This invention relates generally to concrete construction, and more particularly to methods and apparatus for setting reinforcement elements such as rebar for reinforced concrete.
Reinforced concrete is a well-known construction material which comprises concrete having a reinforcing material such as steel bars or rods embedded therein. This type of reinforcement is referred to generally as “rebar”. Reinforced concrete has beneficial structural properties of both concrete and the reinforcing material.
Reinforced concrete is often used to form the floor and walls of in-ground swimming pools and similar structures. Typically, the rebar is positioned in place in an excavated pit, and then covered with a sprayable concrete material, for example shotcrete or gunite.
One problem with this type of construction is that the sections of the rebar must be set on a level plane, but a convenient level reference is not usually available.
This problem is addressed by a fixture and a method for setting rebar prior to applying concrete.
According to one aspect of the technology described herein, a fixture for setting rebar at a predetermined distance from the rim of an excavated pit includes: elongated first and second legs each having a proximal end and a distal end, the first and second legs rigidly joined at their mutual proximal ends to form an L-shape; an angle adjustment device carried by the first leg, comprising a foot movable towards or away from the first leg along an axis generally parallel to the second leg; a support bracket carried by the first leg at a predetermined offset distance from the proximal end thereof; and a hook extending from the distal end of the second leg, generally parallel to the first leg.
According to another aspect of the technology described herein, a method for setting rebar at a predetermined distance from the rim of an excavated pit includes: placing a plurality of fixtures at spaced-apart locations around the rim of a pit excavated into the earth, the pit defined by a recessed floor bounded by a generally vertical perimeter wall and being surrounded by a rim, and wherein an upstanding form is disposed around the perimeter of the rim laterally offset from the perimeter wall, each fixture including: elongated first and second legs each having a proximal end and a distal end, the first and second legs rigidly joined at their mutual proximal ends to form an L-shape; an angle adjustment device carried by the first leg, comprising a foot movable towards or away from the first leg along an axis generally parallel to the second leg; a support bracket joined to the first leg at a predetermined offset distance from the proximal end thereof; and a hook extending from the distal end of the second leg, generally parallel to the first leg; positioning the hook of each of the fixtures in engagement with the form; adjusting each of the fixtures using the angle adjustment device so that the first leg is plumb; and placing a length of rebar into the pit, engaged with the support brackets of the plurality of fixtures, such that the rebar is positioned at a substantially uniform vertical offset distance from the rim.
The invention may be best understood by reference to the following description taken in conjunction with the accompanying drawing figures in which:
Referring to the drawings wherein identical reference numerals denote the same elements throughout the various views,
A form 16 is placed on the ground surface 18 surrounding all or a portion of the pit 10. In the illustrated example, the form 16 comprises a thin flexible sheet material such as FORMICA secured in place with stakes 20. The form 16 is typically offset laterally from the perimeter wall 14 by a specified dimension, for example about 30 cm (12 inches).
As seen in
It will be understood that it is desirable for the rails 24 to be placed in a true level orientation relative to the Earth, i.e. each complete rail lies in a single horizontal plane. It will be further understood that the floor 19 of the pit 10 will likely not be completely level, either intentionally or unintentionally. Accordingly, it is generally necessary to use the form 16 as a level reference for the uppermost rail 24 (the top of the form 16 would typically be set level to the Earth during installation). More specifically, multiple measurements are taken along the length of the rail 24 to ensure that the rail 24 is a constant vertical distance from the form everywhere around its perimeter.
Unfortunately, making these measurements is complicated by the fact that the form is offset from the perimeter wall 14. This means that a single measuring instrument cannot easily be used to obtain an accurate measurement.
Additionally, even if all measurements are correct, the rail 24 must be held in the proper position until the complete reinforcing structure 22 is complete. In the prior art, this generally entails the use of pins or rods driven into the perimeter wall 14 of the pit 10. For various reasons, these cannot be left in place and thus require additional labor to remove before the concrete can be applied.
An angle adjustment device 44 is disposed at or near the distal end 42 of the first leg 30. In the illustrated example, the angle adjustment device 44 comprises a first threaded element 46 (such as a nut) affixed to or integral with the first leg 30, and a second threaded element 48 (such as a threaded rod or bolt) which engages the first threaded element 46. The second threaded element 48 includes a foot 50 (such as a flat plate) at one end, and a head 51 at the opposite end configured to be engaged by a wrench or other similar tool. For example, the head 51 may have a hexagonal shape.
Rotation of the second threaded element 48 in one direction moves the foot 50 towards the first leg 30, and rotation of the second threaded element 48 and the opposite direction moves the foot 50 away from the first leg 30.
For the purposes of the present invention, any mechanism which provides a foot that can move inward and outward relative to the first leg 30 (or in other words along an axis generally parallel to the second leg 32) may be used in place of the two threaded elements described above.
