1. Field of the Invention
The present invention relates to apparatus and methods for oil and gas wells to enhance the production of subterranean wells, either open hole, cased hole, or cemented in place and more particularly to improved multizone stimulation systems.
2. Description of Related Art
Wells are drilled to a depth in order to intersect a series of formations or zones in order to produce hydrocarbons from beneath the earth. Some wells are drilled horizontally through a formation and it is desired to section the wellbore in order to achieve a better stimulation along the length of the horizontal wellbore. The drilled wells are cased and cemented to a planned depth or a portion of the well is left open hole.
Producing formations intersect with the well bore in order to create a flow path to the surface. Stimulation processes, such as fracing or acidizing are used to increase the flow of hydrocarbons through the formations. The formations may have reduced permeability due to mud and drilling damage or other formation characteristics. In order to increase the flow of hydrocarbons through the formations, it is desirable to treat the formations to increase flow area and permeability. This is done most effectively by setting either open-hole packers or cased-hole packers at intervals along the length of the wellbore. These packers isolate sections of the formations so that each section can be better treated for productivity. Between the packers is a frac port and in some cases a sliding sleeve or a casing that communicates with the formation or sometimes open hole. In order to direct a treatment fluid through a frac port and into the formation, a seat or valve may be placed above a sliding sleeve or below a frac port. A ball or plug may be dropped to land on the seat in order to direct fluid through the frac port and into the formation.
One method, furnished by PackersPlus, places a series of ball seats below the frac ports with each seat size accepting a different ball size. Smaller diameter seats are at the bottom of the completion and the seat size increases for each zone as you go up the well. For each seat size there is a ball size so the smallest ball is dropped first to clear all the larger seats until it reaches the appropriate seat. In cases where many zones are being treated, maybe as many as 20 zones, the seat diameters have to be very close. The balls that are dropped have less surface area to land on as the number of zones increase. With less seat surface to land on, the amount of pressure you can put on the ball, especially at elevated temperature, becomes less and less. This means you can't get adequate pressure to frac the zone because the ball is so wreak, so the ball blows through the seat. Furthermore, the small ball seats reduce the I.D. of the production flow path which creates other problems. The small I.D. prevents re-entry of other downhole devices, i.e., plugs, miming and pulling tools, shifting tools for sliding sleeves, perforating gun size (smaller guns, less penetration), and of course production rates. In order to remove the seats, a milling ran is needed to mill out ail the seats and any bails that remain in the well.
The size of the ball seats and related bails limits the number of zones that can be treated in a single trip. Furthermore, the balls have to be dropped from the surface for each zone and gravitated or pumped to the seats.
Another method, used by PackersPlus, U.S. Pat. No. 7,543,634 B2, places sleeves in the I.D. of the tubing string. These sleeves cover the frac ports and packers are placed above and below the frac ports. Varying sizes of balls or plugs are dropped on top of the sleeves and when pressuring down the tubing, the pressure acts on the ball and the ball forces the sleeve downward. Once again you have the restriction of the ball seats and theoretically, and most likely in practice, when the bail shifts the sleeve downward, the frac port opens and allows the force due to pressure diminish off before the sleeve is fully opened. If the ball and sleeve remain in the flow path, the flow path is restricted for the frac operation.
It would be advantageous to have a system that had no bail seats that restrict the I.D. of the tubing and to eliminate the need to spend the time and expense of milling out the ball seats, not to mention the debris created by the milling operation. Also, it would be beneficial to have a system that automatically fully opens each sliding sleeve and isolates the zone below, progressively up the well bore, before each zone is stimulated. Such a system allows stimulation of one zone at a time to achieve the maximum frac efficiency for each zone. In addition, it would be advantageous to be able to, in the future, isolate any zones by closing a sliding sleeve. For example, a single zone could be shut off if it began producing water or became a theft zone.
