of lines bundled together to provide electrical power, control, hydraulic power, chemical transportation, or other functionalities.
An umbilical termination assembly 350 is provided in the system 300. The umbilical termination assembly (“UTA”) 350 is preferably landed on the ocean bottom proximate the crossover manifold 340. The umbilical 355 is connected at an upper end to the host production facility 330, and at a lower end to the UTA 350.
Various other features may optionally be included in the subsea production system 300. For example, the production flowline 315 may include a gas lift injection system. An example of a gas lift injection point is shown at 360. Gas is injected at the base of the production riser 335p to help carry fluids to the production facility 330, if necessary.
Additional details of the subsea production system 300 are seen in
The producers 312 are in fluid communication with a production manifold 314. The production manifold 314 comprises a body having a number of valves 316 for controlling the flow of fluid therethrough. Jumpers 318 provide fluid communication between the producers 312 and the valves 316 of the production manifold 314. Optionally, and as shown in
Next, referring to the injection cluster 320, the injection cluster 320 first includes one or more injectors 322. In the illustrative arrangement of the production system 300, four separate injectors 322 are provided. However, any number of injectors 322 may be utilized.
The injection cluster 320 includes a water injection manifold 324. The water injection manifold 324 defines a plurality of valves 326 for providing selective fluid communication with the various injectors 322. Fluid communication is provided through separate jumpers 328.
Of particular interest, a pig 345 is seen within the injection cluster 320. Pigging capability is provided to improve displacement efficiency when displacing the production flowline 315 at the beginning of a long-term shutdown. Preferably, the pig 345 is a batching pig that is fabricated from an elastomeric material that will avoid degradation during storage in a cold, fluid environment. Preferably, the pig 345 will also have the capability of scraping deposited solids from the interior of the production flowline.
The pig 345 is initially transported from the host production facility 330 to a subsea storage location 349 through the water injection line 325/335i. The pig 345 remains in the subsea storage location 349 during production. More specifically, the pig 345 remains in the subsea storage location 349 until hydrate management steps 200 begin in connection with a long-term shutdown. As part of the hydrate management steps 200, the pig 345 is “launched” from the subsea storage location 349 in order to displace live hydrocarbon fluids from the production line 315/335p. The launching of the pig 345 is described further in connection with a discussion of step 225, below.
Also seen in the production system 300 of
The crossover manifold 340 defines a series of valves and pipes. First, a central pipeline 342 is shown. Then, three valves 344, 346 and 348 are seen along central pipeline 342. Valve 344 is a master injection manifold valve; valve 346 is a master crossover manifold injection valve; and valve 348 is a master production manifold valve. As will be described further below, operation of valves 344, 346, 348 controls the movement of fluids and the movement of the pig 345 from the water injection manifold 324 to the production manifold 314.
It can be seen in
An optional feature in the production system 300 is the use of pig detectors. Several pig detectors are seen in
The crossover manifold 340 may be configured in two ways: If the field is developed with both a production manifold 314 and a water injection manifold 324, then the crossover manifold 340 is preferably split, with some components on the production manifold 314, and other components on the water injection manifold 324. The two manifolds 314, 324 are optionally interconnected with a central pipeline 342 and a kicker line 372 for methanol.
As an alternative, the field may be developed with in-line tees (without separate water injection and production manifolds). In this instance, the crossover system 340 consists of a stand-alone manifold located near the outer end of the production flowline 315. The water injection flowline 325 and the crossover manifold 340 are interconnected by an extension of the water injection flowline 315, and a smaller-bore water return line (not shown).
Also visible in
It is understood that the control umbilical 355 will contain a number of other lines comprised of electro-hydraulic steel tube umbilicals. These may include hydraulic power control lines, electrical lines with power/communication conductors, fiber optic lines, methanol injection lines, and other chemical injection lines. The control umbilical 355 connects to the host production facility 330, with the connection configured to include a pig launcher for moving a small pig through line 354. The subsea umbilical termination assembly (UTA) is designed to allow passage of a smaller-diameter pig from the displacement fluid injection service line 354 into the production flowline 315.
