Method and apparatus for frac/gravel packs

Information

  • Patent Grant
  • 6540022
  • Patent Number
    6,540,022
  • Date Filed
    Tuesday, February 19, 2002
    22 years ago
  • Date Issued
    Tuesday, April 1, 2003
    21 years ago
Abstract
A method for fracturing a formation or gravel packing a borehole using a screen assembly having a plurality of screens mounted on a base member and a plurality of apertures disposed at predetermined intervals along the screen assembly. A flow-control service assembly is disposed within the screen assembly and includes an outer tubular member and an inner tubular member. The outer tubular member includes a plurality of ports that communicate with the apertures in the screen assembly. Barriers are placed around the ports on the outer tubular member to prevent the formation of gravel bridges across the inner annulus between the inner tubular member and outer tubular member. The inner annulus provides alternative flow paths around the ports upon the ports becoming closed to fluid flow such as by bridges.
Description




STATEMENT REGARDING FEDERALLY SPONSORED RESEARCH OR DEVELOPMENT




Not Applicable.




FIELD OF THE INVENTION




The present invention relates to improved methods and apparatus for completing wells in unconsolidated subterranean zones. More particularly, the present invention relates to improved methods and apparatus for achieving effective frac treatments and uniform gravel packs in completing such wells. Still more particularly, the present, invention relates to improved methods for achieving effective frac treatments and uniform gravel packs over long and/or deviated production intervals and maximizing the internal production area of the screen assembly by removing an inner flow-control service assembly after treatment.




BACKGROUND OF THE INVENTION




Oil and gas wells are often completed in unconsolidated formations containing loose and incompetent fines and sand that migrate with fluids produced by the wells. The presence of formation fines and sand in the produced fluids is disadvantageous and undesirable in that the particles abrade and damage pumping and other producing equipment and reduce the fluid production capabilities of the producing zones in the wells.




Completing unconsolidated subterranean zones typically comprises a frac treatment and a gravel pack. A frac/gravel pack apparatus, which includes a sand screen assembly and the like, is commonly installed in the wellbore penetrating the unconsolidated zone. During frac treatment, the zone is stimulated by creating fractures in the rock and depositing particulate material, typically graded sand or man-made proppant material, in the fractures to maintain them in open positions. Then the gravel pack operation commences to fill the annular area between the screen assembly and the wellbore with specially sized particulate material, typically graded sand or man-made proppant. The particulate material creates a barrier around the screen and serves as a filter to help assure formation fines and sand do not migrate with produced fluids into the wellbore. Preferably, to simplify operations, the frac treatment particulate material is the same as the gravel packing particulate material. However, as described herein, the term “proppant” refers to the frac treatment particulate material and the term “gravel” refers to the gravel packing particulate material.




In a typical frac/gravel pack completion, a screen assembly is placed in the wellbore and positioned within the unconsolidated subterranean zone to be completed. As shown in

FIG. 1

, a screen assembly


130


and a wash pipe


140


are typically connected to a tool


100


that includes a production packer


120


and a cross-over


110


. The tool


100


is in turn connected to a work or production string


190


extending from the surface, which lowers tool


100


into the wellbore until screen assembly


130


is properly positioned adjacent the unconsolidated subterranean zone to be completed.




To begin the completion, the interval adjacent the zone is first isolated. The bottom of the well


195


typically isolates the lower end of the interval or alternatively a packer can seal the lower end of the interval if the zone is higher up in the well. The production packer


120


typically seals the upper end of the interval or alternatively the wellhead may isolate the upper end of the interval if the zone is located adjacent the top of the well. The cross-over


110


is located at the top of the screen assembly


130


, and during frac treatment a frac fluid, such as viscous gel, for example, is first pumped down the production string


190


, into tool


100


and through the cross-over


110


along path


160


. The frac fluid passes through cross-over ports


115


below the production packer


120


, flowing from the flowbore of production string


190


and into the annular area or annulus


135


between the screen assembly


130


and the casing


180


.




Initially the assembly is in the “squeeze” position where no fluids return to the surface. In the squeeze position, valve


113


at the top of the wash pipe is closed so fluids cannot flow through wash pipe


140


. During squeeze, the frac fluid, typically viscous gel mixed with proppant, is forced through perforations


150


extending through the casing


180


and into the formation. The frac fluid tends to fracture or part the rock to form open void spaces in the formation. As more rock is fractured, the void space surface area increases in the formation. The larger the void space surface area, the more the carrier liquid in the frac fluid leaks off into the formation until an equilibrium is reached where the amount of fluid introduced into the formation approximates the amount of fluid leaking off into the rock, whereby the fracture stops propagating. If equilibrium is not reached, fracture propagation can also be stopped as proppant reaches the tip of the fracture. This is commonly referred to as a tip screen out design. Next a slurry of proppant material is pumped into the annulus


135


and injected into the formation through perforations


150


to maintain the voids in an open position for production.




In a frac treatment, the goal is to fracture the entire interval uniformly from top to bottom. However, because cross-over


110


introduces frac fluid at the top of the formation interval through ports


115


at a very high flow rate, friction causes a large pressure drop as the frac fluid flows down annulus


135


to reach the bottom


195


of the interval. Therefore, more pressure is exerted on the upper extent of the formation interval than on the lower extent of the interval so that potentially full fracturing occurs adjacent the top of the production zone while reduced or no fracturing occurs. adjacent the bottom. Additionally, formation strength tends to increase at greater depths such that the longer the zone or interval, the greater the strength gradient between the rock at the top and bottom. Because higher fluid pressures are exerted on the weaker rock at the top, and lower fluid pressures are exerted on the stronger rock at the bottom, the strength gradient adds to the concern that only the upper extent of the interval is being fully fractured. To resolve these problems and achieve more uniform fracturing, it would be advantageous to have a frac apparatus capable of injecting frac fluid into the formation at fairly uniform pressures along the entire interval length from top to bottom. It would also be advantageous to have a frac apparatus capable of continuing to apply frac pressure to the lower extent of the formation even when fractures in the upper interval reach a “tip screen out” condition and therefore stop accepting frac fluids or do so at a reduced rate.




Once the frac treatment is complete, the gravel pack commences, or the gravel pack may take place simultaneously with the frac treatment. During gravel pack, the objective is to uniformly fill outer annulus


135


with gravel along the entire interval. Prior to introducing the gravel pack slurry, the assembly is placed in the “circulation” position by opening valve


113


to allow flow through wash pipe


140


back to the surface. The slurry is then introduced into the formation to gravel pack the wellbore. As slurry moves along path


160


, out cross-over paths


115


and into annulus


135


, the fluid in the slurry leaks off along path


170


through perforations


150


into the subterranean zone and/or through the screen


130


that is sized to prevent the gravel in the slurry from flowing therethrough. The fluids flowing back through the screen


130


, enter the inner annular area or annulus


145


formed between the screen


130


and the inner wash pipe


140


, and flow through the lower end of wash pipe


140


up path


185


. The return fluids flow out through cross-over port


112


into annulus


105


above the production packer


120


formed between the work string


190


and the casing


180


, then back to the surface.




