- 1. A method of drilling a shallow-water offshore well from a drilling barge and subsequently reinforcing an unsupported columnar well installation to resist the effect of wind and wave forces encountered by said well installation, said method comprising the steps of:
- (a) installing a well conductor in an ocean floor at a shallow water location and anchoring it to the ocean floor,
- (b) drilling the well through said well conductor and closing the top of the well with a production wellhead,
- (c) providing a first pile guide template frame substantially polygonal in plan view comprising at least two spaced-apart vertical pile guides connected together by laterally-extending support members with additional laterally-extending support members arranged to extend between and be connected at one end to each of the pile guides and at the other end to a well conductor guide, with the pile guides being at a selected distance from the well conductor guide,
- (d) transporting the first pile guide template frame to the offshore unsupported well installation,
- (e) positioning said first pile guide template frame in vertical sliding arrangement on said well conductor below said production wellhead,
- (f) lowering said first pile guide template frame to the ocean floor,
- (g) providing a second pile guide template frame substantially polygonal in plan view comprising at least two spaced-apart vertical pile guides connected together by laterally-extending support members with additional laterally-extending support members arranged to extend between and be connected at one end to each of the pile guides and at the other end to the well conductor when positioned thereagainst, with the pile guides being at a selected distance from the well conductor,
- (h) transporting the second pile guide template frame to the offshore unsupported well installation,
- (i) positioning said second pile guide template frame in a manner such that the other ends of the additional laterally-extending support members are operatively positioned adjacent a wall of said well conductor, said position being such that at least said other ends of said support members at the top of the second pile guide template are above the surface of the water,
- (j) vertically aligning the pile guides of the second pile guide template frame over the pile guides of said first pile guide template frame on the ocean floor in spaced relationship therewith,
- (k) lowering a pile through each of said vertically-aligned pile guides of said first and second pile guide template frames and driving said pile into the ocean floor,
- (l) fixedly connecting each pile to its surrounding spaced-apart pile guides, and
- (m) operatively connecting at least said other ends of said laterally-extending support members at the top of the second pile guide template frame and said well conductor guide of said first pile guide template frame to the well conductor, whereby said spaced apart first and second pile guide template frames form interconnecting reinforcing structures between the piles and the well conductor to resist the effect of wind and wave forces encountered by said well conductor.
- 2. The method of claim 1 including the steps of providing a work platform at the base of said wellhead, and
- fixedly securing said work platform to at least said well conductor.
- 3. The method of claim 2 including the steps of providing a helicopter pad and a depending support frame, and
- fixedly securing said helicopter pad support frame to at least said work platform.
- 4. The method of claim 1 wherein the operation carried out in step (1) is accomplished by providing a sliding connection permitting limited movement between the well conductor and the second reinforcing template frame.
- 5. The method of claim 1 wherein in step (i) the second pile guide template frame is positioned by hanging it from a crane of a work barge positioned nearby.
- 6. The method of claim 1 including the steps of:
- providing a work barge having a pair of positionable hoisting cranes thereon, and
- positioning the work barge adjacent the well conductor and within the working area of the cranes.
- 7. The method of claim 6 wherein step (i) of claim 1 is carried out by temporarily connecting the second pile guide template frame to a hook of the first crane of the pair of cranes and moving the first crane to suspend the second pile guide template frame against the well conductor during the pile driving operation of step (j).
- 8. The method of claim 6 including the step of utilizing the second crane of the pair of cranes on the work barge to suspend a length of the pile and a pile driver operatively connected thereto above a set of vertically-aligned spaced-apart pile guides of the first and second pile guide template frames prior to driving the pile through the pile guides.
- 9. The method of claim 1 wherein the step of connecting the first and second pile guide template frames to the well conductor is carried out after the pile driving operation.
- 10. The method of claim 9 wherein the step of connecting the second pile guide template frame to the well conductor is carried out by welding.
- 11. The method of claim 1 wherein the step of connecting the second pile guide template frame to the well conductor is carried out before the pile driving operation of step (j) of claim 1.
- 12. The method of claim 1 wherein connecting piles to their surrounding pile guides comprises grouting the piles within their pile guides.
- 13. The method of claim 12 wherein connecting the well conductor to its surrounding well conductor guide comprises grouting the well conductor within the well conductor guide.
- 14. A well installation into an ocean floor for isolated use offshore, said well installation comprising:
- (a) an unsupported well conductor installed in the ocean floor and having a well drilled therethrough and closed at the upper end above the wave height by a production wellhead assembly,
- (b) a first pile guide template frame positioned on the ocean floor and comprising a guide sleeve surrounding said well conductor and laterally-extending support members fixedly secured to said guide sleeve and extending outwardly to at least one side of said well conductor,
- (c) said first pile guide template frame having at a selected distance from the well conductor at least two spaced-apart open-ended and vertically-positioned tubular rigid pile sleeves at least 10 feet in height and extending at least 10 feet upwardly from the ocean floor,
- (d) A second pile guide template frame positioned on the outside of said well conductor adjacent the surface of the water and comprising laterally-extending support members fixedly secured at least above the water line to the outer surface of the well conductor below the wellhead assembly and extending outwardly to at least one side of said well conductor,
- (e) said second pile guide template frame having at a selected distance from the well conductor, at least two spaced-apart open-ended and vertically-positioned tubular rigid pile sleeves at least 10 feet in height and extending at least 10 feet upwardly from the water surface, said pile sleeves being in vertical alignment with the pile sleeves of said first frame,
- (f) a large-diameter pile extending through each of at least two of the spaced-apart pile sleeves of said spaced apart first and second guide frames with the lower end of each pile being anchored in the ocean floor, and
- (g) means for fixedly securing each pile within its surrounding sleeve.