The various lines within the control umbilical 355 extend from the FPSO 330 to the ocean bottom. Preferably, the lines (such as lines 352 and 354) are manufactured in a continuous length, including both the dynamic and static sections. The transition from the dynamic to the static section of the control umbilical 355 is as small as possible, and may consist of taper-to-end armor layers, if applicable. The umbilical lines (such as lines 352 and 354) may be installed in I-tubes mounted on the hull of the FPSO 330, and terminating below topside umbilical termination assemblies (TUTA) (not shown). Each umbilical line is preferably provided with a bend stiffener at the “I” tube exit.
In the operational stage shown in
During the production stage of
On the production side, the various producers 312 are also in operation. Production valves 316 and 316′ are in an open position, permitting production fluids to flow under pressure from the producers 312, through the production jumpers 318 and to the production flowline 315. Production fluids then travel upward through the production riser 335p in the water column (not shown) and to the host production facility 330.
It is noted here that the master production manifold valve 348 is also in its closed position. This prevents production fluids from backing up to the central pipeline 342 within the crossover manifold 340.
The subsea production system 300 also includes a crossover displacement system 370. The crossover displacement system 370 provides a mechanism to direct a displacement fluid behind the pig 345. The displacement fluid moves the pig 345 from the subsea storage location 349 and through the central pipeline 342 connecting the water injection manifold 324 and the production manifold 314. In this instance, the displacement fluid is preferably a hydrate inhibitor.
The crossover displacement system 370 first comprises a crossover displacement flowline 372. The crossover displacement flowline 372 also connects the water injection manifold 324 and the production manifold 314. The crossover displacement flowline 372 serves as a conduit for sending hydrate inhibitor from the chemical injection line 352 to a point in the subsea storage location 349 behind the pig 345.
The crossover displacement system 370 also comprises a series of valves. These represent a first valve 374, a second valve 376, and a third valve 378. As will be further described below, these valves 374, 376, 378 facilitate the circulation of the displacing fluid using a hydrate inhibitor pumped through the chemical injection line 352. In the operational production stage of
As noted above, the subsea production system 300 also comprises a subsea storage location 349. The subsea storage location 349 defines a section of pipe located between the master injection manifold valve 344 and the master crossover manifold injection valve 346. The subsea storage location 349 serves as a holding place for the pig 345 during production operations.
In addition, the subsea production system 300 includes a water injection return system 380. The water injection return system 380 is normally closed. However, the water injection return system 380 is opened in connection with the launching of a replacement pig (seen at 345′ in
The water injection return system comprises a return line 382, a first return valve 384, a second return valve 386, and a third return valve 388. In the operational arrangement of
Various valves have been identified herein for the subsea production system 300. It is understood that the valves related to the injection cluster 320, the production cluster 310, the crossover manifold system 340, the UTA 350, the crossover displacement system 370, and the water injection return system 380 are remotely controlled. Typically, remote control is provided by means of electrical signals and/or hydraulic fluid.
Referring again to
In order to provide the inhibitor, a hydrate inhibiting chemical such as methanol is pumped under pressure from the production facility 330 and through the chemical injection service line 352. Valves 374 and 376 of the crossover displacement system 370 remain closed, while valve 378 is opened. In addition, the master production manifold valve 348 and production valves 316′ are opened. Hydrate inhibitor may then be pumped into the production cluster 310 up to valves 316. Production valves 316 and jumpers 318 will be treated by the hydrate inhibitor pump through lines from the production trees and then closed after the operation is complete. Note that while methanol is a preferred hydrate inhibitor, the process may also utilize a low dosage hydrate inhibitor (LDHI) as a hydrate inhibitor. Typically, the LDHI will be admixed with another fluid such as a dead crude (usually not methanol) and may be used instead of methanol or in sequence with methanol. The use of LDHI's in subsea production systems is more fully disclosed in U.S. Provisional Patent Application No. 60/995,134, which is hereby incorporated by reference.
