At the present time, specialty contractors typically employ one of three commonly used methods to repair cracked and bowed basement walls, depending upon the contractor's personal preference and experience, as well as the specific conditions involved with each installation. The three commonly used methods include earth anchors, vertical steel I-beams, and carbon fiber straps.
Earth anchors consist of a series of steel plates positioned on the inner surface of a failing basement retainment wall. The plates are held in place by long steel tension rods that extend through pre-drilled holes in the wall to another steel plate buried in the soil outside the wall. This method requires considerable installation time and cost, and requires disruption to outside lawn, shrubbery or pavement. In addition, earth anchors are not supported by actual engineering design.
Earth anchors rely on a design process that is fundamentally unsound from an engineering standpoint as it uses a series of relatively small steel plates embedded in the soil outside the house to stabilize much larger sections of wall. It is based on soil pressing against the small plates to resist the same soil pressure against the much larger basement wall. This method cannot be mathematically proven to work using accepted engineering standards. In addition, earth anchors require a significant amount of space outside the house, making it non-useable in many locations with existing obstructions or tight property lines.
While earth anchors are known to be generally effective in many installations and sometimes come with reasonably good warranties, their higher cost, invasive installation requirements, lack of reliability and lack of flexibility are cause for concern.
With the vertical steel I-beam method, a series of vertical steel I-beams are installed along the inside surface of a failing basement wall to stabilize that wall against outside soil pressure. This option requires removal and subsequent replacement of portions of the existing concrete floor slab and finished ceiling at each installation point, requiring increased installation time and cost. Furthermore, the I-beams extend relatively far out into the basement space.
The carbon fiber strap repair method uses a series of “high-tech” carbon fiber straps installed along the inside surface of a failing basement wall to stabilize that wall against outside soil pressure. While the carbon fiber strap repair method clearly works well in certain circumstances, its cost and limitations make it undesirable. The carbon fiber strap repair method has a high installation cost and is not applicable for use on walls which are extensively bowed.
Actually, none of these prior art methods can move the bowed wall back into its original straight and plum condition over time. It is a principal object of the present invention to provide a system which eliminates these foregoing disadvantages of the prior art systems.
The system of the present invention for repairing retaining walls failing under lateral earth pressure to the outer wall surface of the failing wall is comprised of securing upper and lower spaced anchor plates to the inner wall surface of the failing wall by respectively securing upper and lower anchor plates to the inner wall surface of the failing wall with at least one anchor bolt. A threaded steel tension rod is connected between and respectively connected to these upper and lower anchor plates with nuts threadably secured to upper and lower ends of the threaded steel tension rod. Thereafter the threaded steel tension rod is placed under a desired tension load to thereby apply an external tension force to the inner wall surface of the failing wall without applying bending stresses to the threaded steel tension rod. This is accomplished by tightening at least one of the nuts.
Side-by-side multiples of this anchor plate and tension rod combination are applied at spaced intervals to the inner wall surface of the failing wall.
The upper and lower spaced anchor plates are each secured to the inner wall surface of the failing wall with at least one anchor bolt. These anchor bolts are preferably either expansion anchor bolts or adhesive anchor bolts, which have a very high shear capacity and provide very secure attachment of the anchor plates to the masonry surface and insure that no bending stresses will be applied to the threaded steel tension rod.
The method of the present invention can be mathematically proven to work using accepted engineering standards. In fact, the requirements for the tension rods and the anchors can be readily calculated for each application.
The required size of the threaded tension rod for overcoming the tension overstress on the inner wall surface of the failing wall is determined by calculating the tension rod force per rod required to overcome the tension overstress on the inner wall surface, and then calculating the required cross-sectional area of the threaded tension rod. Thereafter the correct tension rod may be selected from standard sizes available by using known allowable tension stress capabilities for a standard steel threaded rod size.
The bolting requirements for the anchor-to-wall shear connection of the anchor plates to the inner wall surface is accomplished by calculating the total anchor load and then selecting the anchor bolt or anchor bolts size from a known shear capacity.
Additional novelty of the system of the present invention is further provided by providing multiple designs of the claimed anchor plate and tension rod combination for respective corresponding different tension rod tension load requirements, and then selecting the combination designed for securement for the inner wall surface which most closely fits the calculated rod tension load requirements.
