This invention relates to the washing of a cased length of a hydrocarbon production well or water injector well, above the reservoir liner and in particular to a method and apparatus for achieving such washing efficiently and making savings on the amount of time needed for the washing operation.
When a hydrocarbon well, or water injector well is drilled, casing is installed in the upper region of the well and then, normally, a reservoir liner is run into the well on drill pipe equipped with a reservoir liner hanger. Once the reservoir liner hanger is in place, cement is displaced into the reservoir liner and back up the annulus outside the reservoir liner, cementing it in position, and the liner is left filled with drilling mud. At this stage mud is circulated in the casing to remove residual cement, metal swarf, etc. The drill string is removed and a special cleanout string run in to the end of the reservoir liner. The casing and reservoir liner are then washed out with various fluids, and the portion of the casing in which the production packer is to be set is further cleaned with a scraper device. The well is thereby put into a suitable state to be filled with completion fluid and completed. The well cleanout string is relatively delicate since it must be narrow enough to extend through the reservoir liner. Because it is delicate it needs to be run in slowly.
Casing wash tooling is specially designed for the operation. It is designed to be rotated in the well; this is necessary in order to achieve effective washing. Since the well may be highly deviated, the string tends to lie on the lower side of the casing and, in the absence of rotation, only the region above the string will be effectively washed.
The casing wash tooling is also specially designed to carry out a so-called inflow test to check that there is no leakage of fluid from the reservoir liner or into the reservoir or production casing/liner. The casing wash process takes many days with associated cost and it is desirable to reduce this. The process is also risky since the thin cleanout string which passes down the reservoir liner is delicate and easily damaged.
According to the invention a process for washing a wellbore comprises passing a drill string, including a reservoir liner hanger running tool, down a cased wellbore to install a reservoir liner in an uncased distal portion of the wellbore; displacing cement into the reservoir liner annulus by passing completion fluid through the drill string and reservoir liner; without first removing the drill string from the wellbore, performing an inflow test on the reservoir liner; and washing the interior of the casing by passing wash fluid through the drill string and into the casing, whilst rotating the drill string.
Also according to the invention, an apparatus for washing a cased wellbore comprises a drill pipe having an assembly fitted to a distal end thereof, the assembly comprising: a reservoir liner hanger and reservoir liner hanger running tool; and an inflow test tool capable of forming a sealed connection between the drill string and the reservoir liner or reservoir liner hanger, for performing an inflow test on the reservoir liner.
A more complete understanding of the present invention and benefits thereof may be acquired by referring to the follow description taken in conjunction with the accompanying drawings in which:
Turning now to the detailed description of the preferred arrangement or arrangements of the present invention, it should be understood that the inventive features and concepts may be manifested in other arrangements and that the scope of the invention is not limited to the embodiments described or illustrated. The scope of the invention is intended only to be limited by the scope of the claims that follow.
Referring firstly to
At the stage illustrated in
Referring to
An appropriate volume of completion fluid 8 is pumped down the drill string 4 to displace all the cement into the annulus of 3. Cement filling the annulus is shown at 9 in
The drill string 4 is then withdrawn slightly so that its distal end, with the reservoir liner hanger running tool 10, is detached from and right above the reservoir liner hanger 5. This action closes the ball valve 6 by pulling a shifting tool past a shifting profile (a technique for actuating down-hole components which is well known in this field). This state is shown in
The ball valve 6 is actuated by the drill string being withdrawn, and this helps prevent the completion fluid in the reservoir liner from becoming contaminated with solid material from above.
In a modified apparatus and method, the ball valve 6 is not present, nor circulation is started. The inventor believes that the process for cleaning of the upper completion, as described below, is so short (perhaps of the order of 2 hours) that this will give rise to very little, if any, solid material falling into the reservoir liner even if no valve is present. The short time for the cleaning operation means that there may be insufficient time for the drilling mud to heat up appreciably; it is when the drilling mud becomes hot (i.e. is heated to the temperature of the formation which can be around 150 degrees Celsius or more) that solids (e.g. barite) tend to settle out of the mud, so for this reason also the valve 6 may not be necessary. With circulation started any debris from upper part of the well will not permitted entering the reservoir liner 3.
The casing scraper tool (not shown in the drawings) that was previously collapsed in the reservoir liner expands to scrape the production casing string that hosts the reservoir liner hanger 5. The drill string 4 is rotated and/or reciprocated, which causes the scraper tool to scrape clean a portion of the interior of the casing the portion which will receive a production packer at a later stage in the completion of the well.
