Claims
- 1. An apparatus for producing hydrocarbons from first and second production zones intersected by a well, the apparatus comprising;a first packer positioned in the well above said first production zone; a second packer positioned in the well between said first and second production zones, wherein said first packer comprises a dual packer; a first flow conduit for communicating a first production fluid from said first production zone between said first and second packers into an interior of said well above said first packer; a second flow conduit extending from said first packer to said second packer for communicating a second production fluid from said second zone below said second packer into said interior of said well above said first packer wherein said first and second production fluids are commingled in said interior of said well above said first packer; and a pumping system lowered into said well on a production tubing, wherein the commingled first and second production fluids are communicated into the production tubing and urged upwardly therein.
- 2. The apparatus of claim 1, said second packer having an opening therein, said first packer having first and second openings therein, the second flow conduit extending from said opening in said lower packer to one of said first and second openings in said first packer.
- 3. The apparatus of claim 2, further comprising a check valve disposed in said second flow conduit for allowing upward fluid flow upwardly through said second flow conduit and for preventing downward flow therethrough.
- 4. The apparatus of claim 1, wherein said first flow conduit is disposed in one of a first and a second opening in said first packer and extends upwardly therefrom into said well above said packer to communicate fluid from said first production zone into said interior of said well above said first packer.
- 5. The apparatus of claim 4 further comprising:a flow meter connected in said first flow conduit for measuring the amount of said first production fluid produced from said first production zone, wherein said fluid from said first production zone is discharged into said interior of said well above said flow meter.
- 6. The apparatus of claim 5, said first flow conduit having a check valve therein for allowing fluid flow upwardly into said interior of said well above said first packer and for preventing flow downwardly through said first flow conduit.
- 7. The apparatus of claim 6, further comprising a check valve connected in said second flow conduit for allowing flow upwardly therethrough into said interior of said well above said packer and for preventing downward flow through said second flow conduit.
- 8. The apparatus of claim 1, further comprising:means for determining the amount of fluid produced from each of said first and second production zones.
- 9. The apparatus of claim 8, said means for determining comprising a flow meter operably associated with one of said first or second flow conduits for measuring the amount of fluid produced therethrough.
- 10. The apparatus of claim 1 wherein said pumping system comprises,a submersible pump connected to said production tubing; an intake for communicating fluid from said well into said pump; and a motor for driving said pump.
- 11. Apparatus for producing fluid from a plurality of hydrocarbon producing formations intersected by a well, the apparatus comprising:a packer positioned in said well to separate said plurality of producing formations into upper and lower production zones, the upper and lower production zones each comprising at least one producing formation; a production tubing lowered into said well, said production tubing splitting into first and second production branches at a lower end thereof; a first pumping system connected to said first production branch for communicating fluid from said upper production zone into said first production branch; and a second pumping system pump for communicating fluid from said lower production zone into said second production branch, wherein fluid from said first production branch and said second production branch are combined in said production tubing and delivered upwardly therein, the first and second pumping systems comprising: an electric submersible pump; a fluid intake for said pump; a motor connected to said pump; and a seal section disposed between said motor and said pump, wherein a shroud having an upper end and a lower end is disposed about said second pumping system, said upper end of said shroud being positioned above said intake of said second pumping system, said lower end of said shroud being located such that fluid from said lower production zone flows around said lower end of said shroud and upwardly past said motor of said second pumping system prior to reaching said intake of said second pumping system.
- 12. The apparatus of claim 11, wherein one of said first or second production branches has a flow meter connected therein for measuring a flow of fluid through said one of said first or second production branches.
- 13. The apparatus of claim 11, wherein said second pumping system is positioned below said packer.
- 14. The apparatus of claim 11, wherein both of said first and second pumping systems are positioned above said packer.
- 15. An apparatus for producing hydrocarbons from a well, wherein the well intersects a plurality of producing formations, the apparatus comprising:a packer positioned in said well for separating said formations into an upper production zone and a lower production zone, the upper and lower production zones each having at least one producing formation; a first pumping system disposed in said well for pumping fluid from said upper production zone upwardly in said well; and a second pumping system disposed in said well for pumping fluid from said lower production zone upwardly in said well, wherein said first and second pumping systems are positioned in said well above said packer; wherein said first pumping system is connected to a first production tubing lowered into said well from a wellhead and said second pumping system is connected to a second production tubing lowered into said well from said wellhead.
- 16. A method of producing fluid from a plurality of producing formations intersected by a well, the method comprising:(a) separating the plurality of formations into upper and lower production zones with a lower packer, each zone having at least one producing formation; (b) placing an upper packer in said well above said upper production zone, the upper packer comprising a dual packer; (c) connecting the upper packer to the lower packer with a fluid flow conduit; (d) communicating fluid from said lower production zone upwardly through said fluid flow conduit and into the well above the upper packer; (e) communicating fluid from said upper production zone upwardly in said well past said upper packer; (f) combining said fluid from said upper production zone and said lower production zones in said well to form a single fluid stream; and (g) communicating said single fluid stream upwardly in said well.