The gravel in the slurry is very uniform in size and has a very high permeability. As the fluid leaks off through the screen


130


, the gravel drops out of the slurry and builds up from the formation fractures back toward the wellbore, filling perforations


150


and outer annulus


135


around the screen


130


to form a gravel pack. The size of the gravel in the gravel pack is selected to prevent formation fines and sand from flowing into the wellbore with the produced fluids.




During a gravel-packing operation, the objective is to uniformly pack the gravel along the entire length of the screen assembly


130


. Conventional gravel packing using cross-over


110


begins at the bottom


195


of the interval and packs upward. However, with a high leak off of fluid through the perforations


150


and into the formation, the gravel tends to deposit around the perforations


150


thus forming a node. A node is a build up of gravel that grows radially and may grow so large that it forms a bridge and completely blocks the outer annulus


135


between the screen


130


and casing


180


. Although the primary flow of the gravel pack slurry begins along the axis of the casing


180


, to the extent that the flow becomes radial, gravel nodes will build up and grow radially in the outer annulus


135


. When the gravel is packed grain to grain to completely block the outer annulus


135


with gravel, that is commonly termed “screen out” in the industry. Bridging or screen out can occur during gravel packing or during frac treatment when the proppant is injected to maintain the voids in an open position. If formation permeability variations and/or the fracture geometry cause a bridge to form in the annulus around the screen during packing, the gravel slurry will begin packing upward from the bridge. This problem occurs particularly in gravel packs in long and/or deviated unconsolidated producing intervals. The resulting incomplete annular pack has sections of screen that remain uncovered, which can lead to formation sand production, screen erosion and eventual failure of the completion.





FIG. 2

illustrates the problem of the formation of gravel bridges


200


in the outer annulus


135


around the screen


130


resulting in non-uniform gravel packing of annulus


135


between the screen


130


and casing


180


. This may occur with conventional frac treatments because fractures in the formation do not grow uniformly, and carrier fluid leaks off into high permeability portions of the subterranean zone


210


thereby causing gravel to fill perforations


250


and form bridges


200


in the annulus


135


before all the gravel has been placed along screen


130


. The bridges


200


block further flow of the slurry through the outer annulus


135


leaving voids


220


,


230


in annulus


135


. When the well is placed on production, the flow of produced fluids may be concentrated through the voids


220


,


230


in the gravel pack, soon causing the screen


130


to be eroded by pressurized produced fluids and the migration of formation fines and sand into the production string, thus inhibiting production.




In attempts to prevent voids along the screen


130


in gravel pack completions, special screens having external shunt tubes have been developed and used. See, for example, U.S. Pat. No. 4,945,991. The shunt tubes run externally along the outside of the screen assembly and have holes approximately every 6 feet to inject gravel into the annulus between the screen assembly and the wellbore or casing at each hole location. During a gravel pack completion, if the major flow path is blocked because a bridge develops, a secondary or alternative flow path is available through the shunt tubes. If there are voids along the screen below the bridge, gravel can be injected into the annulus through the shunt tube holes to fill the voids to the top of the interval. The holes are sized to restrict the flow out into the annulus and reduce the rate at which fluid leaks off to bridged portions of the overall interval. When screen out occurs at one hole, the shunt tube itself provides an open flow path for the slurry to proceed to the next hole and begin filling the void in that area. When the gravel is packed above the top perforation in the interval, the pressure goes up dramatically, indicating to the operator that the interval is filly gravel packed.




While shunt-tube screen assemblies have achieved varying degrees of success in achieving uniform gravel packs, they are very costly and remain in the well after gravel packing to become part of the permanent assembly. Because shunt tubes are disposed between the screen assembly and the wellbore wall, the internal diameter of the screen assembly is reduced to accommodate the shunt tubes, thereby limiting the available production area, which is especially undesirable in higher production rate wells. It would be advantageous to have a gravel pack apparatus with alternative flow paths that did not reduce or limit the production area of the screen assembly.




Further improved apparatus and methods of achieving uniform gravel packing are shown in U.S. patent application Ser. No. 09/399,674 filed on Sep. 21, 1999, which is a continuation-in-part of Ser. No. 09/361,714 filed on Jul. 27, 1999, which is a continuation-in-part of application Ser. No. 09/084,906 filed on May 26, 1998, now U.S. Pat. No. 5,934,376, which is a continuation-in-part of application Ser. No. 08/951,936 filed on Oct. 16, 1997, now U.S. Pat. No. 6,003,600, all hereby incorporated herein by reference. See also European patent application EP 0 909 874 A2 published Apr. 21, 1999 and European patent application EP 0 909 875 A2 published Apr. 21, 1999, both hereby incorporated herein by reference.




A slotted liner, having an internal screen disposed therein, is placed within an unconsolidated subterranean zone whereby an inner annulus is formed between the screen and the slotted liner. The inner annulus is isolated from the outer annulus between the slotted liner and the wellbore wall and provides an alternative flow path for the gravel pack slurry. The gravel pack slurry flows through the inner annulus and outer annulus, between either or both the sand screen and the slotted liner and the liner and the wellbore wall by way of the slotted liner. Particulate material is thereby uniformly packed into the annuli between the screen and the slotted liner and between the slotted liner and the zone. If a bridge forms in the outer annulus, then the alternative flow path through the inner annulus allows the void to be filled beneath the bridge in the outer annulus.




The permeable pack of particulate material formed prevents the migration of formation fines and sand into the wellbore with the fluids produced from the unconsolidated zone. To prevent bridges from forming in the inner annulus, dividers may be provided that extend between the liner and screen whereby alternative flow paths in the inner annulus are formed between the screen and the slotted liner. This assembly is successful in preventing bridges from forming; however, the slotted liner requires adequate space between the screen assembly and the wellbore wall, which thereby reduces the production area of the screen assembly.




Thus, there are needs for improved methods and apparatus for completing wells in unconsolidated subterranean zones whereby the migration of formation fines and sand with produced fluids can be economically and permanently prevented while allowing the efficient production of hydrocarbons from the unconsolidated producing zone. In particular, there is a need for a frac/gravel pack apparatus which provides alternative flow paths to prevent voids from forming in the gravel pack and which does not limit or reduce the production area of the screen assembly.




The present invention overcomes the deficiencies of the prior art.




SUMMARY OF THE INVENTION




The frac/gravel pack apparatus of the present invention includes a screen assembly having a flow-control assembly disposed therein. A production packer is connected above the screen assembly to support the screen assembly within the wellbore. The screen assembly includes a base member, screens mounted on the base member, and connector subs connecting adjacent base member sections. The connector subs include apertures or ports and shiftable sleeves for closing the ports. The ports are spaced at predetermined intervals along the screen assembly. The shiftable sleeves are in the open position to open the ports during treatmnent, and the sleeves are shifted to a closed position to close the ports when the flow-control assembly is removed from the well.