For example, three different anchor and tension rod designs could be pre-designed for application to three different required tension rod tension loads of for example, up to 2,000 pounds, up to 4,000 pounds, and up to 8,000 pounds, thereby greatly simplifying the procedure for the contractor. The contractor simply selects which anchor and tension rod combination is the most appropriate for the wall condition and the calculated required anchor spacing based on the unit tension previously calculated.
The method and apparatus of the present invention for repairing retaining walls failing under lateral earth pressure is far superior to the prior art systems in that the method can be mathematically calculated and proven by accepted engineering standards, the system is much less expensive for installation and manufacture costs, no disturbances required to outside lawn, shrubbery or pavement, and the protrusion of the system into useable basement area is minimal. In addition, the system of the present invention is actually capable of ultimately moving the bowed wall back into its original straight and un-bowed condition over time, which is not possible by the aforementioned prior art systems.
Some similarities exist to the prior system disclosed in U.S. Pat. No. 5,537,220, for MASONRY WALL BRACE, by J. P. Ellis, which issued on Nov. 3, 1970. This masonry wall brace system uses tension rods applied to the inner surface of a basement retaining wall to resist cracking and bowing. However, there are key differences to the system of the present invention, including design capabilities, installation methods, and load capacity that distinguish the method of the present invention as a very different and superior system.
The system of the present invention is an engineered system that is specifically designed to resist the actual lateral earth pressure loads that are applied to a basement retaining wall based on the actual conditions that apply to each individual case. The Ellis system does not provide any method of determining the necessary tension rod size and spacing, and also does not include any specific design parameters for the top and bottom anchorages. The Ellis system simply does not provide any information regarding how to design the system for a given application.
The system design of the present invention is mechanically anchored to the masonry wall in a manner designed to ensure that the steel rods are only loaded in pure tension. To the contrary, the Ellis anchorage design results in both tension and bending loads being applied to the steel tension rods. The slender tension rods have the inherent ability to resist very high tension loads, but very little ability to resist bending loads. Therefore, when bending loads are considered, their tension load capacity is greatly reduced.
In addition, the bottom anchorage of the Ellis system is connected to the masonry by notching into a horizontal mortar joint. It is therefore held in place by friction and lever action that cannot be specifically designed for each individual installation and has an extremely limited load capacity. To the contrary, the bottom anchorage of the system of the present invention is fastened to the masonry wall with positively connected masonry anchors that are specifically designed for each individual installation based on the actual conditions. The bottom connections of the system of the present invention can be specifically designed to provide much greater load capacity than that of the Ellis system.
Also, the top anchorage of the Ellis system is connected to the masonry wall with overlapped angles or hooks that are also held in place by friction and lever action that is not specifically designed for each individual installation and has an extremely limited load capacity. This top anchorage, like his bottom anchorage, applies unwanted bending loads to the tension rod. In addition, the Ellis anchorages are more difficult to install and his upper anchorage is designed such that in many conditions his design cannot even be installed due to the fact that his upper anchorage is required to overlap the top of the failing masonry wall.
With the system of the present invention, like the bottom anchorage, the top anchorage of the system of the present invention is fastened to the masonry with positively connected masonry anchors that are specifically designed for each individual installation based on the actual existing conditions and provide much greater load capacity.
Other objects and advantages appear hereinafter in the following description and claims. The accompanying drawings show, for the purpose of exemplification, without limiting the scope of the present invention or the appended claims, certain practical embodiments of the present invention wherein:
The system of the present invention is an improved method of repairing masonry and concrete retaining walls that are failing under lateral earth pressure. The system consists of a series of threaded steel tension rods anchored to the inner surface of a below grade (basement) retaining wall that is cracking and bowing inward as a result of lateral earth pressure applying horizontal force against the outer surface of that wall. It works by applying external tension forces to the inner wall surface to counteract calculated internal tension forces that have developed in the masonry or concrete as a result of bending from the lateral earth pressure, to stabilize the wall and correct the problem. Through proper design and installation, this system can even be used to re-straighten bowed walls back into their original “un-bowed” condition. While other wall repair systems claim to have the ability to straighten bowed walls, only the system of the present invention can truly perform this function. And while earth anchor systems are based on empirical designs that do not utilize sound engineering criteria, all components of this system are properly designed for their specific requirement through standard calculations, based on established engineering procedures and material properties.
