Copy--8 pages, dated Nov. 19, 1991 document entitled High Pressure Valve Positioning Specification--Revision 0. |
Copy--2 pages, dated Aug. 1973--document. |
Copy--6 pages--entitled A Method for Correcting Turbine-Generator Sudden Load Loss by Audrey J. Smith and George Platt. |
Copy--14 pages document entitled Improved Reliability of Bulk Power Supply by Fast Load Control by R.H. Park. |
Copy--10 page document entitled Fast Valving as an Aid to Power System Transient Stabiligy and Prompt Presynchronization and Rapid Reload After Full Load Rejection. |
Copy--8 pages of a Conference Paper entitled Some Model Experiments in Fast Valving to Improve Transient Stability by A.C. Sullivan and F.J. Evans. |
Copy--8 page document (dated 1980) and entitled Turbine Overspeed Control Behaviour by G.P. Schatzmann--BBC Brown Bovert Company. |
Copy--9 page document entitled Fast Turbine Valving by Robert H. Park, Fellow IEEE, Member ASME--Brewster, Massachusetts. |
Copy, 8 pages dated 1980--entitled Steam Turbine Overspeed Control and Behavior During System Disturbances--T.D. Younkins, Member IEEE and L.H. Johnson. |
Copy--60 pages--booklet dated Mar., 1991 entitled Controlling and Protecting Centrifugal and Axial Compressors Using Series 3 Controllers by Compressor Controls Corporation. |
Copy--211 page booklet dated Feb. 17, 1997 entitled Series 3 Plus Antisurge Controller--by Compressor Controls Corporation. |