The flow-control assembly includes a service assembly and a cross-over or other connection between the service assembly and the work string extending to the surface. The service assembly includes an outer tube, an internal tube, and diverters in the form of caps or shrouds. The outer tube includes externally mounted collet mechanisms and apertures or ports that align with the screen assembly ports. The internal tube is disposed within the outer tube and passes liquid returns to the surface after the returns flow through the screen assembly during gravel packing. The diverters are mounted within the outer tube and cover each port to provide a bridge barrier. Since bridging is most likely to occur at a port, the diverters mounted just inside the outer tube prevent nodes from extending radially across the inner annulus between the service assembly outer tube and internal tube and thereby prevent bridges from forming to block flow through the inner annulus. Therefore, when a bridge builds at one port, the diverter halts the radial formation of the bridge to keep an alternative flow path through the service assembly open to allow the frac fluids or gravel pack slurry to reach lower ports. Externally mounted collet mechanisms on the outer tube are designed to engage and close the shiftable sleeves as the flow-control service assembly is removed from the well after frac treatment and gravel packing are complete.




The present invention features improved methods and apparatus for fracture stimulating and gravel packing wells in unconsolidated subterranean zones, meeting the needs described above and overcoming the deficiencies of the prior art.




The improved methods comprise the steps of placing a screen assembly with a flow-control service assembly disposed therein in an unconsolidated subterranean zone; isolating the outer annulus between the screen assembly and the wellbore wall; and injecting frac fluids or a gravel pack slurry through the service assembly into the outer annulus between the screen assembly and the zone by way of axial ports located at predetermined intervals along the outer tube of the service assembly aligned with ports in the screen assembly.




The unconsolidated formation is fractured during the injection of the frac fluids into the unconsolidated producing zone with proppant being deposited in the fractures. The frac fluid is injected into the formation at a high flow rate through each of the ports, allowing a fairly uniform pressure to be applied at each port location to efficiently and uniformly fracture the zone along the entire interval from top to bottom.




During gravel packing, the particulate material in the slurry is uniformly packed into the outer annulus between the screen assembly and the borehole wall. As bridges form in the outer annulus, the inner annulus, formed between the service assembly outer tube and internal tube, provides alternative flow paths to other ports through which gravel pack slurry can flow to fill any voids formed around the screen assembly, thereby achieving a uniform gravel pack. Diverters covering the service assembly outer tube ports form a radial barrier to prevent the formation of bridges in the inner annulus thereby maintaining the alternative flow paths open through the service assembly so that particulate material can be injected into the outer annulus through lower ports to fill any remaining voids. The permeable pack of particulate material then prevents the migration of formation fines and sand into the wellbore with fluids produced from the unconsolidated zone. Once the frac treatment and gravel packing are complete, the flow-control service assembly is preferably removed from the well. As the flow-control service assembly is raised within the well bore, the outer tube closing mechanisms engage the shiftable sleeves and shift them upward to close the screen assembly ports.




The improved methods and apparatus of the present invention provide more uniform fracture pressures along the entire interval from top to bottom and prevent the formation of voids in the gravel pack, thereby producing an effective fracture and gravel pack. The apparatus of the present invention has the advantage of having a removable flow-control service assembly after frac treatment and gravel packing are complete, and therefore the flow-control service assembly does not limit the available production area within the screen assembly.




It is, therefore, a general object of the present invention to provide improved methods of fracture stimulating and gravel packing wells in unconsolidated subterranean zones. The present invention comprises a combination of features and advantages that enable it to overcome various problems of prior methods and apparatus. The characteristics described above, as well as other features, will be readily apparent to those skilled in the art upon reading the following detailed description of the preferred embodiments of the invention, and by referring to the accompanying drawings.











BRIEF DESCRIPTION OF THE DRAWINGS




For a more detailed description of the preferred embodiment of the present invention, reference will now be made to the accompanying drawings, wherein:





FIG. 1

is a cross-sectional elevation view of a cased wellbore penetrating an unconsolidated subterranean producing zone and having a conventional frac/gravel pack apparatus;





FIG. 2

is a perspective view, partially in cross-section, illustrating the formation of bridges and voids in prior art gravel packs;





FIG. 3

is a cross-sectional elevation view of a cased wellbore penetrating an unconsolidated subterranean producing zone and having a screen assembly, with an internal flow-control service assembly including an outer tube and an internal tube;





FIG. 4A

is a side view, partially in cross-section, of a shiftable sleeve mounted on a connector sub with the sleeve in the open position;





FIG. 4B

is a side view, partially in cross-section, of the shiftable sleeve of

FIG. 4A

in the closed position;





FIG. 5

is an enlarged, isometric cross-sectional view of the shiftable sleeve of

FIG. 4

mounted adjacent ports in the service assembly outer tube and connector sub;





FIG. 6

is a cross-sectional view taken perpendicular to the axis of the wellbore showing the shiftable sleeve of

FIGS. 4 and 5

with axial bores and radial ports therethrough;





FIG. 7

is an enlarged schematic view of the screen assembly and service assembly of

FIG. 3

showing the closing mechanism for the shiftable sleeve;





FIG. 8A

is a side schematic view of the service assembly outer tube and internal tube having an internal diverter over the ports and showing the flow therethrough before a bridge is formed;





FIG. 8B

is a cross-sectional view at plane


8


B—


8


B in

FIG. 8A

showing a half moon-shaped embodiment of the diverter of

FIG. 8A

;





FIG. 9A

is a side schematic view of flow through the inner annulus and diverter when no bridge has formed;





FIG. 9B

is a side schematic view of flow through the alternative flow paths available around the diverter when a bridge has formed inside the diverter;





FIG. 10A

is a cross-sectional view taken perpendicular to the axis of the screen assembly and service assembly showing an alternative embodiment of a diverter assembly having vanes and channelizers connected to a section of diverter pipe and positioned in the inner annulus between the service assembly outer tube and internal tube;





FIG. 10B

is an isometric view of the diverter assembly of

FIG. 10A

;





FIG. 11A

is a cross-sectional view taken perpendicular to the axis of the screen assembly and service assembly showing an alternative embodiment of the diverter assembly of

FIG. 10A

having an axially continuous diverter pipe with apertures or ports therethrough;





FIG. 11B

is an isometric view of the diverter assembly of

FIG. 11A

;





FIG. 12A

is a side schematic view showing flow through the inner annulus and out an alternative port after a bridge has formed across the outer annulus and within the diverter;





FIG. 12B

is a cross-sectional view at plane


12


B—


12


B in

FIG. 12A

showing a half moon-shaped embodiment of the diverter of

FIG. 12A

showing a bridge formed within the diverter;





FIG. 13

is a cross-sectional elevation view of the multi-position valve assembly at the bottom of the flow-control service assembly with the multi-position valve in the “circulation” position;





FIG. 14

is a cross-sectional elevation view of the multi-position valve assembly of

FIG. 13

with the multi-position valve in the “squeeze” position; and





FIG. 15

is a cross-sectional elevation view of the multi-position valve assembly of

FIG. 13

with the multi-position valve in the “reverse flow” position.











DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENT




The present invention provides improved apparatus and methods for fracture stimulating and gravel packing an unconsolidated subterranean zone penetrated by a wellbore. The apparatus is susceptible to embodiments of different forms. The drawings described in detail herein illustrate preferred embodiments of the present invention, however the disclosure should be understood to exemplify the principles of the present invention and not limit the invention to the embodiments illustrated and described herein.




The apparatus and methods may be used in either vertical or horizontal wellbores and in either bore holes which are open-hole or cased. The term “vertical wellbore” as used herein means the portion of a wellbore in an unconsolidated subterranean producing zone to be completed which is substantially vertical or deviated from vertical in an amount up to about 30°. A highly deviated well is often considered to be in the range of 30° to 70°. The term “horizontal wellbore” as used herein means the portion of a wellbore in an unconsolidated subterranean producing zone to be completed which is substantially horizontal or at an angle from vertical in the range of from about 70° to about 90° or more.




The present invention is directed to improved methods and apparatus for achieving efficient fracturing of the entire zone or interval from top to bottom and then uniformly gravel packing that interval. The flow rate during fracturing is much higher than the flow rate during gravel packing because the frac fluid must be injected into the formation at high pressures to cause fractures in the formation. As the fluid leaks off into the formation, frac fluids must be introduced at high pressures as well as high flow-rates to continue to propagate the fractures. Preferably the frac/gravel pack intervals described herein range from approximately thirty to three hundred feet in order to achieve uniform fracturing.




Referring now to the drawings, and particularly to

FIG. 3

, a vertical wellbore


300


having casing


10


cemented therein, such as at


316


, is illustrated extending into an unconsolidated subterranean zone


312


. A plurality of spaced perforations


318


, produced in the wellbore


300


utilizing conventional perforating gun apparatus, extend through the casing


10


, cement


316


and into the unconsolidated producing zone


312


.




In accordance with the apparatus and methods of the present invention, a screen assembly


12


, having an internal flow-control service assembly


27


installed therein, is supported within the wellbore


300


by a production packer


326


isolating the top of the interval


360


to be treated. The production packer


326


is a conventional packer that is well known to those skilled in the art. The flow-control service assembly


27


comprises an outer tube


26


, an internal tube


40


, and a cross-over assembly


330


. The cross-over assembly


330


supports the service assembly outer tube


26


and internal tube


40


within production packer


326


and screen assembly


12


. The cross-over assembly


330


includes a three-way connector, such as for example, the connector described in U.S. patent application Ser. No. 09/399,674 filed on Sep. 21, 1999, hereby incorporated herein by reference, that connects the outer tube


26


and internal tube


40


to work string


328


. The three-way connector provides fluid communication between the work string


328


and flow path


28


in outer tube


26


. It also allows fluid communication between flow path


86


within internal tube


40


and the annular area


305


formed between casing


10


and work string


328


.




The service assembly outer tube


26


and internal tube


40


form an inner annulus


32


, the screen assembly


12


and the service assembly outer tube


26


form a medial annulus


34


, and the screen assembly


12


and the casing


10


form an outer annulus


30


. The screen assembly


12


and outer tube


26


have lengths such that they substantially span the length of the producing interval


360


in the wellbore


300


. The internal tube


40


is suspended within the outer tube


26


and is extended to the lower end of the screen assembly


12


. A return path for fluids to the surface includes the flowbore


41


of the internal tube


40


, the cross-over assembly


330


, and the annular area


305


formed between the work string


328


and casing


10


.




Screen assembly


12


includes a base member


14


, such as a pipe, having apertures


16


through its wall, which can be circular or another shape such as rectangular, and a plurality of screens


18


disposed over the apertures


16


on base member


14


. Adjacent base members


14


are connected together by a connector sub


50


. As shown in

FIGS. 4A and 4B

, each sub


50


has a plurality of exit ports


20




a


through its wall, and mounted on each sub


50


is sleeve assembly


22


having exit ports alignable with exit ports


20




a


. Sleeve


22


is reciprocably mounted to sub


50


so as to be shiftable between an open and closed position over ports


20


.

FIG. 4A

shows port


20




b


in sleeve


22


aligned with port


20




a


in sub


50


in the open position.

FIG. 4B

shows port


20




a


covered by sleeve


22


in the closed position. The ports


20


are spaced along the length of interval


360


at predetermined locations to provide uniform access to the formation along interval


360


. The particular fracturing and gravel pack application determines the required spacing of ports


20


, but preferably subs


50


with ports


20




a


are spaced in the range of five to thirty feet apart, and preferably approximately ten feet apart.




As shown in

FIGS. 4A

,


4


B and


5


, seals


46


, preferably o-rings or other seals, seal between the sleeves


22


and the inside surface of the sub


50


. As best shown in

FIGS. 5 and 6

, sleeves


22


also include a plurality of vertical bores


42


providing a hydraulic communication across connector sub


50


through medial annulus


34


to allow fluid communication above and below each sleeve


22


. As shown in

FIG. 3

, returns


44


will pass through screens


18


, through base member apertures


16


, and into medial annulus


34


. The returns then flow through bores


42


, as shown at


44


in

FIG. 5

, passing through sleeves


22


while flowing down through medial annulus


34


to the lower end of outer tube


26


and up internal tube


40


as shown in FIG.


3


.




Referring now to

FIGS. 3 and 7

, outer tube


26


has apertures or ports


25


which can be circular as illustrated in the drawings, or they can be rectangular or another shape. Ports


25


align with ports


20


such that when sleeves


22


are in the open position during frac treatment and gravel packing, there is fluid flow therethrough. A diverter


24


is disposed over each port


25


and is preferably mounted to the inside of the outer tube


26


, as shown in

FIG. 3

, but it can alternatively be mounted to the internal tube


40


, as shown in FIG.


7


. Diverter


24


may be a cap or shroud and is designed to cover exit port


25


to form a barrier to gravel build up. Diverter


24


is not continuous, nor does it extend the length of base pipe


14


, but instead merely extends a short distance, such as an inch or two, on each side of exit port


25


so as to maximize the flow area available in the inner annulus


32


.





FIG. 8B

depicts an end view taken at section


8


B—


8


B of

FIG. 8A

showing one embodiment of the diverter


24


having a half-moon shape cross section forming a cover or barrier over ports


25


,


20


. The diverter


24


is open at the top and bottom, and as shown in

FIGS. 8A and 9A

, allows fluid to flow through diverter


24


along path


28


and out through ports


25


,


20


or fluid can alternatively flow around diverter


24


along the flow path indicated by arrows


62


.