It is noted that for either planned or unplanned shutdowns, the production flowline 315 is depressurized. Depressurization preferably takes place after an established time has elapsed after shut-down. This step is shown in Box 215 of
To conduct depressurization, the production valves 316 are closed but the discharge end of the production riser 335p remains open. As pressure drops, methane and other gases in the production fluids break out of solution. The gas breaking out of solution may be temporarily flared at the production facility, or stored for later use or commercial sale. For example, recovered gases may be routed to a flare scrubber or to a high pressure flare header (not shown) at the host production facility 330. The removal of gas and depressurization of the production flowline serves to further inhibit the formation of hydrates in the production flowline 315.
Preferably, the subsea production system 300 is designed to allow the system 300 to be depressurized to a pressure below that at which hydrates will form at sea water temperature at the depth of interest on both the upstream and downstream sides of any blockage. Depressurization on the upstream (producer) side of a hydrate blockage may be accomplished via the crossover manifold 340 and the umbilical 355. First, the displacement-fluid service line 354 is emptied by injecting hydrocarbon gas from a high-pressure gas injection manifold on the production facility 330. The hydrocarbon gas forces fluids from the displacement-fluid service line 354 through the crossover manifold 340 and into a production well 312 or a water injection well 322. Pressure is then released, allowing the gas to flow back out of the displacement-fluid service line 354. This depressurization process may be repeated as necessary to completely remove liquids from the fluid displacement service line 354 and to depressurize the production flowline 315 to the lowest achievable pressure.
The method 200 next includes the step of pumping a hydrate inhibitor into the central pipeline 342. The purpose is to purge the central pipeline 342 of water. This step is illustrated in Box 220 of
In performing the water displacement step 220, master production manifold valve 348 is closed and the master water injection valve 344 and the master crossover valves 346 remain closed. In this way, the pig 345 remains secure in the subsea storage location 349. The chemical inhibitor displaces water through the water injection return system 380. The third return valve 388 is opened, causing water and hydrate inhibitor to flow through the return line 382. Displaced water flows into one of the water injection wells 322 via open valve 326.
The method 200 next includes the step of launching the subsea pig 345. This step is illustrated in Box 225 of
Related to the step 225 of launching the pig 345 is the injection of a displacement fluid. Preferably, the displacement fluid is a hydrate inhibitor such as methanol. This step is illustrated in Box 230 of
Methanol (or other suitable hydrate inhibitor) can then push the pig 345 through the crossover manifold 340. The methanol acts as a displacement fluid to displace live crude from the flowline 342 and the production manifold 314. In the view of
In one aspect, two pigs may be used. The first pig would be pig 345 seen in
The method 200 next includes the step of isolating the pig storage location 349. This step is illustrated in Box 235 of
Related to this step 235, the method 200 also includes the step of displacing water and production fluids by pumping a displacement fluid behind the pig 345 (and behind the hydrate inhibitor). This step is illustrated in Box 240 of
The implementation of steps 235 and 240 are shown together in
The displacement fluid may be an additional quantity of methanol pumped through displacement fluid service line 354 of the control umbilical 355. However, it is preferred from a cost standpoint that the displacement fluid be dead crude pumped through the displacement-fluid service line 354 of the control umbilical 355. In this instance, the third valve 378 of the crossover displacement system 370 and the master production manifold valve 348 are each closed. In either instance, the pig 345 is pushed to a receiver (not shown) at the host production facility 330 so that all live crude and other production fluids in the riser 315 are pushed ahead of the pig 345.
Displacement is accomplished with dead crude or diesel to prevent hydrate formation. The pig 345, with a methanol slug, is pumped ahead of the dead crude to improve the displacement efficiency and to reduce both chemical requirements and displacement time. The production system 300 is preferably capable of flowing the displacement pig 345 at a velocity of at least 0.3 m/s. Further, the production system 300 is preferably designed to accommodate the operating pressures which occur when driving the pig 345 with dead crude through the displacement line 354.
