Claims
- 1. A method for placing cementitious material into a foundation excavation using an elongate boom mounted on a mobile transport vehicle, comprising the steps of:
- vertically pivoting, longitudinally extending and horizontally pivoting an elongate boom mounted on a mobile transport vehicle and supporting a flexible hose at the end of the boom to place the flexible hose over an excavation pour point at a desired location remote from the mobile transport vehicle;
- unreeling the flexible hose from the end of the boom substantially vertically down into the excavation in the earth to a location where cementitious material is to be placed;
- pumping cementitious material through the hose into the excavation;
- reeling the flexible hose upwardly from the excavation as the cementitious material fills the excavation.
- 2. The method as set forth in claim 1 including the step of unreeling the hose from a motor driven reel.
- 3. The method as set forth in claim 1 including the step of maintaining the hose end below the top of the cementitious material in the excavation as it is filled with the cementitious material.
- 4. The method as set forth in claim 1 including the step of:
- extending the flexible hose into a fluid filled excavation and displacing the fluid in the excavation with the cementitious material.
- 5. The method as in claim 1 including the step of attaching weight means on the end of the hose for lowering the hose in a vertical path.
Parent Case Info
This application is a continuation of application Ser. No. 07/672,366, filed Mar. 20, 1991, now abandoned, which is a division of Ser. No. 07/379,429, filed Jul. 13, 1989, now U.S. Pat. No. 5,026,214.
US Referenced Citations (12)
Foreign Referenced Citations (2)
Number |
Date |
Country |
470806 |
Oct 1914 |
FRX |
33675 |
Oct 1912 |
SEX |
Divisions (1)
|
Number |
Date |
Country |
Parent |
379429 |
Jul 1989 |
|
Continuations (1)
|
Number |
Date |
Country |
Parent |
672366 |
Mar 1991 |
|