Referring now to

FIGS. 10A and 10B

,

FIG. 10A

shows a cross-sectional view and

FIG. 10B

shows an isometric view of another diverter embodiment, diverter assembly


52


. Shown in

FIG. 10A

are the screen assembly


12


, including connector sub


50


and sleeve


22


, with service assembly outer tube


26


and internal tube


40


disposed therein as shown in

FIG. 3

, but with diverter assembly


52


replacing diverter


24


. Diverter assembly


52


is mounted internally to outer tube


26


and disposed between the outer tube


26


and internal tube


40


centralizing internal tube


40


within outer tube


26


. Diverter assembly


52


comprises a diverter pipe


56


, outer vanes


64


, and inner centralizers


66


. Vanes


64


are mounted to the outside of diverter pipe


56


and extend radially along each side of ports


25


,


20


forming flow areas


32


a around exit ports


25


,


20


and flow areas


32




b


between exit ports


25


,


20


. Centralizers


66


are mounted to the inside of diverter pipe


56


and extend radially to the internal tube


40


forming. flow areas


32




c


. Diverter pipe


56


and vanes


64


between adjacent exit ports


25


,


20


prevent bridges from extending annularly to block flow by preventing nodes from forming past flow areas


32




a


. Therefore, if flow is blocked by a bridge


58


in one flow area, fluid pathways are still open through flow areas


32




a


,


32




b


and


32




c


in inner annulus


32


. If the bridge


58


blocks the outer annulus


30


between the screen assembly


12


and the wellbore, then liquids may nevertheless return through the screen and flow along the medial annulus


34


between the service assembly outer tube


26


and the screen assembly


12


via the vertical bores


42


in sleeves


22


.




As shown in

FIG. 10B

diverter pipe


56


is a lengthwise section of pipe that extends a short distance, such as one to two feet, in the axial direction above and below the center point of ports


25


,


20


. Vanes


64


and centralizers


66


are approximately the same axial length as the section of diverter pipe


56


.





FIGS. 11A and 11B

depict an alternative embodiment of the diverter assembly of

FIGS. 10A and 10B

.

FIG. 11A

shows a cross-sectional view of a diverter assembly


52




a


including a diverter pipe


56




a


having apertures or holes


57


therethrough.

FIG. 11B

provides an isometric view of diverter assembly


52




a


showing diverter pipe


56




a


extending in the axial direction and having holes


57


, shown here above and below vanes


64


around ports


25


,


20


. Holes


57


can be located at any point around the periphery of diverter pipe


56




a


, but should be located in the axial areas between sections of vanes and centralizers. If flow is blocked by a bridge


58


in one flow area, fluid pathways are still open through alternative flow areas


32




a


,


32




b


and


32




c


, and holes


57


allow flow communication between areas


32




c


and areas


32




a


,


32




b


. If the bridge


58


blocks the outer annulus


30


between the screen assembly


12


and the wellbore, then liquids may nevertheless return through the screen and flow along the medial annulus


34


between the service assembly outer tube


26


and the screen assembly


12


via the vertical bores


42


in sleeves


22


.




Referring now to

FIGS. 3 and 7

, an actuator member


48


is disposed on outer tube


26


below each sleeve


22


on sub


50


along the screen assembly


12


. After frac treatment and gravel packing is complete, flow-control service assembly


27


is raised within the wellbore


300


for removal. Sleeves


22


remain in the open position until flow-control service assembly


27


is removed causing actuator member


48


to engage sleeve


22


and shift it upwardly so as to close it over port


20




a


as shown in

FIG. 4B

whereby port


20




b


is no longer in alignment with port


20




a


. Therefore, after completing the well, the flow-control service assembly


27


, with outer tube


26


, internal tube


40


, and cross-over


330


can be removed from the well leaving only the screen assembly


12


with base pipe


14


, connector subs


50


, screens


18


and sleeves


22


in the closed and locked position in the borehole. One embodiment of the actuator member


48


in the form of a weight-down collet is shown in U.S. Pat. No. 5,921,318, hereby incorporated herein by reference.




Referring now to

FIGS. 13 through 15

, the flow-control service assembly


27


includes a multi-position valve assembly


80


mounted on the lower ends of outer tube


26


and internal tube


40


which may be opened or closed to selectively allow flow through the flowbore


41


of internal tube


40


. Although valve


80


is not limited to a certain embodiment and may have a number of different constructions, one embodiment of valve


80


includes a stinger assembly


76


disposed on the lower end of internal tube


40


and a receptacle assembly


74


disposed on the lower end of outer tube


26


. The stinger assembly


76


is reciprocably disposed within the receptacle assembly


74


such that by raising or lowering the internal tube


40


with respect to the outer tube


26


, valve


80


moves between multiple positions, including the “circulation” position shown in

FIG. 13

, the “squeeze” position shown in

FIG. 14

, or the “reverse flow” position shown in FIG.


15


.




As shown in

FIG. 13

, with the internal tube


40


in the lowermost position with respect to outer tube


26


, ports


82


in the receptacle assembly


74


align with ports


45


in the stinger assembly


76


to allow fluid to enter and flow up the flowbore


41


of internal tube


40


along path


86


to the surface. In this circulation position, valve


80


allows flow from medial annulus


34


and outer annulus


30


into flowbore


41


of internal tube


40


. As shown in

FIG. 14

, with the internal tube


40


in its intermediate or squeeze position, ports


45


in the stinger assembly


76


are out of alignment with ports


82


in the receptacle assembly


74


. Therefore, because the lower end of stinger assembly


76


is closed off and ports


45


are closed off by receptacle assembly


74


, flow is prevented from entering and flowing up flowbore


41


of internal tube


40


. Thus, there is no flow from annuli


32


,


34


, or


30


into internal tube


40


. As shown in

FIG. 15

, with the internal tube


40


in its upper or reverse flow position, ports


45


in stinger assembly


76


have moved above receptacle assembly


74


and are exposed to inner annulus


32


. In this position, fluid may flow from the surface through the flowbore


41


of internal tube


40


and through ports


45


into inner annulus


32


or fluid may flow through inner annulus


32


into the flowbore


41


of internal tube


40


and up to the surface. Thus, there is flow between inner annulus


32


and flowbore


41


but not between annuli


34


or


30


and flowbore


41


.




Referring again to

FIG. 3

, in operulion, the screen assembly


12


and production packer


326


are installed in the well bore with the screen assembly


12


having a length allowing it to bridge or extend the length of the production zone interval


360


to be treated. The flow-control service assembly


27


with cross-over assembly


330


, outer tube


26


, internal tube


40


, and valve assembly


80


are installed on work string


328


in the wellbore


300


. Inner annulus


32


, medial annulus


34


and outer annulus


30


are thus formed across interval


360


. Upon setting the packer


326


in the casing


10


, the outer annulus


30


between the screen assembly


12


and the casing


10


is isolated.




