The present invention relates to an innovative technique providing a one-pass operation that, while vertically excavates through soil formation, installs riser segments from underground to upward.
In the following, such a technique will be also called as: “Riser Concept”.
According to the invention, it is provided a pipe jacking equipment for vertically pushing the riser pipe from underground to pass upwards through soil formations to waterbody, air intake, terrain surface or the like. The invention can be applied either in traditionally bored tunnel or in tunnel bored by Tunnel Boring Machine (TBM).
Heretofore, several methods have been designed for excavating vertical or slightly inclined bore holes from a gallery, shaft or like at one level to a gallery, shaft or like at another level, but no previous methods permit to build vertical risers from an underground lower level to upper level, through soil, especially in underwater applications (see table below).
According to the table, no existing method and apparatus permit to construct vertical risers with permanent lining, excavating bottom-up through soil from underground position.
US 2003/094311 A1 discloses a cutter structure for a shield machine configured to be advanced by boring through a tunnel wall of an existing tunnel. When the shield machine is caused to advance in the upward direction, an advancing seal is connected to an advancing section ring of an exavatable wall. A cutter is rotated by using a motor, while jacks elongate in order to determine rising of the machine in the upward direction. Then, the excavatable wall is gradually cut away from its inner peripheral surface by bits, mounted on the rotating cutter. An excavating surface of a workface defined by rotation of the cutter is configured so as to have a curved shape, such that the excavatable wall can be excavated with a cylindrical form. Accordingly, as the machine advances by boring through the excavatable wall, the bits open an elliptical hole, diametrically extending outward from a central portion of the cutter.
U.S. Pat. No. 7,004,679 B2 discloses an easily-cuttable tunnel segment structure, formed by connecting a plurality of easily-cuttable tunnel segment pieces to each other in the longitudinal direction of a tunnel, so that an area of the easily-cuttable tunnel segment structure to be cut (corresponding to an area to be tunneled by a shield machine for forming a branch tunnel) extends over the plurality of segment pieces.
WO 2015/087311 A2 discloses a procedure for constructing underground transport infrastructures comprising excavating at least an underground transport tunnel comprising a first pipe and a second pipe, substantially parallel to one another, and making at least a bypass tunnel connecting said first pipe and said second pipe. The step of making the bypass tunnel comprises: introducing a launching chamber along said first pipe up to a first predefined position chosen along the longitudinal direction of said first pipe, said launching chamber being able to launch at least a tunnel boring machine; introducing an arrival chamber along said second pipe, up to a second predefined position chosen along the longitudinal direction of said second pipe, said arrival chamber being able to receive said tunnel boring machine; and excavating said bypass tunnel by making said tunnel boring machine move forward from said launching chamber to said arrival chamber along a direction transversal with respect to said first pipe and said second pipe.
Further prior art relating to a system for the bottom-up construction of vertical riser pipes from underground tunnels, passes or the like is disclosed, for example, in DE 17 58 505 A1, JP 2002 106289 A and CN 105 041 204 A.
In view of the above, a first object of the invention is to provide a method and apparatus conceived to provide one-pass operation of soil excavation and riser segments permanent installation in vertical risers, excavating upwards from underground passes through soil by means of a pipe jacking equipment.
A second object of invention is to provide a method and apparatus to displace and remove the soil by a displacement head, equipped by hydro-demolition system, to allow weakening dense soil and a soil discharge line to extract excavate soils.
A third object of invention is to provide a method and apparatus for providing the precise settle of a keystone launching segment connected with a displacement head. This aim is achieved by using special segment rings, provided by slotted holes or the like, which enable an on-site rotational adjustability of the keystone launching segment.
A fourth object of invention is to provide a method and apparatus for installing riser segments as permanent lining of the vertical riser.
A fifth object of invention is to provide a method and apparatus configured and designed for underwater application by means of sealing systems.
The present invention relates to the technical field of earth boring and more particularly relates to a method and apparatus wherein a pipe jacking equipment is provided, to install vertical risers by pushing upward riser segments into soil formations, from an underground pass to an upper level. The excavation and removal of the soil is achieved by a displacement head, equipped with a hydro-demolition system and a soil discharge line.
According to the invention, said displacement head is fastened to a keystone launching segment, equipped with a sealing system configured to connect the riser and the tunnel, to guarantee a watertight connection.
The above objects and further aims are obtained according to the present invention by providing a pipe jacking equipment that vertically push upwards the riser, divided into segments, from underground position to upper level through soil formation, even in underwater applications.
This invention is further provided with sealing systems configured to allow underwater applications and to guarantee a watertight connection between the segments of the riser themselves.
Further scope of applicability of the present invention will become apparent from the detailed description given hereinafter. However, it should be understood that the detailed description and specific examples, while indicating preferred embodiments of the invention, are given by way of illustration only, since various changes and modifications within the spirit and scope of the invention will become apparent to those skilled in the art from this detailed description.
The present invention will become more fully understood from the detailed description given hereinbelow and the accompanying drawings which are given by way of illustration only, and thus, are not limitive of the present invention, and wherein:
In case of applying the invention in TBM tunnels (
A displacement head (2) is fastened to keystone launching segment (3), which has previously been placed in the desired position for the installation of the riser (7).
According to a peculiar feature of the invention, the correct position of keystone launching segment (3) is adjustable by regulating the rotation of said special segment rings through special slotted holes (19) or the like for the longitudinal connection between the special rings (4, 5). Said slotted holes, or the like, enable an on-site rotational adjustability of the position of keystone launching segment (3).