Furthermore, it would be greatly advantageous to eliminate the time and logistics required for dropping numerous balls into the well, one at a time, for each zone in the well to be treated. It would also be advantageous to have a multizone frac system that functioned automatically while all zones were being stimulated in order to minimize the time surface pumping equipment is setting idol between pumping zones.
Many wells are being stimulated at multiple zones through the well bore by use of composite plugs such as the “Halliburton Obsidian Frac Plug” or the “Owen Type ‘A’ Frac Plug”. A composite plug is set near, or below, a zone and then the zone is treated. Another composite plug is set in the next upper zone and that zone is treated, and so on up the well bore until multiple plugs remain in the well. The composite plugs are then drilled out which can be time consuming and expensive. The shavings from the mill operation leave trash in the well and can also plug off flow chokes at the surface. It would be advantageous to have a system that eliminated the use and drilling out of composite or millable plugs. Of course, this approach would apply to new well completions where equipment, of the present invention, could be placed into the well prior to treating.
Other well completions, such as intelligent wells, are designed to operate downhole devices by use of control lines running from the surface to various downhole devices such as packers, sleeves, valves, etc. An example of this type of system can be found in Schlumberger Patent U.S. Pat. No. 6,817,410 B2. This patent describes use of control lines and the various devices they operate. It is obvious the use of control lines can make the completion very complicated and expensive. The present invention allows operation of some types of downhole devices possible without the use of control lines. For example, the present invention describes a timer/pressure device that could be placed both above and below a sliding sleeve, and days, months, or even years later, a sliding sleeve, or series of sliding sleeves, could be programmed to open or close.
There are other wells that sometimes require well intervention. A product called a Well Tractor, supplied by Welltec, is used to aid in shifting sliding sleeves opened or closed in long horizontal wells or highly deviated wells, sometimes in conjunction with wireline or coiled tubing operations. The present invention oilers an alternate and more economical solution to functioning downhole devices in wells without well intervention.
This invention provides an improved multizone stimulation system to improve the conductivity of the well formations with reduced rig time, no milling, and no control lines from the surface and, for some other applications, reduce well intervention. The equipment for all zones can be conveyed in single work string trip and frac units can stay on location one time to treat all zones.
This invention relates to an automatic progressive stimulation system where no control line or bail drop apparatus are needed. This system can also eliminate the need to set and mill out composite plugs in newly planned well completions. When single zone or multiple zone wells are to be completed with plans of stimulation and then producing, the equipment in the present invention can be utilized. This invention is comprised of three major components; a packer, a timer/pressure device, and a sliding sleeve/valve assembly. Although, in some cases, a packer may not be needed, for example, if the system is cemented in place. The combination of these three components, or two components without the packer, has been given the name “Frac Module”.
I. The packer can be several types, such as those that set hydraulically by applying tubing pressure, those that are Swellable, or those that are Inflatable, to mention a few.
II. The timer/pressure device is a device that can be actuated by application of well pressure such as tubing pressure or annulus pressure. This pressure can act on a pressure sensitive device, which in turn triggers a timing device where the timing device, or a plurality of timing devices, can be set to any desired time, before it triggers a pressure generating device which is turn applies pressure to a downhole tool in order to activate the tool.
III. The sliding sleeve is a typical type sleeve that can open or close a port, or series of ports, that allow fluids or slurries to travel down the well conduit, through the ports, and communicate with the formation. For the present invention, the sliding sleeve would be of the piston type where pressure acts on a piston and in turn shifts the sleeve. A frangible flapper valve, or other type of valve, is positioned above the sliding sleeve and closes when the sliding sleeve shifts downward. The valve directs flow through the ports in the sliding sleeve and isolates the zone below.
A series of frac modules placed in the well act in unison, where all packers are set at once and all timers/pressure devices are triggered at once, with a single application of tubing pressure. Each timer in each zone can be set to a desired time so that, for example, the lowermost timer actuates a pressure generating device after one hour from the time when tubing pressure was initially applied. The pressure generating device creates pressure that communicates with a piston on the sliding sleeve to open the sliding sleeve and close the flapper valve. This first zone is treated through the sliding sleeve ports before the next upper sliding sleeve opens.
