The present invention relates to a method and a stimulation sleeve for well completions in a subterranean wellbore. The stimulation sleeve comprises a housing having a through channel with a first end and a second end, and one or more flow ports, and a sliding sleeve disposed axially movable within the housing to open or close said flow ports, wherein said sliding sleeve is equipped with at least a first seat for receipt of an obturator to partially or fully close fluid communication in the through channel of the housing.
The present invention relates to the field of construction of wells that access subterranean hydrocarbon-bearing formations, where the productivity of such wells is improved by hydraulic stimulation of multiple sections of the wellbore.
The hydraulic stimulation treatment may for instance take the form of hydraulic fracturing, where stimulation fluids are directed from the wellbore to the formation above the formation fracture gradient; or matrix stimulation, where stimulation fluids are directed from the wellbore to the formation below the formation fracture gradient.
For both hydraulic stimulation techniques, especially in horizontal wells with long sections of the wellbore within the formation, also known as the reservoir section, it is desirable to divide the reservoir section into multiple short compartments that can be accessed sequentially during the stimulation operation. Sequentially targeting short compartments of the reservoir section allows the operator to better control over where the stimulation fluids are entering the formation, resulting in better production contribution across the entire reservoir section after the stimulation.
The present invention provides a system and method for sequentially targeting single entry points for stimulation fluids to access the formation.
The present invention enables a sequential stage treatment of the entire wellbore, one sliding sleeve at a time, without requiring any type of intervention between stages. In addition, this invention does not result in barriers or restrictions that must be removed following the final treatment stage. The invention ensures that wellbore and stimulation fluids are directed to individual entry points one at a time.
Current methods of sequentially targeting short compartments, also known as stages, of the reservoir section are designed to target the deepest compartments first, and subsequently targeting shallower compartments. These methods require pumping operations to stop after stimulation of each stage. Before the next stage treatment, the previous one must be isolated to prevent stimulation fluids from entering the already-treated entry points.
In the case of plug-and-perforated well designs, isolation is achieved by using wireline to intervene in the wellbore to set a bridge plug above the previously treated compartment, and then new perforation clusters are placed above the bridge plug to create the entry points for the next stimulation stage.
In the case of ball or obturator-operated sliding sleeve well designs, each stage consists of sliding sleeves which are ported to provide entry points for wellbore fluids to enter the formation. The sliding sleeves begin in a closed position, where the ports are isolated and do not allow a fluid path between the wellbore and the formation. The sliding sleeves are opened by dropping an obturator into the wellbore and pumping it down to the location of the sleeves. Each sleeve has a seat which matches in size to the obturator that is dropped. When the obturator contacts the seat, hydraulic pressure is applied to the wellbore above the obturator and differential pressure across the obturator drives the sleeve down to expose the ports and allow fluid to enter the formation. To target individual compartments with obturator-operated sliding sleeves, different combinations of obturator and seat dimensions must be used for each stage. Smaller obturator and seat dimensions are used for the deepest stage, with sequentially larger obturator and seat dimensions for subsequent stages. Isolation between stages is achieved when the obturator lands in a seat between the stages. Both of the well designs described above result in a well with multiple barriers or restrictions that must be removed by wireline or coiled tubing intervention after the final stimulation stage is complete.
A third well design utilizes coiled tubing-operated sliding sleeves and eliminates the resulting restrictions; but this technique requires coiled tubing to remain in the wellbore during the stimulation, which introduces significant risk to the operation, especially as the number of compartments is increased.
WO 2015/039697 A1 relates to system and method for delaying actuation using a destructible impedance device. In one embodiment, a delayed actuating system can comprise a base pipe comprising a first portion of an orifice, a sliding sleeve around the base pipe, the sliding sleeve comprising a second portion of said orifice, further said sliding sleeve manoeuvrable into a first position, wherein said first portion of said orifice rests at least partially over said second portion of said orifice, a second position, a distance away from said second position. Further, the delayed actuating system can comprise a biasing device biasing the sliding sleeve toward the second position, and a destructible impedance device at least partially inside said orifice, the destructible impedance device preventing the sliding sleeve from leaving the first position.