Referring now to

FIGS. 3 and 13

, in the frac treatment, a frac fluid is injected down work string


328


and through cross-over


330


into inner.annulus


32


between internal tube


40


and outer tube


26


along primary flow path


28


. The frac fluid passes downwardly through inner annulus


32


and through aligned and open ports


20


,


25


into outer annulus


30


. Initially outer annulus


30


is filled with well fluids or preferably brine, for example, which is displaced by the incoming frac fluids and returned to the surface. The multi-position valve


80


is initially in the circulation position, allowing the well fluids or brine to pass through screens


18


and slots


16


in base members


14


and down medial annulus


34


between the screen assembly


12


and the outer tube


26


, passing through axial ports


42


in sleeves


22


as shown in FIG.


5


. Ports


45


in the stinger assembly


76


on wash pipe


40


are aligned with open ports


82


in the receptacle assembly


74


on valve assembly


80


to allow flow upwardly through flowbore


41


along path


86


.




Referring now to

FIGS. 3 and 14

, once the well fluid or brine is fully displaced, the valve assembly


80


is moved to the “squeeze” position as shown in FIG.


14


. In the squeeze position, internal tube


40


is raised with respect to outer tube


26


so that ports


45


in stinger assembly


76


are out of alignment with ports


82


in receptacle assembly


74


. The bottom of internal tube


40


is closed off and because ports


45


are covered by the wall of receptacle assembly


74


, fluid is prevented from entering internal tube


40


and flowing to the surface. Thus, the frac fluid is pumped at a high flow rate and under high pressures down work string


328


and into outer annulus


30


. Because the frac fluid is prevented from flowing to the surface through internal tube


40


, it is forced through perforations


318


and into the formation


312


. By injecting frac fluid at high flow rates and pressure through perforations


318


, the rock in the formation is fractured creating open void spaces in the formation until equilibrium is reached, i.e., the amount of frac fluid introduced into the formation equals the amount of fluid leaking off into the formation and the fractures stop propagating. Alternatively, if a leakage equilibrium is not achieved, a tip screen out approach may be used where proppant is -injected into the fracture tips to prevent further fracture propagation. Then proppant is added to the frac fluid and injected into perforations


318


to maintain the voids in an open position for production.




The objective of the frac treatment is to uniformly fracture the entire interval


360


from top to bottom, and the methods and apparatus of the present invention overcome limitations of the prior art with respect to uniform fracturing. Specifically, ports


20


,


25


take the place of and eliminate the need for a conventional cross-over that introduces fluids into the outer annulus


30


only at the top of the interval


360


. Ports


20


,


25


essentially act as multiple cross-over points located at predetermined spaced locations along the entire length of interval


360


such that the frac fluids can exit through any one of the ports


20


,


25


as it flows through inner annulus


32


along flow path


28


. By having multiple exit points, substantially the same pressure may be applied along the formation face at the same time through each of the ports


20


,


25


versus the significant difference in pressure applied along the face at the upper and lower extents of the formation when the fluid is introduced only at the top of the interval


360


using a conventional cross-over. Therefore, the methods and apparatus of the present invention provide a more effective and uniform fracture over the entire interval


360


.




Referring again to

FIGS. 3 and 13

, when the frac treatment is complete, the well bore


300


is then gravel packed or the gravel pack may take place simultaneously with the frac treatment. In gravel packing, the internal tube


40


is placed in the circulation position shown in FIG.


13


. The gravel pack slurry of carrier fluid mixed with particulate material, typically graded sand commonly referred to as gravel, is injected down the same flow path described for the initial frac fluid. The slurry is pumped down work string


328


, through cross-over


330


and along path


28


in inner annulus


32


. The slurry passes around and through diverters


24


out ports


20


,


25


because the inner annulus


32


is sealed off by the bottom


68


of the service assembly.




Some of the carrier fluid in the slurry leaks off through the perforations


318


into the unconsolidated zone


312


of interval


360


while the remainder, i.e, the returns


44


, flow back through screen assembly


12


into medial annulus


34


and down through vertical bores


42


in sleeves


22


to the lower end of the internal tube


40


. As shown in

FIG. 13

, when returns


44


reach the bottom of internal tube


40


, they flow through open ports


82


in the receptacle assembly


74


aligned with open ports


45


in the stinger assembly


76


of valve assembly


80


allowing flow to continue upwardly through flowbore


41


along path


86


to the surface.




As the flow of the slurry slows and the carrier fluid leaks off, the gravel or solids, settles out and separates from the carrier fluid. The gravel begins to pack as it becomes dehydrated due to the leak off of the fluids. Typically the gravel may initially accumulate at the bottom of the wellbore


300


and then upwardly in the outer annulus


30


. With the multiple exit ports


20


,


25


, gravel packing may occur along the entire interval


360


simultaneously.




The building of nodes is one of the primary methods of gravel packing the borehole. However, if the nodes form prematurely and build bridges across the outer annulus


30


, voids can be formed in the gravel pack that are undesirable. Thus, if a node does begin to build prematurely, it is important that an alternative flow path past the node be provided such that any void beneath a bridge can be gravel packed from underneath the bridge so as to fill the void and achieve a uniform gravel pack throughout the annulus.




Diverters


24


are designed to prevent bridges from forming across and around inner annulus


32


inside of service assembly outer tube


26


. As shown in

FIG. 12A

, when the slurry passes through ports


20


,


25


, gravel will be deposited in and around perforations


318


, into annulus


30


and back to ports


20


,


25


, thereby promoting gravel buildup and the formation of a node


58


around port


20


. As shown in

FIG. 12A and 9B

, when node


58


grows and engages diverter


24


at


60


, the radial growth of node


58


is stopped.

FIG. 12B

shows a cross-sectional view taken at


12


B-


12


B of the diverter of

FIG. 12A

with node


58


formed. Therefore, when a bridge


58


is created and the gravel extends into diverter


24


at


60


, the diverter


24


stops the gravel from moving radially and annularly between the service assembly outer tube


26


and internal tube


40


. The diverter


24


, therefore, is designed to provide a barrier and stop the formation of a bridge that would block flow through the outer tube


26


.




As shown in

FIGS. 3

,


9


A, and


9


B, the diverters


24


and ports


20


,


25


provide a plurality of alternative flow paths to the gravel slurry flowing between the internal tube


40


and outer tube


26


. The slurry has two possible flow paths as it moves through inner annulus


32


. It can either pass into diverter


24


along flow path


28


and through exit ports


25


,


20


into outer annulus


30


, or it can bypass around the outside of diverter


24


along flow path


62


and continue downwardly through outer tube


26


to another set of aligned ports


25


,


20


. Once a bridge


58


is created, then flow will just be forced down another path


62


. Therefore, as nodes build, they may form bridges across outer annulus


30


at certain perforations


318


. However, as shown in

FIGS. 12A and 9B

, due to the plurality of alternative flow paths


62


through inner annulus


32


, if one of the exit ports


20


,


25


becomes blocked by a bridge


58


reaching diverter


24


at


60


, alternative flow paths


62


allow the gravel slurry to bypass diverter


24


and flow to another exit port


20


,


25


located at a point beneath the bridge so as to fill the void with gravel. Thus, even if a bridge forms in outer annulus


30


, flow paths


62


provide access to ports


20


,


25


below the bridge to fill and complete the gravel pack in outer annulus


30


. Thus, the present invention achieves the objective of providing a continuous gravel pack throughout outer annulus


30


such that and there are no voids in the gravel pack upon completion of the operation.