The next upper Frac Module timer is set for 2 hours, for example, from the time when initial tubing pressure was applied. At the end of the two hour time period, the timer actuates a pressure generating device to open its sliding sleeve so the zone can be treated. Timers in each zone can be set to the desired time to allow stimulating as many zones as required.
The timing devices can be set so that all zones can be nearly continuously treated in order to optimize the use of surface stimulation equipment. The timers are versatile enough where all the timers can be triggered at once. A portion of timers can be triggered at one selected pressure while others are triggered at different selected pressures, or sequences of applied pressures. A further option includes a pressure sensitive device that is attached to or built into each timing device, which monitors well pressure so that when well pressure reaches a predetermined level, the timers go into a “Stand-Down-Mode”. Surface applied well pressure can be in the form of a series of pressure increase or decreases in conjunction with pressure holds or simply a decrease in pressure to a pre-selected level. For example, if frac pumping is in process and all of the timers are running, if the frac operation stops for some reason and frac pressure drops below a selected point, all of the timers go into a “Stand-Down-Mode” where the timers stop temporarily. The timers remember the time used up to that point and when pump pressure resumes, all of the timers begin running once again for the balance of the time remaining in each timer. All of the timers remain in their preprogrammed sliding sleeve activation sequence.
To those familiar with the art of well completions, it is obvious that the scope of this invention is not limited to just timer/pressure generating devices shifting sliding sleeves open or closed but can also be used to actuate any type or combination of a downhole tool device, or devices, in any timing sequence, such as perforating guns, valves, packers, etc. More than one timing/pressure device can be used to function a single type multiple times by setting the timers at different time spans.
With reference to
Tubing string 1 has a connecting thread 3 that connects to top sub 4. Top sub 4 threadably connects to packer mandrel 7. Packing element 5 and gage ring 6 are positioned over mandrel 7. Ratchet ring 8 is located and threadably locked inside housing 9. Piston 10 is threadably connected to gage ring 6 and ratchet ring 8 engages piston thread 96 as piston 10 strokes upward (left end of drawing). Seals 11 and 12 form a seal in bores 97 and 98 and between piston 10. Tubing pressure 52 enters port 14 and acts across seals 11 and 12 to move piston 10 upward compressing packing element 5. Fluid is displaced through port 16. Ratchet ring 8 locks piston 10 so the packing element 5 stays compressed and sealed inside outer casing 99. Housing 9 has pin thread 13 facing downward.
Referring to
Referring to the schematic, thread 17 of pin 13 connects to outer chamber 19. Inner chamber 20 is trapped inside outer chamber 19 to form an annular space between the two chambers. Piston 25 has seals 23 and 24 that seal inside of inner and outer chambers 19 and 20. Tubing pressure 52 enters port 21 and chamber 22 to act on piston 25. The top end of compression spring 29 is shown in a near solid height condition where spring 29 makes solid contact with piston 25 at location 28.
The bottom end of compression spring 29 makes solid contact with orifice piston 33 at location 30. Shear screws 31 shearably connect orifice piston 33 to inner chamber groove 100. Piston 25 is allowed to stroke downward until face 26 contacts shoulder 27.
A flow control device, such as a LEE Visco Jet 32 is located inside of orifice piston 33 so that fluid, such as silicone oil, located in chamber 39 can only pass thru Visco Jet 32 and into chamber 40. Seals 34 and 35 seal orifice piston 33 on the inside walls of chamber 39. orifice piston 33 has face 36 that travels through chamber 39 to make contact with face 37 of pressure release rod 38. Pressure chamber 48 is threadably connected to outer chamber 19 at thread 50. Seals 42 and 49 isolate chamber 45 where chamber 45 is charged with a pressurized gas, such as nitrogen. Seals 41 on both ends of pressure release rod 38 also isolate chamber 45 to hold pressurized gas within the chamber. Chamber 39 communicates with chamber 44 through gap 47.
