Claims
- 1. A method of manufacturing clinker from mineral raw materials in a kiln comprising the steps of
- (1) preheating the mineral raw material in a suspension preheater by passing a first portion of hot flue gas from the kiln countercurrent to the material in the preheater, and then passing said first portion from the preheater to a flue gas cleaning filter;
- (2) passing the preheated mineral raw material from the preheater to the kiln and burning the preheated raw material in the kiln to form clinker;
- (3) bypassing a second portion of the hot flue gas from the kiln to a quenching chamber, cooling said second portion in said quenching chamber, by introducing into said chamber recirculated, cooled bypass flue gas, so as to cause chlorides, sulfur and alkalis contained in said second portion to condense and solidify;
- (4) passing the bypassed second portion, together with its contents of condensed or solidified chlorides, sulfur or alkalis as a material-gas suspension, upwardly through a gas suspension-absorption reactor, and treating said suspension in said reactor by injecting water and recirculated dust particles into a lower portion of the reactor thereby causing the chlorides, sulfur and alkalis to be dissolved in the water and the water to be dispersed on the dust particles, and thereafter passing the suspension upwardly through the reactor thereby causing the water to evaporate from the dust particles;
- (5) removing the suspension together with the dust particles from the reactor and separating the dust particles from the gas of the second portion in a bypass separator;
- (6) recirculating at least a portion of the dust particles to said reactor in step (4); and
- (7) passing the remainder of the material-gas suspension from said second portion to said flue gas cleaning filter, without passing said remainder to a separate bypass filter, to be cleaned in same together with said first portion and passing the thus cleaned gas portions into the atmosphere.
- 2. A method according to claim 1 wherein the second portion is treated in the reactor at a temperature of about 150.degree. C.
Priority Claims (1)
Number |
Date |
Country |
Kind |
1120/90 |
May 1990 |
DKX |
|
Parent Case Info
This application is a continuation of application Ser. No. 07/697,638, filed on May 2, 1991, now abandoned.
US Referenced Citations (9)
Continuations (1)
|
Number |
Date |
Country |
Parent |
697638 |
May 1991 |
|