Lateral Earth Pressure: Horizontal forces applied against the outer surface of a below-grade (basement) retaining wall by lateral earth pressure can easily be calculated, based on the following four measurable parameters:
Density and at rest pressure coefficient are functions of the existing soil type (clay, sand, gravel, rock, etc.) where the wall is located, while the wall and soil heights are based on the actual wall conditions. Once these four critical parameters are established, the lateral pressure being applied to the outer surface of the wall can be calculated using standard engineering formulas. First, the soil density must be converted to an equivalent fluid density (De) using the following equation:
Equivalent Fluid Density of Soil: De=KoDs
The magnitude of horizontal pressure applied by the soil to the wall (Ps) is based on the height of soil pressing against the wall. It varies linearly from zero at the ground surface, to maximum at the base of the wall, in accordance with the following formula:
Horizontal Pressure Against Wall: Ps=hsDe
The horizontal pressure applied by the soil to the outer surface of the wall creates shear and moment forces in the wall that can be calculated based on the factors previously described. While some basement wall failures occur as a result of shear forces, most are caused by overstress from moment loads. Moment forces create bending in the wall, resulting in compressive stress on the outer wall surface (adjacent to the soil) and tension stress on the inner wall surface (facing away from the soil). While masonry has an excellent ability to resist compression stress, it has very little ability to resist tension stress. Therefore, most basement wall failures occur on the inner wall surface 16, which is literally pulled apart by tension, causing cracks 20 to form and horizontal inward movement of the wall (bowing) to occur, as illustrated in
The system of the present invention works to correct the wall failure by applying external tension strength at the cracked inner wall surface that counteracts the tension forces that have caused the wall to crack and bow inward. And because the present system is an engineered system, it can be specifically designed to resist the actual tension forces in any given basement wall through standard calculation. The following example describes exactly how this works.
System Design Example:
Problem:
Calculate the tension rod, anchor, and anchor-to-wall requirements for an existing basement wall with the following parameters:
Solution:
The completed design is shown in
An additional novel feature of the present invention is that multiple designs of the anchor plate and tension rod combination may be precalculated and provide for respective corresponding different tension rod tension load requirements. Then the contractor has the easy decision of selecting the combination design for securement to the inner wall surface which most closely fits the calculated rod tension load requirements. An example of this design approach is described hereinafter with reference to
In this illustration, three different anchor designs are produced, one for a rod tension load of 8,000 pounds as represented by
First, this structural moment in the wall is calculated based on standard engineering principles and the existing physical conditions. The calculated moment is then converted to an equivalent unit tension force per linear foot of wall surface by simply dividing the moment by the block thickness. This is another standard engineering calculation.
Then, the anchor which is most appropriate for the wall condition is selected and the required anchor spacing based on the unit tension calculated in the previous step is calculated. Once again, this is a simple, standard engineering calculation.
This approach greatly simplifies the process of the present invention for the engineer and the contractor. This approach provides three different sets of rod sizes, anchor plate designs, and sleeve anchor requirements depending on the required tension capacity. To the contrary, prior art methods do not provide any method of determining what is required for a given situation.
Number | Name | Date | Kind |
---|---|---|---|
3537220 | Ellis | Nov 1970 | A |
3852970 | Cassidy | Dec 1974 | A |
5115622 | Ammann | May 1992 | A |
5234287 | Rippe, Jr. | Aug 1993 | A |
5845450 | Larsen | Dec 1998 | A |
6357190 | Florentine | Mar 2002 | B1 |
7296385 | Andra | Nov 2007 | B2 |
7380372 | Resch | Jun 2008 | B2 |
7419335 | Cohen | Sep 2008 | B1 |
7774995 | Zidar, Jr. | Aug 2010 | B1 |
8136317 | McCown | Mar 2012 | B1 |
8925267 | Kirby | Jan 2015 | B1 |
20050204673 | Reed | Sep 2005 | A1 |
20090193736 | Halfon | Aug 2009 | A1 |