The invention relates to the oil and gas production industry, in particular, to development and production of oil reservoirs with various permeability zones, specifically, with lateral holes and lateral horizontal holes, drilled from the production casing.
From the previous art it is known the “Downhole dual-completion system for operation of Several Production Zones” (RU 59139, U1), comprising a tubing string, forming stages with one or more packers and one or more adjustable choking device; besides, every stage of the system has adjustable choking devices with automatic remote control and control and measurement instruments with automatic remote control; furthermore, every stage of the facility is provided with, at least, one electroconductive cable, upper end of which is connected to the remote control unit at the ground surface, and the lower end is connected to the above-mentioned choking devices and control measurement instruments, and the packers are equipped with a connector and/or a sealing device for the cable.
This device is a means of realization of a dual completion method for production from multi-zone wells, including running-in of a tubing string with one ore more packers to isolate the formations, adjustable chocking devices to control the production flow rate, and the control and measurement devices with automatic remote control from the surface through the electroconductive cable, in which production is conducted in accordance with operational parameters of every zone, determined with the control and measurement devices, by way of changing passage area of the chocking devices.
This prior art device and the method of its application have the following disadvantages:
The closest to the present invention by its technical essence is a “Method of multi-zone wells operation using dual completion systems” (RU 2313659 C1), consisting in running-in of at least one tubing string of a permanent or variable diameter with open/plugged-up lower end, provided with one or more packers, installed between the formations or between/above the formations, to isolate the formations, and with a control device to control the production flow rate, besides, the tubing string or the control device at the pay interval are equipped with a measuring transducer to transfer the obtained measurement data to the wellhead and to determine the production performance, which is achieved by running-in a cable or a control line inside/outside the casing, and connect it to the measuring transducer or the device control device, or both of them (of removable type); further, after installing wellhead equipment, the fluid is produced, being passed through the device control device and the measuring transducer, and the measurement information from the measuring transducer is obtained at the wellhead, and fluid technological parameters during production are determined; in case said parameters differ from the design values, the passage area of the control device is changed until fluid production for each zone will be obtained. Moreover, a measuring transducer is provided with an interface to save the measured operational parameters data. Furthermore, the measuring transducer is made in form of a pressure/differential pressure gage, temperature/temperature gradient sensor, a flowmeter, or displacement/mass flowmeter. Besides, the control device is made in form of electric, electromagnetic or a pulse valve with a gate, degree of opening of which is controlled from the wellhead by way of sending a signal or an impulse via the cable or a control line.
To implement the method, a device is used, comprising a tubing string with one or more packers and one or more control devices, in which the tubing string or the control device is provided with a measuring transducer with an interface, and a cable or a control line.
The disadvantages of said device and its realization method are:
The technical objects of the invention: expanding the technological capabilities of the devices in wells with various permeability zones, including wells with lateral horizontal holes, due to production from the wells with low-permeable and medium-to-high-permeable intervals by two channels with controlled from the surface production regime for each type of isolated from each other zone; and, reduction of equipment installation costs due to usage of control devices, measuring transducers and a cable in the vertical wellbore.
Said technical object is attained by he method, including running into the well of a tubing string with a cable, control devices in form of electrical valves, measuring pressure and temperature sensors, and one or more packers for isolation of the downhole space, in which information from the sensors is passed to the measurement unit on the wellhead, and signals for opening/closing of the control devices are transferred from the wellhead control unit by the cable; delivery of the wellstream to the surface is performed with a pump through the tubing interior.
The novelty of the invention consists in the fact a well is constructed with a horizontal section, penetrating various permeability zones of the formation, and the packers are installed in the horizontal section of the well to isolate these zones of various permeability, the tubing interior is isolated by a plug, above which the upper and lower control devices are located one above the other in a vertical hole, provided with measurement sensors; further, zones of the same/approximately the same permeability are connected to form two streams communicated with downhole space and inlet of the upper control device or tubing interior and inlet of the lower control device; outlets of the control devices are connected to the pump inlet, and degree of opening of the control devices is controlled by the same cable with frequency separation, by which data from the measurement sensors are also transferred, and opening degree of each control device is determined by these data.