- 17. The method of claim 16, further comprising:(h) determining the amount of fluid produced from each of said upper and lower production zones.
- 18. The method of claim 16, further comprising:discharging said fluid from said upper production zone into an interior of said well above said packer prior to said combining step.
- 19. A method of determining the amount of fluid produced from different production zones in a well intersecting a plurality of producing formations, the method comprising:(a) lowering a single pumping system into said well on a production tubing; (b) separating the well into upper and lower production zones with a packer, each zone having at least one producing formation; (c) communicating fluid from said lower production zone upwardly in said well past said packer; (d) combining said fluid from said upper and lower production zones into a single stream; (e) communicating said single stream upwardly in said well wherein said single pumping system draws fluid from both of said first and second production zones upwardly in said well and communicates said single stream upwardly in said production tubing; and (f) prior to said combining step, determining the amount of fluid produced from one of said upper and lower production zones.
- 20. The method of claim 19 further comprising:communicating fluid from said first production zone upwardly in said well past said packer in a first flow conduit prior to said combining step, wherein step (c) comprises communicating fluid from said second production zone upwardly in a second flow conduit, said determining step comprising placing a flow meter in one of said first or second flow conduits to measure a rate of flow therethrough.
- 21. The method of claim 20, further comprising discharging the fluid from said first and second flow conduits into an interior of said well above said packer prior to said combining step.
- 22. Apparatus for producing fluid from a plurality of hydrocarbon producing formations intersected by a well, the apparatus comprising:a packer positioned in said well to separate said plurality of producing formations into upper and lower production zones, the upper and lower production zones each comprising at least one producing formation; a production tubing lowered into said well, said production tubing splitting into first and second production branches at a lower end thereof; a first pumping system connected to said first production branch for communicating fluid from said upper production zone into said first production branch; a second pumping system pump for communicating fluid from said lower production zone into said second production branch, wherein fluid from said first production branch and said second production branch are combined in said production tubing and delivered upwardly therein, the first and second pumping systems comprising: an electric submersible pump; a fluid intake for said pump, wherein both of said first and second pumping systems are positioned above said packer; a shroud disposed about said second pumping system; and a tailpipe connected to said shroud, said tailpipe being received in an opening in said packer, wherein fluid from said lower production zone passes through said tailpipe into said shroud and is communicated from said shroud by said second pumping system into said second production branch.
- 23. The apparatus of claim 22, wherein one of said first or second production branches has a flow meter therein for measuring the amount of fluid produced from said lower production zones.
- 24. An apparatus for producing hydrocarbons from a well, wherein the well intersects a plurality of producing formations, the apparatus comprising:a packer positioned in said well for separating said formations into an upper production zone and a lower production zone, the upper and lower production zones each having at least one producing formation; a first pumping system disposed in said well for pumping fluid from said upper production zone upwardly in said well; a second pumping system disposed in said well for pumping fluid from said lower production zone upwardly in said well, wherein said first and second pumping systems are positioned in said well above said packer; a shroud disposed about said second pumping system, said second pumping system and said shroud defining an annulus therebetween; and a tailpipe extending downward from said shroud to said packer, wherein fluid from said lower production zone passes through said tailpipe into said annulus, and wherein said second pumping system pumps said fluid in said annulus upwardly in a flow channel connected thereto.
- 25. The apparatus of claim 24 wherein said fluid communicated from both of said first and second pumping systems is displaced upwardly in a single production tubing.
- 26. An apparatus for producing hydrocarbons from a well, wherein the well intersects a plurality of producing formations, the apparatus comprising:a packer positioned in said well for separating said formations into an upper production zone and a lower production zone, the upper and lower production zones each having at least one producing formation; a first pumping system disposed in said well for pumping fluid from said upper production zone upwardly in said well; a second pumping system disposed in said well for pumping fluid from said lower production zone upwardly in said well, wherein said first and second pumping systems are positioned in said well above said packer, and wherein flow from both of the first and second pumping systems is displaced upwardly in a single production tubing, the single production tubing having a first production branch connected to said first pumping system and a second production branch connected to said second pumping system so that fluid from both of said first and second production branches is communicated upwardly in said single production tubing.
Parent Case Info
This application claims the benefit of U.S. Provisional Application No. 60/233,951 filed Sep. 20, 2000.
US Referenced Citations (9)
Non-Patent Literature Citations (1)
Entry |
Yassewr Bangash, Gregory M. Wilson and Max T. Boone, An Encapsulated system designed for severe. CO2 corrosive envrionment in Exxon-Mobil's Postle Field, 38 presented athe 2000 SIE Annual Technical. Conference and Exhibition held in Houston, TX, Apr. 2000. |
Provisional Applications (1)
|
Number |
Date |
Country |
|
60/233951 |
Sep 2000 |
US |