Drilling mud is continuously circulated, with the drill string rotating, to clean heavy debris from the upper part of the well, above the reservoir liner hanger. Debris such as cement and metal swarf can be removed by the heavy drilling mud. Rotation of the drill string ensures that the entire inner surface of the casing above the reservoir liner hanger is cleaned.
After circulation of mud, the rotation of the string is stopped and an underbalanced fluid is circulated down the drill string. This is shown in
The PBR need not be part of the liner hanger and may alternatively be provided on another part, above or below the liner hanger assembly. PBRs are well known in themselves and their structure and function will be apparent to one of ordinary skill in this field.
Together the inflow seal and PBR provide a temporary seal between the drill string and reservoir liner, isolating the interior of the drill string 4 and reservoir liner 3 from the annulus between the drill string and casing 2.
Once the seal between the drill string and PBR/reservoir liner is engaged, the underbalanced fluid causes the reservoir liner to be underbalanced to the reservoir allowing the inflow test of the reservoir liner.
The underbalanced fluid in the drill string is created by displacing some of the mud in the string with a light oil or base oil, shown at 13 in
In an alternative method, which saves time but is less safe because the degree of underbalance cannot be controlled, the mud in the drill string is simply displaced to completion fluid and the inflow test then done.
After the inflow test, the inflow seal is disengaged from the PBR and the underbalanced fluid in the drill pipe is circulated out of the well. The upper part of the wellbore is washed with a wash train comprising a sequence of different fluids as is well known in this field. During this process the drill string is rotated. Rotation of the drill string throughout the washing provides for efficient displacement. The casing scraper tool may be employed again (or alternatively for the first time) at this point in the process. Reciprocation of the drill string causes the scraper to scrape the casing where the production packer for the upper completion will be placed and set after the drill string is retrieved.
Finally the upper part of the wellbore is displaced to completion fluid 8 and the drill string withdrawn. This is shown in
The process described avoids the running of a separate cleanout string either to clean the reservoir liner or to clean out the upper part of the wellbore. Several days of rig time can be saved as well as avoiding the hazardous process of running a narrow cleanout string into the reservoir liner, which is prone to failure by buckling.
In closing, it should be noted that the discussion of any reference is not an admission that it is prior art to the present invention, especially any reference that may have a publication date after the priority date of this application. At the same time, each and every claim below is hereby incorporated into this detailed description or specification as a additional embodiments of the present invention.
Although the systems and processes described herein have been described in detail, it should be understood that various changes, substitutions, and alterations can be made without departing from the spirit and scope of the invention as defined by the following claims. Those skilled in the art may be able to study the preferred embodiments and identify other ways to practice the invention that are not exactly as described herein. It is the intent of the inventors that variations and equivalents of the invention are within the scope of the claims while the description, abstract and drawings are not to be used to limit the scope of the invention. The invention is specifically intended to be as broad as the claims below and their equivalents.
This application is a non-provisional application which claims benefit under 35 USC § 119(e) to U.S. Provisional Application Ser. No. 62/591,025 filed Nov. 27, 2017, entitled “METHOD AND APPARATUS FOR WASHING AN UPPER COMPLETION,” which is incorporated herein in its entirety.
Number | Name | Date | Kind |
---|---|---|---|
4595058 | Nations | Jun 1986 | A |
5282509 | Schurr, III | Feb 1994 | A |
6408945 | Telfer | Jun 2002 | B1 |
20030201102 | Mackenzie | Oct 2003 | A1 |
20040177967 | Hirth | Sep 2004 | A1 |
20070246217 | Tulloch et al. | Oct 2007 | A1 |
20120055681 | Telfer | Mar 2012 | A1 |
20120175108 | Foubister | Jul 2012 | A1 |
20160102523 | Sponchia et al. | Apr 2016 | A1 |
20160326807 | Jerez et al. | Nov 2016 | A1 |
20180252069 | Abdollah | Sep 2018 | A1 |
20180258738 | Ian | Sep 2018 | A1 |
Number | Date | Country |
---|---|---|
20140168485 | Oct 2014 | WO |
Entry |
---|
International Search Report PCT/US2018/061957, dated Feb. 4, 2019, 3 pgs. |
Number | Date | Country | |
---|---|---|---|
20190162049 A1 | May 2019 | US |
Number | Date | Country | |
---|---|---|---|
62591025 | Nov 2017 | US |