This application is a §371 National Stage Application of PCT International Application No. PCT/FI2012/050606 filed Jun. 14, 2012 claiming priority of FI Application No. 20115587, filed Jun. 11, 2011.
The invention relates to a method for preparing a charging plan for excavation of a rock cavern, the method comprising determining in advance at least drill hole locations in a pre-determined coordinate system for a round to be drilled into the rock cavern and creating a charging plan for the holes in the round by means of a computer-aided design program for blasting the round.
The invention further relates to an arrangement for designing a charging plan for excavating a rock cavern with a rock drilling apparatus comprising one or more drilling booms having a rock drilling unit attached to it and a control unit for controlling the drilling comprising a computer, whereby at least locations of drill holes in a predetermined coordinate system has been defined in advance for a round to be drilled which arrangement comprises a computer with the computer assisted design program for designing the charging plan.
Tunnels, underground storage silos and other rock caverns are excavated in rounds. In a tunnel or other part of a rock cavern, drill holes are drilled, and then charged and blasted after the drilling. One blast detaches from the rock an amount of rock material that equals that of one round. For excavating a rock cavern, a plan is made in advance and information about the rock type, for example, is determined. In general, the orderer of the rock cavern also sets various quality requirements for the cavern to be excavated.
When tunnel drilling is performed by a rock drilling apparatus provided with instrumentation, there is generally designed, as office work, a drilling plan for drilling a round and a charging plan for blasting the round. The drilling plan and the charging plan are supplied to the rock drilling apparatus for being used by means of its control computer. The drilling plan serves as a controlled instruction for drilling drill holes in the rock in such a manner that a desired round can be formed.
The successfulness of drilling and charging is measured, inter alia, by pull-out per round, which refers to the ratio of advance of the tunnel after a blast to a designed length in the drilling plan. Improvement of pull-out from 88 to 95 percent, for instance, means significant cost savings in an excavation project. In practice, defining an optimal pull-out is aimed at by changing the drilling plan or the charging plan. Examples of parameters applied in changing the charging plan include distances between the drill holes, specific charge, charging degree, blast cut in different areas of the plan.
For designing a charging plan there are developed design programs that assist the designer in composing the charging plan. Designing a charging plan is thus an interactive action between the designer and the design program.
Production of drilling plans and continuous design, as well as review of plans during tunnel work, have been developed in various ways in view of blasting techniques, for instance. This is presented in publication WO 2008/078001, for instance.
In practice, in round blasting it has been found that even though the hole locations and the size and amount of blasting charges are dimensioned as well as possible on the basis of the known facts, the outcome of the blast does not, however, meet the planned design. Typically, when detached material is removed after the blast, it may be found that the remaining rock surface deviates significantly from the theoretical surface that should have been created after the blast. This may result from a plurality of different factors, such as fracturing properties or hardness of rock, or some other factor that cannot have been known in advance with a sufficient accuracy. As a consequence, however, the efficiency of excavation deteriorates and this, in turn, causes quite significant additional costs.
The object of the present invention is to provide a method and an arrangement for producing drilling plans in which conditions are taken into account better than before, and consequently, a tunnel may be excavated more efficiently and more accurately than previously. The method of the invention is characterised by determining, in connection with hole drilling, the location of an end for at least some of the holes; storing the determined locations of hole ends in a memory; determining pull-out of a round on the basis of the locations of the determined hole ends and the topography of rock remaining after a round blast and designing or modifying the charging plan of a subsequent round on the basis of the thus determined pull-out.
The arrangement of the invention is characterised in that the arrangement comprises means for locating the location of the actual ends for at least some of the holes, means for storing the determined locations of the hole ends in a memory and means for determining the topography of the rock remaining after the round blast and whereby the pull-out of the blasted round can be defined on the basis of the defined end locations of the drill holes and the topography of the rock remaining after the blasted round and the charging plan may be designed or modified on the basis of the thus defined pull-out.
The idea of the invention is that in designing a charging plan for one or more subsequent rounds, the differences between the locations of drill hole ends of a last-blasted round and the locations of starting points of new holes to be drilled are taken into account. Further, the idea is that the charging plan is modified on the basis of these differences.
An advantage of the invention is that by taking into account the deviations from the plan appearing in the last-blasted round after the blasting, a more appropriate and more efficient charging plan for subsequent rounds is achieved, which will subsequently increase pull-out per round and thus improves the efficiency of the entire tunnelling process and reduces costs. Hence, changes in rock properties may be taken into account better than before in the operation as a whole.