Technical problem for implementation of the method is solved also with the device, comprising a tubing string with a cable, control devices in form of electric valves, measurement pressure and temperature sensors, and one or more packers, shutting-off the downhole space; besides, the sensors are connected with a wellhead measurement unit, and the control devices are connected by the cable with a control unit; moreover, a pump for delivering the wellstream up to the surface through the tubing interior is installed above said control devices.
What is new is that a well is provided with a horizontal section, passing through the reservoir with various permeability zones, and the packers are installed in the horizontal section, separating said various permeability zones; tubing interior is isolated with a plug, above which the upper and lower control devices are installed one above the other, located in a vertical hole and equipped with measurement sensors; inlet of the lower control device communicates with the tubing interior below the plug, and its outlet communicates with the tubing interior above the plug; inlet of the upper control device communicated with the downhole space, and its outlet communicates with the tubing interior above the plug, to which also the pump inlet is connected; the packer-isolated downhole spaces of the same or almost the same permeability are broken in two groups, each of which is connected to the tubing interior or the downhole space by means of one or several conduits; the sensors and the control devices are connected with the same cable to the measurement unit and to the control unit, correspondingly; besides, each control device is located in a housing of a gearmotor, the rotating shaft of which is connected by means of a screw-nut connection, with a tappet and a valve, made to provide hermetically sealed contact with a valve seat, below which a sleeve is installed with the inlet made in form of channels, in which a compensation chamber with flexible walls is located; the chamber is filled with lubricating fluid and communicates with internal space of the tappet and sealed space above the tappet.
The device for zonal isolation and management of reserves drainage through a horizontal well 1 (
Horizontal section of the well 1 passes through the formation 16 with various permeability zones A and B; in accordance with geophysical survey data, the formation 16 is isolated with the packers 9 into the intervals of low permeability A and of medium/high permeability B. Moreover, the tubing interior 15 is isolated by a plug 17, above which, one above the other, upper 4 and lower 5 control devices are located; said devices are installed in the vertical section 18 of the well 1 and provided with measurement sensors 7, 8.
Inlet ports 19 (
Besides, each control device 4 or 5 is made as an electric motor 29 with a gearbox 30 positioned in the housing 28 (
The above-mentioned method is realized in the following way:
A horizontal well 1 is drilled in the formation 16 (
On the basis of the data, transmitted by the sensors 7, 8 to the measurement unit 11 at the wellhead 12 of the well 1, they determine corresponding pressure and temperature of each oil production stream. Depending on the data, received from the wellhead control unit 13, the signals of the corresponding frequency are sent through the cable 3 for opening/closing of the corresponding control device 4 or 5. Delivery of the well 1 fluid up the wellhead 12 is performed by the pump 14 by the tubing interior 15.
Monitoring of the data, obtained by the sensors 7, 8, is carried out permanently. If necessary, the passage area of the valves 6 of the control devices 4 is changed. For example, to increase oil production rate of the intervals A of the well 1, it is necessary to open the valve 6 of the upper control device 4. For this purpose, a signal is sent from the control unit 13 at the wellhead 12 of the well 1 through the cable 3 to the control device 4. Upon this, the electric motor 29 (
To avoid borehole pressure loading on screw-nut connection 32 (
The lower control device 5 (
Thus, application of the invention makes it possible to expand operational capabilities of production from horizontal wells, simultaneously including low-permeable and medium/high-permeable intervals of various geophysical properties, separated by packers, via two independent streams by means of conduits, connecting them and coming through the packers, with surface controlled regime of production from each separated zone. Moreover, location of the control devices, measurement sensors and a cable in the vertical section of the well provides for reduction of the equipment installation costs and improvement of quality and reliability of the installation.
Number | Date | Country | Kind |
---|---|---|---|
2012100083 | Jan 2012 | RU | national |