Claims
- 1. A method of transporting and housing tunnel workers working in a tunnel work area having a high pressure environment comprising the steps of
- housing said individuals during non-work hours over a plurality of working days in a pressure chamber maintained at an intermediate pressure less than said high pressure environment and greater than atmospheric pressure, and
- transporting said workers between said pressure chamber and a tunnel face bounding said high pressure environment in a pressurized transport chamber.
- 2. The method of claim 1 including the step of
- changing the pressure in said transport chamber during transport between said pressure chamber and said tunnel face, said pressure being changed between said intermediate pressure and said high pressure.
- 3. The method of claim 1 wherein said housing step includes the steps of
- providing sleeping facilities for said workers,
- providing eating facilities for said workers,
- providing sanitary facilities for said workers, and
- providing a means to decompress said workers at the end of said plurality of days.
- 4. The method of claim 1 wherein said plurality of days is at least four days.
- 5. The method of claim 1 wherein said intermediate pressure is less than about 17 psig.
- 6. The method of claim 1 wherein said intermediate pressure is less than about 11 psig.
- 7. The method of claim 1 wherein said intermediate pressure is about half the pressure at the work area.
Parent Case Info
This is a division, of application Ser. No. 843,968, filed Oct. 20, 1977, now U.S. Pat. No. 4,144,801.
US Referenced Citations (7)
Divisions (1)
|
Number |
Date |
Country |
Parent |
843968 |
Oct 1977 |
|