A sealing system (6), comprising lip gaskets (6A) and additional emergency seals (6B), is configured to ensure the water tightness between riser (7) or displacement head (2) and keystone launching segment (3).
According to the method of the present invention:
a) A pipe jacking equipment (1) is positioned underneath said keystone launching segment (3) and
b) A riser initial segment (7A) is placed onto a thrust platform (14);
c) Said riser initial segment (7A) is connected to the displacement head (2) and is hold in the desired position by a pipe clamp (8) and then displacement head (2) is disconnected from keystone launching segment (3).
d) A high-pressure water system (17) and a discharge line system (18) are hooked up to displacement head (2) passing through riser initial segment (7A).
e) The pipe jacking equipment (1) starts to drive/push riser initial segment (7A) through the soil, by means of a trust platform (14) and of a hydro-demolition system of displacement head (2) provided with nozzles configured to spray pressurized water to weaken the soil structure in the penetration area of displacement head (2).
f) The thrust force is uniformly transferred to the tunnel structure by a load distribution system (15).
g) A spacer (9) is placed under the riser initial segment (7A) to drive the segment trough the soil up to the required elevation;
h) In this position, riser initial segment (7A) is blocked by pipe clamp (8),
i) The spacer (9) is removed and a riser standard segment (7B) is placed on the trust platform and connected to the previous one.
These operations are repeated up to reach the desired elevation when the last segment, a riser ending segment (7C), has to be installed. Such last element is provided with two flanges: one for the permanent connection with keystone launching segment (3) and the other one to fasten a temporary bulkhead (11).
Before removing displacement head (2) from the top of riser initial segment (7A), said temporary bulkhead (11) or the like must be installed at the bottom of riser ending segment (7C) to prevent water from entering in the tunnel.
The final step would be the removal of displacement head (2), the installation of diffuser (10) or the like at the top riser initial segment (7A) and the removal of the temporary bulkhead (11) or the like from the bottom of riser ending segment.
According to the present invention:
All risers comprise at least three segments: riser initial segment (7A), riser standard segment (7B) and riser ending segment (7C).
All the riser segments joints are designed and configured in order to: guarantee the desired structural capacity; avoid damage on the interface of riser segments (7) and sealing system (6) during the pushing operation; ensure water tightness, maximum assembly speed, constructability in an underground working space.
For all jacking operations, before to apply the thrust, pipe clamp (8) is opened to drive riser segment into the soil and after to apply the thrust, pipe clamp (8) is closed to hold riser segment.
High Pressure water system (17) and discharge line system (18) must be disconnected from displacement head (2), passed through each riser segment and reconnected to displacement head (2), before activating the pipe jacking equipment (1).
A preferred embodiment designed to carry out the Riser Concept of the present invention will hereinafter be described, with reference to a non-limitative application thereof.
A submarine outfall is a pipeline or tunnel that discharges municipal or industrial wastewarer, storm water, combined sewer overflow or brine effluent from a wastewater treatment plant or desalination plant into a waterbody. The wastewater treatment plant treats to discharge positively buoyant effluent from a wastewater treatment plant, while the desalination plant treats to discharge negatively buoyant effluent (
Both schematics show an inclined tunnel from the wastewater plant, the outfall tunnel and a diffuser comprising several risers with outlet nozzles on its top, through which the wastewater is diffused under the water surface (P. Tate-S. Scaturro-B. Cathers, 2016).
In typical submarine outfall tunnel projects in rock foundation, three main construction stages are executed: the underground tunnel, the maritime offshore risers and the underground offtake adits. In terms of schedule, the installation of risers is performed independently from the execution of the underground tunnel (
Usually, the installation of the diffusion risers represents one of the most critical activities; in fact, this is performed through a multistage offshore work (
The connection of the offshore work to the underground work represents a challenging operation: “probe holes are drilled from the tunnel to ascertain the location of the pre-installed risers and to drain the risers of ballast water”, then the offtake adits are excavated to expose the risers (
In typical submarine outfall tunnel projects in soil foundation, three main construction stages are executed: the underground tunnel, the maritime transition shaft and a diffusion pipeline equipped by risers anchored on the waterbody bed.
In terms of schedule, the connection of diffusion tunnel equipped by risers (
Typically, the connection between tunnel and the transition shaft (
In submarine outfall tunnel projects, adopting the solution of the Riser Concept according to the present invention, the construction stages are simplified and in general two main construction stages are executed: the excavation of the tunnel and the construction of the risers from inside the tunnel, both underground (
Then, in the non-limitative embodiments thereof submarine outfall project construction, the adoption of Riser Concept provides several benefits and advantages, such as:
1. Elimination of several works:
2. Elimination of various maritime operations:
3. Attaining a reduction of both construction cost and operational cost:
While a preferred embodiment of the invention has been described using specific terms, such description is for illustrative purposes only, and it is to be understood that changes and variations may be made without departing from the spirit or scope of the following claims.
While a preferred embodiment of the invention has been described using specific terms, such description is for illustrative purposes only, and it is to be understood that changes and variations may be made without departing from the scope of the following claims.
The invention being thus described, it will be obvious that the same may be varied in many ways. Such variations are not to be regarded as a departure from the spirit and scope of the invention, and all such modifications as would be obvious to one skilled in the art are to be included within the scope of the following claims.
This nonprovisional application is a National Stage of International Application No. PCT/IT2018/000071, which was filed on May 16, 2018, and which is herein incorporated by reference.
Filing Document | Filing Date | Country | Kind |
---|---|---|---|
PCT/IT2018/000071 | 5/16/2018 | WO | 00 |