US 2017/058642 A1 disclose a catch-and-engage tool conveyed with a well casing for use in a wellbore comprising an outer housing having flow ports therethrough, a functioning apparatus disposed within the outer housing comprising a movable member/sleeve and a holding device, a blocking apparatus disposed within the outer housing comprising a blocking member configured to block one or more flow ports in a first position, a seating apparatus positioned upstream of the blocking apparatus configured to form a seat in the tool. When a ball deployed into the well casing passes through the tool in a downstream direction and moves back in an upstream direction, the restriction element engages onto the holding device and moves the movable member such that a port in exposed to uphole pressure and the blocking member travels to a second position in a reverse direction unblocking flow ports and enabling fluid communication to the wellbore.
US 2012/234545 A1 disclose a valving system including a tubular and a sleeve slidably engaged with the tubular having a seat thereon. The sleeve is configured to occlude flow from an inside of the tubular to an outside of the tubular when in a first position, allow flow between an inside of the tubular and an outside of the tubular at a first location upstream of the seat and a second location downstream of the seat when in a second position, and allow flow between an inside of the tubular and an outside at the tubular at the first location and not the second location when in a third position. The valving system also includes a disappearing member in operable communication with the tubular and the sleeve configured to prevent movement of the sleeve to the third position until disappearance thereof.
It is an object to enable sequential stage treatment of the entire wellbore, one sliding sleeve at a time, without requiring any type of intervention between stages.
It is a further object to provide a stimulation sleeve with a time delay in order to hold a flow port open after activation and during the time delay, and which closes when the time delay has completed, preferable by using only one obturator.
Several configurations can be derived from the present invention:
1. Stimulation sleeve with delayed closing sequence—left closed, opened by intervention.
2. Stimulation sleeve with delayed closing sequence—left in a third closed position, opened by dissolvable/disintegrating technology, or a dual-action-type plug, which can be removed using pressure cycles.
The invention can be used for any type of multi-stage stimulation, including hydraulic fracturing treatment.
The above objects are achieved with a method for well completion in a subterranean wellbore, comprising the steps:
running a tubing with a number of stimulation sleeves into the wellbore, each stimulation sleeve comprises a housing having a through channel with a first end and a second end, one or more flow port and a sliding sleeve disposed axially movable within the housing to open or close said flow ports,
dropping an obturator into a well stream in the tubing and to land the obturator on a first obturator seat to partially or fully close fluid communication in the through channel of the housing,
build up pressure to shift the sliding sleeve axially in the housing to open the flow ports,
engaging a time delay mechanism for controlled travel of the sliding sleeve in the housing to hold the flow ports open a predetermined time,
closing the flow ports after the sliding sleeve has moved the predetermined time, and
retracting the obturator seat to release the obturator.
The flow ports can be opened by aligning longitudinal slits in the sliding sleeve with the flow ports, and the flow ports can be closed by allowing the longitudinal slots in the sliding sleeve to move out of alignment with the flow ports.
A second obturator can be landed in a second obturator seat, said second obturator seat being located upstream of the first obturator seat, and to build up pressure to shift the sliding sleeve axially in the housing to re-open the flow ports.
The second obturator seat can be retracted to release the second obturator after the production ports in the sliding sleeve are aligned with the flow ports.
The production ports in the sliding sleeve can be filled with a dissolvable material that dissolves when exposed to well fluids.
The production ports in the sliding sleeve can mechanically be opened, for instance by one or more dual action plugs subjected to pressure cycles.
A shifting tool can be conveyed into the wellbore to shift the stimulation sleeves to open position after the stimulation is completed.
Thereafter a second obturator can be dropped into the well stream in the tubing and to land the second obturator on the obturator seat to partially or fully close fluid communication in the through channel of the housing; build up pressure to shift the sliding sleeve axially in the housing to close the flow ports by moving the longitudinal slits in the sliding sleeve out of aligning with the flow ports; engaging the time delay mechanism for controlled travel of the sliding sleeve in the housing to hold the flow ports open a predetermined time; and retract the obturator seat to release the obturator.