- 15. The apparatus of claim 14 wherein the means (g) comprises
- cement grout filling the annular spaces formed between each pile and the surrounding pile sleeves.
- 16. The apparatus of claim 14 wherein the pile sleeves of said first pile guide template frame extend upwardly from the ocean floor from 5 to 40 feet.
- 17. The apparatus of claim 14 including a work platform position adjacent said wellhead assembly and support means for fixedly securing said work platform to at least the well conductor.
- 18. The apparatus of claim 14 including a helicopter pad positioned over said wellhead assembly, and support means for fixedly securing said helicopter pad to at least the well conductor.
- 19. The apparatus of claim 14 wherein the laterally-extending support members of said first and second pile guide template frames together with said pile sleeves and well conductor, when taken in plan view, are arranged in a polygonal configuration with the pile sleeves and the well conductor positioned on the periphery thereof.
- 20. The apparatus of claim 17 further including a second well conductor connected to the first and second pile guide template frames and anchored in the ocean floor.
- 21. The apparatus of claim 20 wherein said second well conductor is positioned on the periphery of the polygonal configured first and second pile guide template frames.
- 22. The apparatus of claim 20 wherein said second well conductor is positioned within the periphery of said polygonal configured first and second pile guide template frames and including additional lateral support members connecting the second well conductor to the first and second pile guide template frames.
- 23. The apparatus of claim 20 wherein said second well conductor is positioned outside the periphery of said polygonal configured frame and including additional lateral support members connecting the second well conductor to the frame.
- 24. A method of drilling a shallow-water offshore well from a drilling barge and subsequently reinforcing an unsupported columnar well installation to resist the effect of wind and wave forces encountered by said well installation, said method comprising the steps of:
- (a) installing a well conductor in the ocean floor at a shallow water location and anchoring it to the ocean floor,
- (b) drilling a well through said well conductor and closing the top of the well with a production wellhead,
- (c) providing a first pile guide template frame substantially polygonal in plan view comprising at least two spaced-apart vertical pile guides connected together by laterally-extending support members with additional laterally-extending support members arranged to extend between and be connected at one end to each of the pile guides and at the other end to a well conductor guide, with the pile guides being at a selected distance from the well conductor guide,
- (d) transporting the first pile guide template frame to the offshore unsupported well installation,
- (e) positioning said first pile guide template frame in vertical sliding arrangement on said well conductor below said wellhead,
- (f) lowering said first pile guide template frame to the ocean floor,
- (g) lowering a pile through each of at least two of said vertical pile guides of said first pile guide template frame and driving said pile into the ocean floor with the upper end of the pile extending above the water surface,
- (h) providing a second pile guide template frame substantially polygonal in plan view comprising at least two spaced-apart vertical pile guides connected together by laterally-extending support members with additional laterally-extending support members arranged to extend between and be connected at one end to each of the pile guides and at the other end to the well conductor when positioned thereagainst, with the pile guides being at a selected distance from the well conductor,
- (i) transporting the second pile guide template frame to the offshore unsupported well conductor,
- (j) positioning said second pile guide template frame in a manner and direction such that the other ends of the additional laterally-extending support members are operatively positioned adjacent the wall of said well conductor when the second pile guide template frame is in its final operative position, said position being such that at least said other ends of said support members at the top of the second pile guide template frame are above the surface of the water,
- (k) raising the second pile guide template frame to position where at least two of its vertical pile guides are aligned above the upper ends of piles extending above the water surface, and lowering the second pile guide template frame and its pile guides down over the tops of the piles so that they are positioned therein,
- (l) fixedly connecting each pile to its surrounding spaced-apart pile guides, and
- (m) operatively connecting at least said other ends of said laterally-extending support members at the top of the second pile guide template frame and said well conductor guide of said first pile guide template frame to the well conductor, whereby said spaced-apart first and second pile guide template frames form interconnecting reinforcing structures between the piles and the well conductor to resist the effect of wind and wave forces encountered by said well conductor.
Parent Case Info
This is a continuation of application Ser. No. 936,285, filed Dec. 1, 1986.
US Referenced Citations (16)
Foreign Referenced Citations (6)
Number |
Date |
Country |
0019808 |
Feb 1985 |
JPX |
0208513 |
Oct 1985 |
JPX |
8401934 |
Jan 1986 |
NLX |
1563107 |
Mar 1980 |
GBX |
2153886 |
Aug 1985 |
GBX |
0628232 |
Oct 1978 |
SUX |
Continuations (1)
|
Number |
Date |
Country |
Parent |
936285 |
Dec 1986 |
|