Some embodiments of the invention will be explained in greater detail in the attached drawings, in which
In the figures, some embodiments of the invention are shown simplified for the sake of clarity. Like reference numerals refer to like parts in the figures.
Typically, a drilling plan and an excavation profile taking into account the charging plan are created for each round. In the drilling plan, the locations of the holes to be drilled are defined in a predetermined coordinate system. The locations of the holes to be drilled may be determined either as the starting points, directions and lengths thereof in said coordinate system, or merely as starting and ending points, on the basis of which their length and direction are correspondingly determined in the coordinate system. The charging plan, in turn, defines hole-specifically the explosive to be used, size of a charge, timings for blasting the charges, etc.
The drilling plan is normally designed at premises outside the drilling site, such as an office 9, with a design computer 21, on the display 22 of which the drilling plan 12 is shown when created or viewed, for instance. From the design computer 21 the drilling plan may be downloaded and stored in a memory means, such as a memory stick or diskette, or it may be transferred directly to a control unit 8 of the rock drilling apparatus over a data transmission connection 10 and stored in a memory means typically existing in the control unit, such as a hard disk or memory diskette. If necessary, the designing and modifying of the drilling plan 12 may also take place by means of the control unit 8 in a cabin 11 of the rock drilling apparatus 1, for instance. Further, the existing drilling plans may be modified either at the drilling site or outside it. The designing of the drilling plan is computed-aided and generally iterative in nature. A design program is executed on the design computer 21, the computer of the control unit 8 or the like, and the designer 23 operates interactively with the design program, entering necessary data, making selections as well as controlling the design process. The already designed parts of the plan may further be iteratively modified during the design process in order to achieve a better outcome. Correspondingly, on the basis of the hole locations determined in the drilling plan and the locations of their ends, a charging plan may be drawn up by a computer-aided design program for blasting a round. A person skilled in the art is familiar with the preparing of charging plans, and therefore it is not necessary to describe it in any greater detail.
The drilling plan being completed, it may be downloaded to the control unit 8 of the rock drilling apparatus and executed. The designed drill holes are drilled into the rock 24, charged and then blasted. A quantity of rock equal to that of a desired round is broken off the rock 24 and removed by transportation. New holes are then drilled for the next round, in accordance with the same or a new drilling plan 12.
The figure shows how the holes 13 are located with respect to the rock to be drilled transversally to the tunnel at appropriate intervals and in different directions from the viewpoint of excavation. In general, the basis used for the drilling plan is a so-called navigation plane 27, which is an imaginary plane in the transversal direction of the tunnel at a distance from the actual rock surface 28. In the drilling plan, the theoretical starting points 29 of the holes to be drilled are determined in the coordinate system to be on the navigation plane, and the orientation of booms in the rock drilling apparatus is performed in such a manner that a drill rod passes through that point when the drilling starts.
The nominal length of the round 26 is the distance L between the navigation plane 27 and a theoretical ending plane 30. In reality, as appears in the figure, some of the holes extend beyond the ending plane and others, typically those in the edge parts, remain shorter than the length of the round.
In
The idea of this invention is to amend the charging plan for subsequent rounds in such a manner that on the basis of the blast outcome of an implemented round the charging plan to be used in the drilling of one or more subsequent rounds will be modified and optimized.
In current practice, the drill holes are drilled according to the designed plans, irrespective of the location where the actual starting point of the hole is. So, because of the extra rock the actual starting point of the hole deviates from the theoretical starting point without it having any effect on the design and implementation of the drilling plan or the charging plan. According to this invention, the charging plan is corrected, when necessary, on the basis of the realized outcome. So, for instance, charging, such as charge sizes, quality of explosives etc., may be modified already in connection with a next round, in order that the blast outcome would better correspond to what is desired.
The basis for the modification of the charging plan consists of the surface topography of rock determined at the start of hole drilling for a new round and the locations of the drill hole ends in the rock of the blasted round. The surface topography of rock, i.e. its profile is obtained by measuring it accurately with a measuring device, such as a laser or ultrasound measuring device. Alternatively, it may be determined approximately, with a sufficient precision, by determining the starting points of the drill holes for the next round on the surface of the rock. The determination may be performed either by measuring them with a separate measuring device known per se or by determining the location data by means of the control unit of the rock drilling apparatus. The location data of the starting points of the holes may be measured either before, during or after drilling. Correspondingly, the location data of the drill hole ends are provided either by measuring them with a separate measuring device or by determining them by means of the control unit of the rock drilling apparatus. According to desired accuracy, it is possible to determine the location data of the starting and ending points of all holes or just the location data of suitably selected holes.