The above objects are also achieved with a stimulation sleeve for well completion in a subterranean wellbore, comprising a housing having a through channel with a first end and a second end, and one or more flow ports; and a sliding sleeve disposed axially movable within the housing to open or close said flow ports, wherein said sliding sleeve is equipped with at least a first obturator seat for receipt of a obturator to partially or fully close fluid communication in the through channel of the housing; and a time delay mechanism to allow the sliding sleeve to axially travel in the housing at a predetermined speed to open or close said flow ports.
The sliding sleeve can comprise a first closed part for closing the flow ports and a second partially open part equipped with longitudinal slits for alignment with the flow ports, to open the flow ports.
The sliding sleeve can comprise a third closed part for closing the flow ports.
The sliding sleeve may further comprise a fourth partially open part equipped with production ports for alignment with the flow ports to open the flow ports.
The production ports in the sliding sleeve can be filled with a dissolvable material that dissolves when exposed to well fluids.
The production ports in the sliding sleeve can mechanically be opened, for instance by comprising one or more dual action plugs that can be removed using pressure cycles.
The obturator seat can comprise a plurality of radially placed and retractable plungers being activated by the movement of the sliding sleeve. At least one gasket can be placed upstream of said plungers.
The sliding sleeve can comprise a second obturator seat for receipt of a second obturator, said second obturator seat being located upstream of the first obturator seat, in order to build up pressure and to shift the sliding sleeve axially in the housing to open the flow ports by aligning the production ports in the sliding sleeve with the flow ports.
The time delay mechanism can be accommodated in a hydraulic chamber on the inner surface of the housing, and comprise a piston surface area and longitudinal holes, each of which contains a hydraulic metering orifice which separates two sides of the piston.
The time delay mechanism can be accommodated in a hydraulic chamber on the inner surface of the housing, and comprise for instance a timing valve with a porous filter media rod that allows hydraulic fluid to pass from one side of the chamber to the other side of the chamber.
The porous filter media rod can be connected to a spring for regulation of how much of the porous media rod that is exposed to the hydraulic fluid.
Embodiments of the present invention will now be described, by way of example only, with reference to the following diagrams wherein:
The present invention relates to a stimulation sleeve 1 for well intervention in a subterranean wellbore 34, and comprises a housing 10 having a through channel 11 with a first end 11a and a second end 11b, one or more flow ports 14, and a sliding sleeve 13 disposed axially movable within the housing 10 to open or close the flow ports 14. The sliding sleeve 13 is equipped with at a first landing profile in the form of for instance an obturator seat 15, for instance a ball seat as seen in
An example of the landing profile in the form of an obturator seat 15 is shown in more detail in
In a further embodiment the obturator seat 15 can be made of a dissolvable material.
An example of a time delay mechanism 20 is shown in more detail in
The time delay mechanism 20 can be a metering device accommodated in a hydraulic chamber on the inner surface of the housing 10, and comprise a piston surface area and longitudinal holes, each of which contains a hydraulic metering orifice which separates two sides of the piston.
The invention takes tubular form with an internal diameter which makes up a portion of the wellbore, and an outside diameter which is exposed to the annulus and formation. It is connected end to end with the lower completion tubulars. Any number of stimulation sleeves 1 can be deployed at intervals along the lower completion tubular string, all of which can function in the same way. The stimulation sleeve 1 according to the invention comprises the housing 10 with flow ports 14 that hydraulically connect the wellbore 34 to the formation. The flow ports 14 can be open to allow flow to or from the formation, or closed to prevent flow and contain pressure.
The position of the inner sliding sleeve 13 determines whether the flow ports 14 are open or closed.