Bores 46 inside of pressure chamber 48 are of near equal, or equal, diameter and seals 41 are of near, or equal, diameter so that pressure release rod 38 is in the pressure balanced condition when exposed to pressure from either chambers 39 or 45. Pressure release rod 38 is held relative to chamber 48 by a low force spring loaded detent ball 101 to prevent pressure release rod 38 from moving until contacted by orifice piston face 36.
Chamber 45 is charged with high pressure nitrogen gas through nitrogen charge valve 58 and longitudinal hole 53. Hole 53 is sealed off at one end with plug 56 but is open to chamber 45 at the opposing end. Seals 59 and 60 seal the nitrogen charge valve 58 in order to prevent passage of gas out of chamber 45 and past the valve 58.
A doughnut sleeve with internal o-rings and a sealed alien wrench, not shown, slides over nitrogen charge valve 58 to allow unscrewing Valve 58 to allow passage of gas through the doughnut and into chamber 45. Once chamber 45 is at the desired pressure, the valve 58 is closed with the Allen wrench to seal the chamber 45.
Upper sleeve housing 68 is threadably attached to chamber 48 with thread 61 and sealed with seals 62. Longitudinal hole 54 communicates with chamber 44, not exposed to charged gas pressure at this time, and chamber 55 and hole 57. Seals 63 isolate chamber 55 from pressure 52. Seals 51 isolate pressure 52 from chambers 39 and 44.
Pressure release rod 38 has recesses 43 and 102 so when shifted downward by spring force in spring 29 and face 36, seal 41 leave seal bore 46 and pressurized gas can move from inside chamber 45 to chamber 55 and into hole 57.
Frangible flapper valve 65 is mounted by axle 66 and is spring biased with spring 67 to rotate from the open position, shown, to the closed position. Finger 64 temporarily holds the Flapper 65 in the open position. Axle 66 is positioned on the upstream portion of sleeve 71 and is carried by it.
Referring to
Single or multiple ports 70 go through the wall of upper sleeve housing 68 and sleeve 71 and seals 69 and 80 prevent pressure or fluid from traveling from location 103, through ports 70 and to location 104, or vice versa. If pressure in chamber 72 is greater than pressure in chamber 77 and pressure acts on piston 76, the piston 76 and sliding sleeve 71 will move downward toward chamber 77. During this movement, fluid exits ports 78 and 79 to area 104. When seal 74 passes port 78, gas pressure above piston 76 and in chamber 72 passes through port 78 allowing the gas pressure to equalize.
Downward movement of sleeve 71 allows seal 69 to move past port 70 so that flow passage can occur from area 103 to area 104. Also, when the sliding sleeve 71 moves downward, flapper 65 moves away from finger 64 and rotates around axle 66 allowing spring 67 to rotate flapper 65 to the closed position.
Collets 88 and 89 are common to sliding sleeves and come in different geometries. The collets lock the sliding sleeve 71 either in the up or down position in recesses 87 and 90. Shifting tool profiles are added to the inside of the sliding sleeve 71 to use mechanical shifting tools run on wireline or tubing, to shift the sliding sleeve 71 closed or back open at some future time.
Sleeve housing 83 is threadably connected to upper sleeve housing 68 with thread 81. A stop key 85 may be employed to engage shoulder 86 to stop the downward movement of sliding sleeve 72 as to not load collets 88 and 89 in compression. Stop key 85 sets in pocket 82 and can move downward in slot 84.
Bottom sub 93 is threadably attached to sleeve housing 83 with thread 91 and is sealed with seals 92. Pin thread 94 connects to a tubing spacer which in turn connects to another Frac Module or possibly a bottom locator seal assembly that stings into a sump packer.
