Claims
- 1. In a reactor operated in accordance with operationally dependent input parameters, a method of operating the reactor which is unstable as a result of an oscillation of an internal physical variable, which comprises:
- measuring the physical variable by detecting a first oscillation peak of the physical variable, detecting the physical variable during a first oscillation period following the first oscillation peak, by subsequently detecting at least a second oscillation peak of the physical variable, and detecting the physical variable during at least a second oscillation period following the at least second oscillation peak and calculating at least one measured value for a rate of increase of the oscillation peaks detected during the first and the at least second oscillation periods by calculating a difference between the first oscillation peak of the physical variable and the at least second oscillation peak of the physical variable; and
- after the first and the at least second oscillation periods, deciding, in dependence on the measured value, whether a reactor operation is to be continued for a given number of oscillation periods with unchanged input parameters.
- 2. The method according to claim 1, which comprises defining a noise limit value and a threshold value for the oscillations higher than the noise limit value, and performing the calculating step after extreme values of the oscillation have exceeded the noise limit, and performing the deciding step only after the extreme values have exceeded the threshold value.
- 3. The method according to claim 1, which comprises defining a threshold value as a function of the measured value of the rate of increase of the oscillation, and intervening in an operational control of the reactor if extreme values of the oscillation exceed the threshold value.
- 4. The method according to claim 1, which comprises defining a threshold value for the rate of increase and initiating a stabilization strategy if the rate of increase exceeds the threshold value.
- 5. The method according to claim 1, which comprises defining a number of oscillations in dependence on the rate of increase, and intervening in a control of the reactor only if the oscillation of the physical variable persists for the number of oscillations.
- 6. The method according to claim 1, which comprises defining a plurality of stabilization strategies, each in dependence on a given rate of increase.
- 7. The method according to claim 6, wherein the defining step includes defining a low-ranking alarm stage stabilization strategy, which comprises intervening in the control of the reactor by preventing an increase in reactor power and blocking a removal of absorber elements from the reactor core.
- 8. The method according to claim 6, wherein the defining step includes defining stabilization strategies in variously ranked alarm stages including a first higher-ranking alarm stage, the first higher-ranking alarm stage intervention strategy comprising reducing a reactor power by slowly inserting absorber elements into the reactor core.
- 9. The method according to claim 6, wherein the defining step includes defining stabilization strategies in variously ranked alarm stages including a second higher-ranking alarm stage, the second higher-ranking alarm stage intervention strategy comprises rapidly inserting a plurality of control rods into the reactor core.
- 10. The method according to claim 6, wherein the defining step includes defining stabilization strategies in variously ranked alarm stages including a highest-ranking alarm stage, the highest-ranking alarm stage intervention strategy comprising reducing a power of the reactor to zero as rapidly as possible.
- 11. The method according to claim 1, which comprises combining a plurality of regions distributed over the reactor core into a system, and wherein the measuring and calculating steps comprise ascertaining a respective local measured value and a measured value for the rate of increase in each region of the system, and preliminarily deciding, with the measured values for each region, whether a stabilization strategy is to be initiated, and initiating the stabilization strategy only after a corresponding decision has been made in a minimum number of preliminary decisions.
- 12. The method according to claim 11, which comprises performing the preliminarily deciding step redundantly for a plurality of different systems made up of regions distributed over the reactor core, and blocking the stabilization strategy so long as a decision in favor of initiating the stabilization strategy has not been taken in a predefined minimum number of systems.
- 13. The method according to claim 12, which comprises assigning the regions to the systems in such a way that adjacent regions belong to mutually different systems, and each region belongs to only one system.
- 14. The method according to claim 11, which comprises providing a plurality of sensors in each region for ascertaining the measured values, and utilizing in each region only a predefined minimum number of the sensors in the deciding step.
Priority Claims (1)
Number |
Date |
Country |
Kind |
195 00 395 |
Jan 1995 |
DEX |
|
CROSS-REFERENCE TO RELATED APPLICATION
This divisional application claims the benefit of U.S. application Ser. No. 08/890,258, filed on Jul. 9, 1997, now U.S. Pat. No. 5,875,221, issued Feb. 23, 1999.
This application is a continuation of copending international application PCT/DE96/00014, filed Jan. 8, 1996.
US Referenced Citations (3)
Number |
Name |
Date |
Kind |
5174946 |
Watford et al. |
Dec 1992 |
|
5225149 |
Banda |
Jul 1993 |
|
5406598 |
Takeuchi et al. |
Apr 1995 |
|
Foreign Referenced Citations (2)
Number |
Date |
Country |
0 496 551 A1 |
Jul 1992 |
EPX |
0 520 712 A1 |
Dec 1992 |
EPX |
Non-Patent Literature Citations (5)
Entry |
International Publication No. WO 93/07623 (Banda), dated Apr. 15, 1993. |
Patent Abstracts of Japan No. JP 60-94882 (Tomoaki), dated Apr. 8, 1994. |
Patent Abstracts of Japan No. JP 62-075295 A (Jigyo), dated Apr. 7, 1987. |
Patent Abstracts of Japan No. JP 60-159691 A, dated Aug. 21, 1985. |
Patent Abstracts of Japan No. JP 59-196499 A, dated Nov. 7, 1984. |
Divisions (1)
|
Number |
Date |
Country |
Parent |
890258 |
Jul 1997 |
|
Continuations (1)
|
Number |
Date |
Country |
Parent |
PCTDE9600014 |
Jan 1996 |
|