The inner sliding sleeve 13 of a first embodiment of the invention shown in
The inner sliding sleeve 13 has a middle section which comprises the time delay mechanism 20 in the form of for instance a piston surface area and machined longitudinal holes, each of which contains a hydraulic metering orifice which separates the two sides of the piston, as explained above in relation to the time delay mechanism 20. On both sides of the piston surface area is the hydraulic chamber 21 filled with hydraulic fluid. This hydraulic chamber 21 is balanced in pressure with the wellbore 34 under all steady state conditions.
The inner sliding sleeve 13 has a lower section which comprises the landing profile, as for instance explained above in relation to the obturator seat 15. The landing profile can be extended or retracted, depending on the position of the inner sleeve 13. While the sleeve 13 is in the first and second positions, the landing profile is extended, meaning the internal diameter is reduced and prevents any obturator of larger diameter from passing through it. When the sleeve 13 is in the third position, the landing profile is retracted to a larger ID, allowing any obturator of smaller diameter to pass through it.
If any obturator 17 with a smooth surface is prevented from passing the landing profile 15, the wellbore section above the obturator 17 is isolated from the wellbore section below the obturator. If pressure above the obturator is higher than the pressure below the obturator, a piston force results and acts to drive the inner sliding sleeve 13 in the downward direction. The speed at which the sliding sleeve 13 moves is controlled by the hydraulic orifices, i.e. the time delay mechanism 20, which allow the hydraulic fluid to meter from one side of the sleeve piston to the other side.
During well operations, one or more stimulation sleeves 1 are deployed into the well. Once the tubular string is positioned at the target depth, cementing operations can be conducted to place cement in the annulus. Alternatively to cement, the operator can choose to use open-hole packers to create the annular isolation between the sleeves and the rest of the well.
After annular isolation is established, the wellbore is pressure tested against the closed stimulation sleeves 1 and the remaining tubulars. Toe prep is then conducted, either through an intervention-based toe perforation method, or by opening a remotely operated toe sleeve, thereby creating a flow path at the bottom of the well.
When it is desirable to begin the stimulation operation, an obturator 17 is deployed into the well stream 48 of the wellbore 34 and pumped down to the uppermost stimulation sleeve 1. The obturator 17 makes contact with the obturator seat 15 in the stimulation sleeve 1, which in turn initiates the metering shift of the sliding sleeve 13 to the second position where the flow ports 14 are opened.
The stimulation stage is pumped through the open flow ports 14. Meanwhile, the sliding sleeve 17 continues to shift downward. The time at which the flow ports 14 remain open can be determined by using different number of orifices and/or using different permeability factor in the time delay mechanism 20.
At the predetermined time delay, the sliding sleeve 13 moves into the third position where the flow ports 14 are isolated. At the same time, the landing seat 15 retracts and allows the obturator 17 to pass the first stimulation sleeve 1 to the second stimulation sleeve 1 in the sequence, and the stimulation stage operation is repeated.
When the obturator 17 is released from the final stimulation sleeve 1 in the sequence, it continues down to the bottom of the well below the toe perforations or toe sleeve. Alternatively, it can land in a fixed landing profile above the toe sleeve, thereby creating a pressure tight tubular system, which may allow the operator to perform wellhead work without being exposed to a live well.
To open the stimulation sleeves 1 for production, wireline or coiled tubing intervention is performed using a shifting tool which locates inside the shifting profile of each sleeve. The sliding sleeve 13 is mechanically shifted to the open position. A checking valve allows the sleeve 13 to be shifted upwards without a hydraulic delay.
a-4h shows a second embodiment of the invention. The alternative configuration of the invention comprises a second landing profile in the form of a second obturator seat 15 which remains retracted in the first and second positions, but is then extended in the third position. The second obturator seat 15 can be used to shift the sliding sleeve 13 to a fourth open position by deploying a second obturator 17 into the well stream 48 of the wellbore 34 and pumping it through all the stimulation sleeves 1. In this configuration, it is desirable to prevent fluid leak off through the fourth position production ports 19 until all stimulation sleeves 1 have been shifted to the fourth position. This can be accomplished by using dissolvable material for plugs that are installed into the fourth position production ports 19 as a temporary barrier.
