Claims
- 1. An improved start-up procedure for a steam producing boiler, which boiler comprises, in part, an economizer section, an evaporator section, a superheater section and a water storage drum located between and connected to said evaporator and superheater sections and wherein said improved start-up procedure comprises the steps of:
- (a) increasing the pressure in said drum by providing an external pressure source to the drum, said increased drum pressure substantially greater than atmospheric pressure;
- (b) applying heat to said evaporator and superheater sections;
- (c) maintaining said drum in communication with said external pressure source as the liquid temperature in said drum approaches its normal operating temperatures, and;
- (d) obtaining steady state operation of said boiler, producing steam of desired quality for subsequent process steps.
- 2. The improved procedure of claim 1 wherein step a precedes step b.
- 3. The improved procedure of claim 1 wherein step b precedes step a.
- 4. The improved procedure of claim 1 wherein said external pressure source comprises means for providing high pressure steam.
- 5. The improved procedure of claim 1 wherein said external pressure source comprises means for providing non-condensable, compressed gases
- 6. The improved procedure of claim 1 wherein said boiler additionally comprises a combustion chamber and air compressor, and further wherein said external pressure source comprises compressed gases exhausted from said air compressor.
Parent Case Info
This is a continuation divisional of application Ser. No. 06/752,570, filed July 8,1985 now U.S. Pat. No. 4,735,043.
US Referenced Citations (2)
Number |
Name |
Date |
Kind |
3508526 |
Michel |
Apr 1970 |
|
4487166 |
Haller et al. |
Dec 1984 |
|
Divisions (1)
|
Number |
Date |
Country |
Parent |
752570 |
Jul 1985 |
|