Referring again to

FIGS. 3 and 15

, after the particulate material has been packed in outer annulus


30


around screen assembly


12


, any gravel and/or proppant in inner annulus


32


will be removed. Such gravel/proppant can cause equipment abrasion problems or cause tools to get stuck downhole, preventing them from being removed from the wellbore. Prior to reverse circulating the inner annulus


32


, it is necessary to close ports


20


,


25


, otherwise the circulation fluids would flow into outer annulus


30


. Thus, the flow-control service assembly


27


is raised a sufficient distance to close ports


20


. In raising outer tube


26


, the actuator member


48


, which is biased outwardly, engages a mating profile on the internal surface of sleeve


22


and moves it upwardly on the connector sub


50


of screen assembly


12


. As actuator members


48


pull sleeves


22


upward, another shoulder inside sleeve


22


contacts actuator member


48


and forces it to retract and release sleeve


22


once sleeve


22


is in the closed position. When the sleeve reaches the closed position, it latches into place over ports


20


,


25


. Although the latching mechanism is capable of a number of different constructions, one embodiment comprises a spring biased latching member that expands and engages an internal profile in sleeve


22


thereby latching sleeve


22


in the closed position to keep ports


20


,


25


closed. As shown in

FIG. 4B

, seals


46


seal between sleeve


22


and sub


50


around ports


20


when sleeve


22


is in the closed position.




Referring now to

FIG. 15

, to reverse circulate inner annulus


32


to remove any gravel, the valve assembly


80


is moved to the reverse flow position. Internal tube


40


is raised within outer tube


26


to bring stinger assembly ports


45


to a position above the closed-off bottom


68


of service assembly


26


. Fluids free of solids can now be reverse circulated down work string


328


, down wash pipe


40


along path


85


and out ports


45


to push any gravel that might have deposited in annulus


32


up to the surface with the fluids along path


87


. The removal of the gravel and proppant allows the retrieval of the flow-control service assembly


27


.




It is preferable to maximize the aggregate flow area through screen assembly


12


so as to maximize the flow of well fluids produced through screen assembly


12


from the production zone. Because the service assembly outer tube


26


and internal tube


40


are removable from the wellbore after gravel packing is complete, the flow area for production can be maximized and the flow-control service assembly


27


with outer tube


26


and internal tube


40


can be used again rather than becoming part of the permanent downhole assembly. Thus, the present invention achieves the objective of uniform gravel packing using an apparatus that is removable from the wellbore upon completion so as not to limit the size of the production area.




After the gravel pack is complete in wellbore


300


as described above, the well is returned to production, and the pack of particulate material filters out and prevents the migration of formation fines and sand with fluids produced into the wellbore from the unconsolidated subterranean zone


312


.




The particulate material utilized in accordance with the present invention is preferably graded sand but may be a man-made material having a similar mesh size. The particulate material is sized based on a knowledge of the size of the formation fines and sand in the unconsolidated zone to prevent the formation fines and sand from passing through the gravel pack, i.e., the formed permeable sand pack. The graded sand generally has a particle size in the range of from about 10 to about 70 mesh, U.S. Sieve Series. Preferred sand particle size distribution ranges are one or more of 10-20 mesh, 20-40 mesh, 40-60 mesh or 50-70 mesh, depending on the particle size and distribution of the formation fines and sand to be screened out by the graded sand.




The particulate material carrier fluid can be any of the various viscous carrier liquids or fracturing fluids utilized heretofore including gelled water, oil base liquids, foams or emulsions or it may be a non-viscous fluid such as water, brine or an oil based liquid. The foams utilized have generally been comprised of water based liquids containing one or more foaming agents foamed with a gas such as nitrogen. The emulsions have been formed with two or more immiscible liquids. A particularly useful emulsion is comprised of a water-based liquid and a liquefied normally gaseous fluid such as carbon dioxide. Upon pressure release, the liquefied gaseous fluid vaporizes and rapidly flows out of the formation. The liquid utilized is preferably a non-viscous or low viscosity fluid that can also be used to fracture the unconsolidated subterranean zone if desired.




The most common carrier liquid/fracturing fluid utilized heretofore, which is also preferred for use in accordance with this invention, is comprised of an aqueous liquid such as fresh water or salt water combined with a gelling agent for increasing the viscosity of the liquid. The increased viscosity reduces fluid loss and allows the carrier liquid to transport significant concentrations of particulate material into the subterranean zone to be completed. A variety of gelling agents are described in U.S. patent application Ser. No. 09/361,714 filed on Jul. 27, 1999, hereby incorporated herein by reference, which is a continuation-in-part of application Ser. No. 09/084,906 filed on May 26, 1998, hereby incorporated herein by reference, which is a continuation-in-part of application Ser. No. 08/951,936 filed on Oct. 16, 1997, now U.S. Pat. No. 6,003,600, hereby incorporated herein by reference. See also European patent application EP 0 909 874 A2 published Apr. 21, 1999 and European patent application EP 0 909 875 A2published Apr. 21, 1999, both hereby incorporated herein by reference.




Thus, it can be seen that the methods and apparatus of the present invention provide effective means for fracturing and uniformly gravel packing wells in unconsolidated subterranean zones. The present invention can achieve more uniform fracturing along the entire interval from top to bottom by injecting frac fluids into the formation at fairly uniform pressures through a plurality of exit ports extending along the length of the service assembly. These exit ports also provide alternative flow paths to inject gravel along the screen assembly, especially to fill voids beneath bridges that form in the gravel pack. Diverters mounted internally of these ports form a barrier to prevent the gravel from bridging across the entire inner annulus between the service assembly outer tube and internal tube, thus allowing flow to bypass the diverter and exit through another open port below. The present invention is especially beneficial for use in high production rate wells because the apparatus of the present invention is disposed within the screen assembly, so it does not limit the internal diameter of the screen assembly, i.e. the production area. The apparatus of the present invention is also removable from the wellbore after frac treatment and gravel packing are complete thereby maximizing the well production capacity of the screen assembly and reducing costs by not becoming part of the permanent downhole assembly.




While preferred embodiments of this invention have been shown and described, modifications thereof can be made by one skilled in the art without departing from the spirit or teaching of this invention. In particular, various embodiments of the present invention provide a number of different constructions. The embodiments described herein are exemplary only and are not limiting. Many variations of the system in which the apparatus may be used are also possible and within the scope of the invention. Namely, the present invention may be used in conjunction with any type of screen assembly such that the particular configuration of screen assembly illustrated and described herein is meant merely to illustrate the function of the present invention as an alternative path or flow diversion apparatus. Accordingly, the scope of protection is not limited to the embodiments described herein, but only by the claims that follow, the scope of which shall include all equivalents of the subject matter of the claims.