Another way to prevent leak off is to use dual action type plug design which are removed hydraulically from the fourth position production ports 19 by under balancing the well when the well is initially put on production. Flow from the formation into the wellbore removes the plugs and the well is produced as normal.
In
In all embodiments, mechanical wireline or coiled tubing intervention can be used to shift the sliding sleeve 13 back to the first closed position, to allow the stimulation operation to be repeated or to re-establish pressure integrity for other operations to take place.
Further, the production ports 19 can be lined with carbide insert to prevent erosion during proppant pumping.
In
Optionally can a slick line, wireline or coiled tubing shifting tool 44 be conveyed to the bottom of the wellbore 34, and be pulled out to shift the stimulation sleeves 1 to open position, as shown in
In
Number | Date | Country | Kind |
---|---|---|---|
20171752 | Nov 2017 | NO | national |
Number | Name | Date | Kind |
---|---|---|---|
5421414 | Lane | Jun 1995 | A |
5509442 | Claycomb | Apr 1996 | A |
5794699 | Hammet | Aug 1998 | A |
5813457 | Giroux | Sep 1998 | A |
7243723 | Surjaatmadja | Jul 2007 | B2 |
7398832 | Brisco | Jul 2008 | B2 |
7416029 | Telfer | Aug 2008 | B2 |
7681645 | McMillin | Mar 2010 | B2 |
7740072 | Surjaatmadja | Jun 2010 | B2 |
7770652 | Barnett | Aug 2010 | B2 |
7779911 | Akselberg | Aug 2010 | B2 |
7798236 | McKeachnie | Sep 2010 | B2 |
7814981 | Marcu | Oct 2010 | B2 |
7909108 | Swor | Mar 2011 | B2 |
7946340 | Surjaatmadia | May 2011 | B2 |
8201634 | Laurel | Jun 2012 | B2 |
8215411 | Flores | Jul 2012 | B2 |
8245788 | Garcia | Aug 2012 | B2 |
8276675 | Williamson et al. | Oct 2012 | B2 |
8505639 | Robison et al. | Aug 2013 | B2 |
8662178 | Norrid | Mar 2014 | B2 |
8668016 | Porter et al. | Mar 2014 | B2 |
8733449 | Ehtesham | May 2014 | B2 |
8757273 | Themig et al. | Jun 2014 | B2 |
8844622 | Telfer | Sep 2014 | B2 |
8893810 | Zimmerman | Nov 2014 | B2 |
8899334 | Merron et al. | Dec 2014 | B2 |
8919434 | Brekke | Dec 2014 | B2 |
8931565 | Desranleau et al. | Jan 2015 | B2 |
8978773 | Tilley | Mar 2015 | B2 |
8991509 | Merron | Mar 2015 | B2 |
9016376 | Surjaatmadja | Apr 2015 | B2 |
9121273 | Norrid | Sep 2015 | B2 |
9169707 | Gilstad | Oct 2015 | B1 |
9187978 | Castro | Nov 2015 | B2 |
9260935 | Murphree | Feb 2016 | B2 |
9273534 | Merron | Mar 2016 | B2 |
9334710 | Pacey et al. | May 2016 | B2 |
9369877 | Stout | Jun 2016 | B2 |
9371318 | Morrison | Jun 2016 | B2 |
9394773 | Garcia | Jul 2016 | B2 |
9428976 | Porter | Aug 2016 | B2 |
9458697 | Howell et al. | Oct 2016 | B2 |
9464501 | Kristoff | Oct 2016 | B2 |
9464506 | Coon | Oct 2016 | B2 |
9523261 | Flores | Dec 2016 | B2 |
9528835 | Russo | Dec 2016 | B2 |
9562419 | Fleckenstein et al. | Feb 2017 | B2 |