The method 200 next includes the step of displacing the displacement fluid (the dead crude) from the production system 300. More specifically, the dead crude is displaced from production manifold 314 and the production flowline 315. This step is illustrated in Box 245 of
In order to inject methanol, the first 374 and second 376 valves of the crossover displacement system 370 are closed, but the third valve 378 is opened. Also, the master production manifold valve 348 is opened. Methanol (or other hydrate inhibitor) is urged under pressure through the production manifold 314 and the production flowline 315. Methanol injection will continue during production re-start until the production flowline 315 reaches a minimum safe operating temperature, that is, a temperature that is above the hydrate formation temperature.
In connection with the injection of a displacement fluid, consideration should be given to the tieback distance to the FPSO (or other host facility) 330. The maximum tieback distance for the production system 300 is generally governed by the following parameters:
For a given displacement time, the maximum tieback distance is governed by the displacement flow rate that can be developed through the displacement-fluid service line 354 and the production flowline 315. The maximum displacement flow rate, in turn, is governed by the maximum allowable operating pressure (“MAOP”) in the integrated umbilical 355. The highest operating pressure in the control umbilical 355 is expected to occur near the touch-down point of the umbilical 355, that is, the point at which the line touches the seabed. The maximum pressure in the displacement-fluid service line 354 during displacement operations should not exceed the line's MAOP. Subject to this requirement, the displacement flow rate should be maximized to reduce the displacement time required, and to achieve an adequate pig 345 velocity during displacement.
Those of ordinary skill in the art of subsea architecture will understand that the smaller the diameter of a flow line, the higher the pressure drop that will be experienced in that line. Similarly, the longer the length of a flow line, the higher the pressure drop that will be experienced in that line.
Preliminary steady-state hydraulics were calculated using PipePhase™ software to determine the maximum tieback distance, as governed by a 12-hour displacement time and maximum allowable operating pressure in a service line (due to friction loss and flow rate). The following table lists the maximum tieback distance for three flow line sizes and three corresponding service line sizes, as follows:
It can be seen that a larger service line diameter accommodates a longer tieback distance.
An analysis was also conducted as to the maximum displacement or pumping rate that might be used to displace fluids from a production line 315/335p/332. The study assumed that production operations were taking place in 1,500 meters of water depth, and that hydrocarbon fluids were being displaced with a 30° API dead crude (45 cp at 40° F.). The arrival pressure of the displacement fluid at the FPSO was assumed to be 350 psig.
It is also noted that the friction loss in the service line and the resulting maximum tieback distance are affected by the viscosity of the displacement crude. The maximum pumping rates described above may be increased by adding a drag-reducing agent to the dead crude. Alternatively, or in addition, the viscosity of the displacement fluid may be lowered.
After the dead crude has been displaced from the production manifold 314, procedures are commenced for placing the production system 300 back on line. Optionally, before the system 300 goes back into production, a new pig 345′ may be placed into the subsea storage location 349. Thus, the method 200 may next include the step of launching a replacement pig 345′ into the water injection line 325. This step is illustrated in Box 250 of
In order to land the new pig 345′ in the subsea storage location 349, the master water injection manifold valve 344 is opened. In addition, the water injection valves 326 are opened. However, the first 384 and third 388 water injection return valves are closed.
Once the replacement pig 345′ is landed in the subsea storage location 349, the pig 345′ is secured. This step of the method 200 is indicated at Box 255 of
After the new pig 345′ is secured, the subsea production system 300 is ready to be placed back on line. The step of putting the production wells 312 back on line is indicated at Box 260 of
It is noted that the method 200 does not require that water injection must be completely shut down. If a topside water injection system is available, water injection may continue through the entire process as it does not directly affect the production line. There would typically be some reduction in water flowrate while delivering the replacement pig 345′.
The steps 255 and 260 are illustrated together in
It is also noted that the water injection return system 380 has been closed. In this respect, water is no longer flowing through the return line 382. While the first 384 water injection return system valve is open, the second 386 and third 388 water injection return system valves are closed.