Referencing
Referring to
Once again, there is an outer chamber 19, an Inner chamber 20, a port 21, a chamber 22, seals 23 and 24, a chamber 44, and a hole 57. Pressure from area 52 enters port 21 into chamber 22 and into hole 129. Pressure in hole 129 acts on a pressure sensitive device, such as a pressure transducer 130. The pressure transducer triggers a switch 131 that starts an adjustable timer 132 that is set for a time frame, say 4 hours. The timer can be pre-set at the surface prior to running the tools into the well. The timer can be set for any time increment desired, for example from 1 minute to 100 hours, or longer. At the end of 4 hours it triggers a switch 133 to supply battery power 134 to an igniter 135, or initiator. The battery power can also run the timer or the timer can be purely mechanical. Power supplied to the igniter 135 triggers the igniter 135, or initiator, to cause the material in the gas generator 136 to bum, react, or mix, and produce high pressure gas. The high pressure gas pressure increases in chamber 44, travels through hole 57 to act on the piston 76, shown in
The device in
Furthermore, it is important to recognize that the timer/pressure device described in
Referring to
Referring to
Referring to
With reference to the example in
A well has been drilled, cased, cemented, and perforated, although this system may be used in open hole completions with selection of the appropriate packers. Casing 116 is shown in this example with zones and perforations 111, 112, and 113 in the casing. The objective is to stimulate all of the zones 111, 112, and 113 in a single trip without well intervention. A sump packer 109 is properly located and set below the lowermost zone 113 although this packer may be substituted with a packer similar to packer 119 by landing a ball against a seat below where packer 109 is shown.
A “completion string” is run into the well consisting of a locator snap latch seal assembly 110, tubing spacer 114, frac module 108, tubing spacer 114, frac module 107, tubing spacer 114, frac module 106, tubing spacer 114, a service/production packer (not shown), and work string or production 115. The length of tubing spacers 114 are made to position the frac modules 106, 107, and 108 between the producing zones 111, 112, and 113.
The single trip completion string is landed in sump packer 109. The location of sump Packer 109 is based on logs of the zones so that all equipment could be spaced out properly. Therefore, by locating the completion assembly on the sump packer 109, all Frac Modules 106, 107 and 108 will be properly positioned in the well. Snap latch seal assembly 110 can be used to verify position of the system before setting any of the packers 117, 118, and 119. The locator snap latch seal assembly 110 seals in the sump packer 109 and will locate on the sump packer. The locator snap latch seal assembly 110 is designed to allow pulling of the work string 115 to get a load indication on the sump packer 109 and then snap back in and put set-down weight on the sump packer 109. The above steps are common in the art of completing wells.
At this point in time the completion hardware, shown in
Now that the completion system is in the proper position in the well and all surface equipment has been nippled-up, the zones are ready to stimulate.
At this point all the sliding sleeves in each Frac Module are in the closed position. The operator may decide to do a low pressure system pressure test at this time before actuating any downhole devices. The entire system is pressured up, for example, to 500 psi and held for a period of time until there is proof of no leaks in the system.
At this point all surface equipment is miming and the well is ready to stimulate. The first step is to set all of the packers, assuming that they are hydraulic tubing pressure set packers. If they are swellable packers, the operator will wait to begin operations until all of the Swellable packers have had time to swell.
Continuing and assuming the packers are tubing pressure set, the surface pump units begin applying tubing pressure 126 inside of work string 115 to packer setting ports 14. All of the packers may be designed to begin setting at 1,500 psi and may not fully set until the tubing pressure reaches 3,500 psi, for example. This pressuring operation will take several minutes.
The same pressure 52 used to set the packers 117, 118, and 119, also reaches the Frac Module timer pressure devices 122, 121, and 120. In this case, all of the timers have been set to actuate close to the exact same time so when the tubing pressure reaches 1,500 psi, for example, all the devices 122, 121, and 120 start counting time. If the lowermost zone 113 is to be stimulated first, the timer in device 120 may have been set at 30 minutes, i.e., the amount of time before the first sliding sleeve 123 is opened and the flapper in the closed position. The timer is zone 112 may be been set for 2 hours and the timer in zone 111, may have been set for 3 hours.