By means of the thus determined surface topography of the rock and the location data of the determined hole ends it is possible to calculate the pull-out of a preceding round and, if so needed, to amend the charging plan for a next round or any subsequent round in the above-described manner.
When the control unit of the rock drilling apparatus is used, the determination is implemented, in practice, in such a way that when the operator, such as driller, starts drilling a hole, he moves the boom of the rock drilling apparatus to a correct drilling position with respect to the hole to be drilled, whereby the device sensors can measure the starting point of hole in the drilling direction. This information is stored in the control unit of the drilling apparatus, and on the basis of this information and the actual location data of a corresponding, earlier drilled hole is calculated the difference between these points. When this procedure is carried out for all holes or the selected holes in the drilling plan, it is also possible to calculate how much rock, and the amount of rock at each particular point of the transversal surface of the tunnel that remains undetached as compared to the drilling plan.
This principle, either by means of the computer on the drilling apparatus or by transmitting data the to a computer outside the rock drilling apparatus for use by a charging plan designer not on site, allows the necessary modifications to be determined in the charging plan for a next round, so that in the next round blast rock material could be broken and detached from the rock in better compliance with the plan. The charging plan having been defined on the basis of said differential data, it is immediately available to the control computer of the rock drilling apparatus, or it is transmitted to the control computer of the rock drilling apparatus for use.
A change in the charging plan may be implemented immediately in connection with the drilling of a round following the blast of a previous round, yet, in practice, it is also useful when employed for correcting the charging plan of a round subsequent to the next round. In practice, measuring, separate from the drilling device, could be performed by a laser scanner, which stores the surface profile throughout the entire surface and does not concentrate in any way on the starting points of the holes to be drilled. Laser scanning as such is an operation taking only minutes, and therefore it does not slow down the work in any way whatsoever.
In some cases, features disclosed in this application may be used as such, regardless of other features. On the other hand, when necessary, features disclosed in this application may be combined in order to provide various combinations.
The drawings and the related description are only intended to illustrate the idea of the invention. Details of the invention may vary within the scope of the claims.
Number | Date | Country | Kind |
---|---|---|---|
20115587 | Jun 2011 | FI | national |
Filing Document | Filing Date | Country | Kind | 371c Date |
---|---|---|---|---|
PCT/FI2012/050606 | 6/14/2012 | WO | 00 | 12/18/2013 |
Publishing Document | Publishing Date | Country | Kind |
---|---|---|---|
WO2012/172181 | 12/20/2012 | WO | A |
Number | Name | Date | Kind |
---|---|---|---|
3721471 | Bergmann | Mar 1973 | A |
4979575 | Strom et al. | Dec 1990 | A |
6293355 | Koivunen et al. | Sep 2001 | B1 |
6957707 | Koivunen | Oct 2005 | B2 |
7707939 | Brent | May 2010 | B2 |
9194224 | Muona | Nov 2015 | B2 |
9389055 | Brent | Jul 2016 | B2 |
20020036102 | Ahtola et al. | Mar 2002 | A1 |
20040216922 | Koivunen | Nov 2004 | A1 |
20080245254 | Brent | Oct 2008 | A1 |
20100044107 | Keskinen | Feb 2010 | A1 |
20100286965 | Saleniemi et al. | Nov 2010 | A1 |
20110100711 | Puura et al. | May 2011 | A1 |
20130152812 | Brent | Jun 2013 | A1 |
20140139007 | Muona | May 2014 | A1 |
Number | Date | Country |
---|---|---|
101512102 | Aug 2009 | CN |
101663463 | Mar 2010 | CN |
101802346 | Aug 2010 | CN |
101910546 | Dec 2010 | CN |
0760419 | Mar 1997 | EP |
2002188389 | Jul 2002 | JP |
2005220627 | Aug 2005 | JP |
2003025341 | Mar 2003 | WO |
2008078001 | Jul 2008 | WO |
2008078002 | Jul 2008 | WO |
2008125735 | Oct 2008 | WO |
2009037381 | Mar 2009 | WO |
Entry |
---|
Sandvik Mining and Construction, “iSURE, a revolution in precision”, Julkaisuaika Dec. 30, 2010, Haettu internetosoitteesta. |
Sandvik Mining and Construction, “iSURE” [online-tiedote]. Julkaisuaika Dec. 30, 2010 Haettu internetista. |
Number | Date | Country | |
---|---|---|---|
20140137759 A1 | May 2014 | US |