Claims
- 1. A method for operating a direct current arc furnace comprising the steps of:
- operating the direct current arc furnace with an old vessel to melt metal;
- terminating the operation of the furnace;
- disconnecting the old vessel of the furnace from the furnace;
- removing the old vessel having a bottom electrode from the furnace;
- placing a new vessel having a bottom electrode with the furnace;
- connecting the new vessel with the furnace;
- turn-on the operation of the furnace
- operating the furnace with the new vessel to melt metal.
- 2. A method for operating a direct current arc furnace comprising the steps of:
- operating the direct current arc furnace with a vessel having an old bottom furnace shell to melt metal;
- terminating the operation of the furnace;
- separating a furnace cover of the vessel from the old furnace shell having a bottom electrode;
- disconnecting the old furnace shell from the furnace;
- removing the old furnace shell from the furnace;
- placing a new bottom furnace shell having a bottom electrode with the furnace;
- connecting the new furnace shell with the furnace;
- putting the furnace cover on the new furnace shell;
- turn-on the operation of the furnace
- operating the furnace with the new furnace shell to melt metal.
- 3. A method as described in claim 2 including after the removing step, there is the step of repairing the old furnace shell.
- 4. A method as described in claim 3 including after the terminating step, there is the step of draining metal from the old furnace shell.
- 5. A method as described in claim 4 wherein the disconnecting step includes the step of disconnecting all water, air, gas, oxygen and power connections from the old furnace shell.
- 6. A method as described in claim 5 wherein the disconnecting step includes the step of removing all hold down wedges and platforms from the old furnace shell.
- 7. A method as described in claim 6 wherein the removing step includes the steps of lifting the furnace shell with a crane off of a tilt platform of the furnace; moving the crane with the old furnace shell to a push-up area; and depositing the old furnace shell at the push-up area.
- 8. A method as described in claim 7 wherein the placing step includes the steps of lifting the new furnace shell with a second crane; moving the new furnace shell with the second crane to the furnace; and placing the new furnace shell on the tilt platform of the furnace.
- 9. A method as described in claim 8 wherein the connecting step includes the step of reconnecting all water, air, gas, oxygen and power connections with the new furnace shell.
- 10. A method as described in claim 9 including after the reconnecting step, there is the step of re-installing all hold down wedges and platforms with the new furnace shell.
- 11. A method as described in claim 10 wherein the repairing step includes the step of separating the bottom electrode of the old furnace shell from the old furnace shell.
- 12. A method as described in claim 11 wherein after the separating the bottom electrode step, there is the step of mounting another bottom electrode to the old furnace shell to fix the old furnace shell.
CROSS-REFERENCE
This application is related to contemporaneously filed U.S. patent application Ser. No. 08/806,848 titled "A Method and Apparatus for Heating Materials" by Hiroshi Shimizu, Joseph L. Hake, and Richard L. Cook, having attorney docket number NKK-1, incorporated by reference herein, and U.S. patent application Ser. No. 08/807,803 titled "A Direct Current Arc Furnace and a Method for Operating the Arc Furnace" by Hiroshi Shimizu, Joseph L. Hake, and Richard L. Cook, having attorney docket number NKK-3, incorporated by reference herein.