At this point in time, possibly 15 minutes after initial setting pressure was applied, all of the packers are set and all of the timers are running. It is now critical to begin pumping the job since the timer clocks are ticking, unless the stand-down mode is to be utilized. The first zone 113 will need to be traced but the sliding sleeve 123 in Frac Module 108 must first open. The following paragraphs will explain how the sliding sleeve 123 opens.
Referring to
The spring 29 has sufficient load and stroke to move rod 38 downward through charged nitrogen chamber 45. When the rod undercuts 102 of rod 38 move downward and seals 41 move out of seal bores 46, nitrogen gas is allowed to exit chamber 45 and enter chamber 44, hole 54, and hole 57. The gas pressure is of sufficient magnitude so when it acts on sliding sleeve piston 76, the sliding sleeve 71 is shifted downward to open up frac port 70. Frac port 70 then allows fluid communication form area 103 to area 104.
Simultaneously, flapper 65 is pulled downward away from finger 64, and flapper 65 rotates around axle 66, and is biased to the closed position by spring 67 to form a seal on top of sliding sleeve 71. Once the sliding sleeve 71 is fully shifted downward, excess nitrogen gas is allowed to escape through port 78 in order to equalize pressure around the sliding sleeve 71. This is important in case the sliding sleeve 71 needs to be shifted closed by mechanical shifting tools, at a later point in time after the well has been treated. The seals 23 and 24 on piston 25 provide a seal to prevent communication of fluid backward from port 78 to port 21 or vice versa. In this case, once the sliding sleeve 71 is fully shifted down, the collets 89 lock in groove 90 to hold the sliding sleeve in the open position. Likewise, when the sliding sleeve 71 is closed, collets 88 lock in groove 87 to hold the sliding sleeve 71 in the closed position.
At this point in time, the sliding sleeve 123 is shifted open and the flapper 65 is sealing the top of the sliding sleeve 71 so when pumping fluid from the surface of the well, fluid will not pass through the inside of sliding sleeve 71, but will be blocked by the flapper 65 and directed through frac Port 70 and into formation 113.
Formation 113 is treated by pumping fluid, or slurry, down work string 115, through the upper Frac Modules 106 and 107 and out of ports 70 located in Frac Module 108, and thru perforations 113 and into formation 113. This operation has been planned by the pumping company to be complete before the 2 hour time period programmed in Frac Module 107. Of course the 2 hour time period could have been reduced to minimize the time between treating zones.
After 2 hours from the original initiation point of setting the packers and starting the timers, the sliding sleeve 71 in Frac Module 107 opens and flapper 65 closes per the above described process, so zone 112 can now be treated.
This process continues for all zones that are in the completion and stimulation program for the well. As each zone is treated up the well, each Frac Module operates independently from the others, so failure of one to operate does not affect the operation of the others.
Once all zones are treated, the surface stimulation equipment can move off location. Flow from the formations can be used to attempt to clean up the well. The flow will open the flappers and allow fluid to move up hole.
It is also common practice to go back in the well, wash out excess proppant, if proppant was used, break the frangible flapper disc's, and close sliding sleeve 71 for zone isolation, if desired. The sliding sleeves have profiles machined in the inside of the sleeves so that standard type mechanical shifting tools can be used to either open or close the ports 70.
Referring to
Referring to
Referring to
Although the present invention has been described with respect to specific details, it is not intended that such details should be regarded as limitations on the scope of the invention, except to the extent that they are included in the accompanying claims.
This application is a Continuation-in-Part of U.S. patent application Ser. No. 13/285,109 filed Oct. 31, 2011 which claims priority to U.S. provisional application Ser. No. 61/408,780 filed on Nov. 1, 2010.
Number | Date | Country | |
---|---|---|---|
61408780 | Nov 2010 | US |
Number | Date | Country | |
---|---|---|---|
Parent | 13285109 | Oct 2011 | US |
Child | 13358265 | US |