Claims
  • 1. A method of flowing fluids into an unconsolidated subterranean zone penetrated by a wellbore comprising:disposing a length of screen assembly in the wellbore adjacent the unconsolidated subterranean zone, the screen assembly including a plurality of screens; disposing apertures in the screen assembly along said length at predetermined intervals; disposing a flow-control member within said screen assembly to direct fluid flow through the apertures and not through the screens; passing frac fluids through the flow-control member, through the apertures and into the unconsolidated subterranean zone.
  • 2. The method of claim 1, further including applying a substantially uniform fluid pressure through the apertures along the length of the screen assembly.
  • 3. The method of claim 1 further including creating fractures uniformly along the unconsolidated subterranean zone from top to bottom.
  • 4. The method of claim 1 wherein the flow-control member includes inner and outer members forming a flowbore within the inner member, an annular flow area between the inner and outer members, and ports in the outer member communicating with the apertures in the screen assembly, the outer member forming an annular passageway with the screen assembly.
  • 5. The method of claim 4 further including flowing fluid into the annular flow area, through the ports and apertures, and into the formation.
  • 6. The method of claim 5 further including preventing the extent of radial build up of sand at the ports and providing an alternative flow route around the sand build up in the outer member.
  • 7. The method of claim 4 further including flowing fluids through the screens, into the annular passageway and into the flowbore of the inner member.
  • 8. The method of claim 4 further including providing a valve member controlling flow through the inner member.
  • 9. The method of claim 4 wherein the flow-control member includes internal alternative flow paths allowing particulate material to flow through or around the ports.
  • 10. The method of claim 1 further including providing closure members to close the apertures, the closure members having flow passageways allowing flow between the flow-control member and screen assembly.
  • 11. The method of claim 1 further including closing the apertures.
  • 12. The method of claim 1 further including moving the flow-control member to close the apertures.
  • 13. The method of claim 1 further including removing the flow-control member from the wellbore.
  • 14. An improved method of completing an unconsolidated subterranean zone penetrated by a wellbore having an upper and lower end comprising the steps of:placing in the lower end of the wellbore a screen assembly having open ports and an outer tubular member disposed therein having open ports that align with said screen assembly ports whereby a first annulus is formed between the screen assembly and the outer tubular member and a second annulus is formed between the screen assembly and the lower end of said wellbore; hanging an internal tubular member within said outer tubular member whereby a third annulus is formed between the internal tubular member and the outer tubular member; isolating said second annulus between the lower wellbore end and the upper wellbore end in the zone; injecting particulate material into said third annulus, through said aligned open ports, and into said second annulus; creating fractures in said subterranean zone while injecting the particulate material into the second annulus; depositing particulate material in said fractures; uniformly packing the particulate material along the screen assembly in said second annulus; closing off the internal tubular member to fluids entering from within the well; injecting particulate-free liquid through said internal tubular member into said third annulus and flowing said liquid up to the surface through said third annulus; closing said screen assembly ports; removing the outer tubular member and the internal tubular member from the wellbore; and placing the unconsolidated subterranean zone on production.
CROSS-REFERENCE TO RELATED APPLICATIONS

This is a divisional application of co-pending U.S. patent application Ser. No. 09/520,305, filed Mar. 7, 2000, hereby incorporated by reference in its entirety. This application is a continuation-in-part of application Ser. No. 09/399,674 filed on Sep. 21, 1999, now U.S. Pat. No. 6,427,775, which is a continuation-in-part of application Ser. No. 09/361,714 filed on Jul. 27, 1999, now U.S. Pat. No. 6,446,722, which is a continuation-in-part of application Ser. No. 09/084,906 filed on May 26, 1998, now U.S. Pat. No. 5,934,376, which is a continuation-in-part of application Ser. No. 08/951,936 filed on Oct. 16, 1997, now U. S. Pat. No. 6,003,600, all hereby incorporated herein by reference.

US Referenced Citations (40)
Number Name Date Kind
1305915 Mack Jun 1919 A
1341755 Minton Jun 1920 A
2207334 Reynolds et al. Jul 1940 A
2342913 Williams et al. Feb 1944 A
2344909 Williams et al. Mar 1944 A
3670817 Saucier Jun 1972 A
4042032 Anderson et al. Aug 1977 A
4070865 McLaughlin Jan 1978 A
4102395 Robinson Jul 1978 A
4428426 Davies et al. Jan 1984 A
4428436 Johnson Jan 1984 A
4474239 Colomb et al. Oct 1984 A
4829100 Murphey et al. May 1989 A
4858691 Ilfrey et al. Aug 1989 A
4945991 Jones Aug 1990 A
5058676 Fitzpatrick et al. Oct 1991 A
5082052 Jones et al. Jan 1992 A
5113935 Jones et al. May 1992 A
5128390 Murphey et al. Jul 1992 A
5161613 Jones Nov 1992 A
5161618 Jones et al. Nov 1992 A
5165476 Jones Nov 1992 A
5333688 Jones et al. Aug 1994 A
5341880 Thorstensen et al. Aug 1994 A
5417284 Jones May 1995 A
5419394 Jones May 1995 A
5435391 Jones Jul 1995 A
5476143 Sparlin et al. Dec 1995 A
5515915 Jones et al. May 1996 A
5560427 Jones Oct 1996 A
5588487 Bryant Dec 1996 A
5597040 Stout et al. Jan 1997 A
5609207 Dewprashad et al. Mar 1997 A
5669445 Edwards Sep 1997 A
5890533 Jones Apr 1999 A
5921318 Ross Jul 1999 A
5934376 Nguyen et al. Aug 1999 A
6003600 Nguyen et al. Dec 1999 A
6059032 Jones May 2000 A
6220345 Jones et al. Apr 2001 B1
Foreign Referenced Citations (13)
Number Date Country
0909874 Apr 1999 EP
0909875 Apr 1999 EP
2316967 Mar 1998 GB
2317630 Apr 1998 GB
0421822 May 1990 WO
WO9304267 Mar 1993 WO
WO9322536 Nov 1993 WO
WO9416194 Jul 1994 WO
WO9514844 Jun 1995 WO
WO9533915 Dec 1995 WO
WO0061913 Oct 2000 WO
WO0114691 Mar 2001 WO
WO0144619 Jun 2001 WO
Non-Patent Literature Citations (2)
Entry
Schlumberger Dowell; Alternate Path+Services, Feb. 1997; (p. 9).
L. Jones; Petroleum Engineer International; Fracpacking Horizontal Wells Allows Ultra-High Rates From Mediocre Formation; Jul. 1999; (pp. 37-40).
Continuation in Parts (4)
Number Date Country
Parent 09/399674 Sep 1999 US
Child 09/520305 US
Parent 09/361714 Jul 1999 US
Child 09/399674 US
Parent 09/084906 May 1998 US
Child 09/361714 US
Parent 08/951936 Oct 1997 US
Child 09/084906 US