A support bracket 52 is affixed to or integral with the first leg 30 and is located a predetermined vertical offset distance “V” from the second leg 32. In the illustrated example, the support bracket 52 comprises a short section of L-shaped stock defining an upward-facing hook. If desired, multiple support brackets 52 may be provided at preselected distances along the first leg 30, as shown.
Optionally, the support bracket 52 or brackets may be made movable or adjustable. For example, the first leg 30 could be provided with a plurality of spaced-apart holes, and the support bracket 52 could be attached using a fastener passing through a selected one of the holes. Alternatively, the vertical leg could be attached to the first leg 30 using a sliding connection.
Optionally, the fixture 28 may be provided with means for measuring its inclination, such as a known type of mechanical or electronic level. For example, in
The fixture 28 and its constituent components may be constructed from any suitable material that will maintain its rigidity and dimensional stability in use. Nonlimiting examples of suitable materials include wood, plastics, composite materials, and metals. In the illustrated example, the fixture 28 is fabricated from sections of steel tubing and steel angle stock welded together.
The fixture 128 includes a vertical leg 130 and a horizontal leg 132 which meet at mutual proximal ends 134, 136. A hook 138 extends downward from a distal end 140 of the horizontal leg 132. An angle adjustment device 144 is disposed at or near a distal end 142 of the vertical leg 130. At least one support bracket 152 is affixed to or integral with the vertical leg 130 and is located a predetermined vertical offset distance “V” from the horizontal leg 132.
The fixture 128 further includes a clamping mechanism 154. In illustrated example, the clamping mechanism 154 comprises a first threaded element 156 affixed to or integral with the vertical leg 130, near the proximal end 134 of the vertical leg 130, and a second threaded element 158 which engages the first threaded element 156. The second threaded element 158 includes a jaw 160 at one end (for example a flat plate), and a head 162 at the opposite end configured to be engaged by a wrench or other similar tool. For example, the head 162 may have a hexagonal shape. Rotation of the second threaded element in one direction moves the jaw 160 towards the hook 138, and rotation of the second threaded element 158 in the opposite direction moves the jaw 160 away from the hook 138.
The use of the fixture 28 will now be described with reference to
Once the fixture 28 is secured, it is adjusted to ensure that the first leg 30 is in fact vertical or “plumb” to the Earth. This may be done by using a conventional bubble level (not shown) placed abutting the second leg 32 or the first leg 30, or by using the built-in inclination measuring means, if present. The foot 50 bears against the perimeter wall 14. Therefore, using the angle adjusting device 44 to move the foot 50 towards or away from the first leg 30 will cause the fixture 28 to pivot.
Once the fixture 28 is set with the first leg 30 plumb to the earth, the support bracket 52 will be positioned at a specific lateral distance L from the form 16, and a specific vertical distance V as described above. The same procedure is repeated using a plurality of identical fixtures 28 around the entire perimeter of the pit 10.
Once all the fixtures 28 are set, a length of rebar may then be set into each of the support brackets 52, thus forming a rail 24 which is substantially in a single plane at a fixed distance below the ground surface 18. This result is obtained without the need for any measuring. The process may be continued by placing additional rails below the first rail 24. Because the first rail 24 lies in a single plane, it is possible to set the next rail 24 by using simple offset measurements from the first rail 24. Alternatively, if the fixture 28 incorporates multiple support brackets 52 as described above, then the additional rails 24 may be formed by placing additional lengths of rebar into the additional support brackets 52. The uprights 26 described above may then be set in place and connected to the rails 24.
Once the support structure is in place, it is a self-supporting and the fixtures 28 are no longer required. Accordingly, the fixtures 28 may be removed prior to the application of concrete. Fixtures 28 may be reused indefinitely.
The apparatus and method described herein has numerous benefits compared to the prior art. A primary benefit is a large reduction in the time required to set the reinforcing structure. Another benefit is the ease of removal of the fixtures after use.
The foregoing has described apparatus and methods for supporting a reinforcing structure. All of the features disclosed in this specification, and/or all of the steps of any method or process so disclosed, may be combined in any combination, except combinations where at least some of such features and/or steps are mutually exclusive.
Each feature disclosed in this specification may be replaced by alternative features serving the same, equivalent or similar purpose, unless expressly stated otherwise. Thus, unless expressly stated otherwise, each feature disclosed is one example only of a generic series of equivalent or similar features.
The invention is not restricted to the details of the foregoing embodiment(s). The invention extends, or to any novel one, or any novel combination, of the steps of any method or process so disclosed.
Number | Name | Date | Kind |
---|---|---|---|
1880710 | Bitney | Oct 1932 | A |
2308142 | Alloway | Jan 1943 | A |
3510097 | McCaleb | May 1970 | A |
3515244 | Weible | Jun 1970 | A |
4059248 | Kuntz | Nov 1977 | A |
20140115996 | Hurst | May 2014 | A1 |
Number | Date | Country | |
---|---|---|---|
20180023299 A1 | Jan 2018 | US |
Number | Date | Country | |
---|---|---|---|
62363906 | Jul 2016 | US |