Claims
- 1. A process for laying synthetic underground piping, according to which a ground channel is bored and the piping introduced thereinto, whereby the piping, comprising a hardening synthetic mass, is manufactured at the same time as it is being introduced into the ground channel, in that the prepared synthetic mass is continuously formed inside the ground channel as a run of piping and left to harden, characterised in that the ground channel is first bored and then the pipe length is introduced into the prepared ground channel and in that the run of piping is formed inside the ground channel, keeping clear an annular gap relative to the ground channel walls for backfilling with support liquid.
- 2. Apparatus for carrying out the process as claimed in claim 1, chaiacterised in that it comprises a reactor (4), which can be drawn through the ground channel (2) and comprises a front reactor drum (5) and a rear double-sheathed calibrating cylinder (6), the reactor drum (5) and calibrating cylinder (6) being arranged coaxially to one another and being rotatable relative to each other, and lines (8) for supply of constituents terminate in a reactor chamber (51) of the reactor drum (5), and the reactor chamber (51) is connected by way of a nozzle ring (12) to a calibrating space (11) open at an end remote from the reaction chamber and defined by a double mantle (10) of the calibrating cylinder (6).
- 3. Apparatus as claimed in claim 2, characterised in that the reactor drum (5), which rotates as the reactor (4) is being drawn through the ground channel (2), comprises mixing tools (9) projecting into the reactor chamber (51).
- 4. Apparatus as claimed in claim 2, characterised in that the reactor comprises an end piece (16) which can be joined detachably to the calibrating cylinder (6), said end piece (16) sealing off the calibrating space (11) and comprising a ventilation device (18) which can be anchored torsionally in the inlet vicinity (E) of the ground channel (2).
- 5. Apparatus as claimed in claim 2, characterised in that the double mantle (10) of the calibrating cylinder (6) can be heated with insulation of the reactor drum (5).
Priority Claims (1)
Number |
Date |
Country |
Kind |
1236/98 |
Jul 1998 |
AT |
|
CROSS REFERENCE TO RELATED APPLICATIONS
Applicant claims priority under 35 U.S.C. §119 of Austrian Application No. A 1236/98 filed Jul. 17, 1998. Applicant also claims priority under 35 U.S.C. §365 of PCT/AT99/00157 filed Jun. 17, 1999. The international application under PCT article 21 (2) was not published in English.
PCT Information
Filing Document |
Filing Date |
Country |
Kind |
PCT/AT99/00157 |
|
WO |
00 |
Publishing Document |
Publishing Date |
Country |
Kind |
WO00/04314 |
1/27/2000 |
WO |
A |
US Referenced Citations (6)
Number |
Name |
Date |
Kind |
3349568 |
Smith et al. |
Oct 1967 |
A |
4088720 |
Kostvlev et al. |
May 1978 |
A |
4148193 |
Mottes |
Apr 1979 |
A |
4652174 |
Cornely et al. |
Mar 1987 |
A |
4915541 |
Thompson et al. |
Apr 1990 |
A |
4956032 |
Hahn et al. |
Sep 1990 |
A |
Foreign Referenced Citations (2)
Number |
Date |
Country |
33 17 025 |
Aug 1984 |
DE |
38 36 440 |
May 1990 |
DE |