It is also seen that the crossover displacement system 370 is also closed to fluid flow. In this respect, the first 374, second 376 and third 378 bypass valves are closed. Preferably, hydrate inhibitor for production well re-start operations will be provided through other inhibitor lines in the umbilical (not shown). In any event, valve 348 should be closed so that produced fluids will not enter central pipeline 342.
It can also be seen in
As production continues, the operator may choose to continue injecting water through the water injector line 325. The purpose may be to simply dispose of water into a subsurface formation. Alternatively, water may be injected in order to maintain reservoir pressure or provide sweep efficiency. Again, the step of continuing to inject water through the water injection line 325 is illustrated at Box 265 of
A final step in the method 200 for managing hydrates is to produce production fluids to the host production facility 330. This step is illustrated in Box 270 of
A hydrate inhibitor is preferably mixed with the production fluids until the jumpers 318 and production flowline 315 have reached a steady state operating temperature. In one aspect, the subsea production system 300 is designed such that the produced fluids never enter into the hydrate formation region during steady state conditions at the defined minimum flowrates for the wells and flowlines. In one aspect, the time available for the single production flowline displacement is 12 hours, based on a 20-hour cool-down time and 8 hours combined no-touch and initial hydrate inhibitor application.
It is preferred that the time duration for start-up procedures be of sufficiently short duration to minimize any paraffin or “wax” deposition that may take place. Wax deposition is preferably managed by maintaining temperatures throughout the production stream above the wax appearance temperature (WAT).
It is also preferred that the subsea production system 300 be maintained with intermittent pigging. Regular maintenance pigging helps to ensure that the displacement pig 345′ will not become lodged during later displacement operations. The displacement pig 345 may be periodically run through the production flowline 315 for the purpose of maintaining flow assurance in the production flowline.
Various other features may be incorporated into the subsea production system 300. For instance, coiled tubing access may be provided from the production facility 330 to remediate hydrates, wax, asphaltenes, scale, sand, and other solids in the production flowline 315. Also, the production flowline 315 may be designed to permit depressurizing and chemical injection from a mobile offshore drilling unit (“MODU”) at a connection at the production manifold 314. Further still, a subsea pig launcher may be used in lieu of a crossover manifold.
In addition to the specific steps identified above for the hydrate management method 200, steps may optionally be taken to manage wax buildup in the fluid-displacement service line 354. Wax deposition in the umbilical dead oil service line 354 should be managed to prevent blockage or significant reduction in the service line 354 flow capacity over the life of the field. Wax management steps may be a combination of (1) pigging of the service line 354 to remove wax; (2) use of a wax inhibitor to minimize wax deposition in the service line 354; and (3) use of a chemical solvent to remove wax from the service line 354.
The priority and combination of wax management approaches may be selected based on the wax deposition properties of the specific dead crude blends anticipated during the service life of the susbsea production system 300. The number of anticipated displacement events and the wax deposition rate will dictate the cumulative wax deposition build-up, which in turn will guide the required pigging frequency and the opportunity for using wax inhibitors or solvents in lieu of or in addition to pigging.
As can be seen, an improved subsea production system has been provided. The subsea production system utilizes a single production flowline. In one aspect, the subsea production system is intended to provide a single production flowline requiring a low chemical demand. Minimal use of methanol and chemicals for hydrate management is provided. The subsea production system is preferably used for single-field subsea tiebacks in the general range of 10-15 km, although precise tieback limits are case-specific.
While it will be apparent that the invention herein described is well calculated to achieve the benefits and advantages set forth above, it will be appreciated that the invention is susceptible to modification, variation and change without departing from the spirit thereof.
This application claims the benefit of U.S. Provisional Application 60/995,161, filed Sep. 25, 2007.
Filing Document | Filing Date | Country | Kind | 371c Date |
---|---|---|---|---|
PCT/US08/73354 | 8/15/2008 | WO | 00 | 5/24/2010 |
Number | Date | Country | |
---|---|---|---|
60995161 | Sep 2007 | US |