9617816 | Sullivan | Apr 2017 | B1 |
9637977 | Giroux | May 2017 | B2 |
9644464 | Jani | May 2017 | B2 |
9650866 | George | May 2017 | B2 |
9714557 | Garcia | Jun 2017 | B2 |
9702221 | Hofman | Jul 2017 | B2 |
9702222 | Hardesty | Jul 2017 | B2 |
9708867 | Lovell | Jul 2017 | B2 |
9759039 | Hardesty | Sep 2017 | B1 |
9759044 | Castro | Sep 2017 | B2 |
9765595 | Thernig | Sep 2017 | B2 |
9784070 | Neer et al. | Oct 2017 | B2 |
9835004 | Keerthivasan | Dec 2017 | B2 |
9840890 | Nordheimer | Dec 2017 | B2 |
9840892 | Nordheimer | Dec 2017 | B2 |
9856718 | Broussard | Jan 2018 | B2 |
9874067 | Themig | Jan 2018 | B2 |
9890610 | Jordan | Feb 2018 | B2 |
9926769 | Wood | Mar 2018 | B2 |
9926773 | Hallundbaek | Mar 2018 | B2 |
9951596 | Lynk | Apr 2018 | B2 |
20040163820 | Bishop | Aug 2004 | A1 |
20100175891 | Rondeau | Jul 2010 | A1 |
20120234545 | Xu | Sep 2012 | A1 |
20130081817 | Norrid et al. | Apr 2013 | A1 |
20130233535 | Pacey | Sep 2013 | A1 |
20140000909 | Neer | Jan 2014 | A1 |
20140083680 | Brekke | Mar 2014 | A1 |
20150136403 | Cheng | May 2015 | A1 |
20150226031 | Hekeloar | Aug 2015 | A1 |
20150354320 | Mahajan | Dec 2015 | A1 |
20150369009 | George | Dec 2015 | A1 |
20160084079 | Zhou | Mar 2016 | A1 |
20160130914 | Steele | May 2016 | A1 |
20160177657 | Howell | Jun 2016 | A1 |
20160237781 | Bacsik | Aug 2016 | A1 |
20160258260 | Walton | Sep 2016 | A1 |
20170030159 | Vick | Feb 2017 | A1 |
20170030168 | Akkerman | Feb 2017 | A1 |
20170044870 | Kellner | Feb 2017 | A1 |
20170058642 | Roessler et al. | Mar 2017 | A1 |
20170067314 | Flores Perez | Mar 2017 | A1 |
20170175488 | Lisowski | Jun 2017 | A1 |
20170234107 | Atilano | Aug 2017 | A1 |
20170241238 | Bacsik | Aug 2017 | A1 |
20170260813 | SadAbadi | Sep 2017 | A1 |
20180010424 | Hawkins | Jan 2018 | A1 |
20180073305 | Downing | Mar 2018 | A1 |
20180119517 | Hered | May 2018 | A1 |
20180163508 | Kellner | Jun 2018 | A1 |
20180171737 | Xu | Jun 2018 | A1 |
Number | Date | Country |
---|---|---|
102015003617 | Dec 2015 | BR |
2882582 | Mar 2014 | CA |
2886434 | Mar 2015 | CA |
2016050316 | Sep 2016 | CA |
2939553 | Feb 2017 | CA |
3001303 | Apr 2017 | CA |
2986338 | Feb 2018 | CA |
2015051125 | Jul 2015 | EP |
2448632 | Jan 2009 | GB |
2546996 | Sep 2017 | GB |
20171586 | Oct 2017 | NO |
20171731 | Oct 2017 | NO |
20180175 | Feb 2018 | NO |
2014055332 | Apr 2014 | WO |
2015039697 | Mar 2015 | WO |
20 5088524 | Jun 2015 | WO |
2015088524 | Jun 2015 | WO |
2015160424 | Oct 2015 | WO |
2015169676 | Nov 2015 | WO |
2016081718 | May 2016 | WO |
2017065767 | Apr 2017 | WO |
2017065752 | Apr 2017 | WO |
2017100939 | Jun 2017 | WO |
2018057011 | Mar 2018 | WO |
Entry |
---|
Norwegian Search Report (NO Appl. No. 20171752), dated Jun. 6, 2018. |
Number | Date | Country | |
---|---|---|---|
20190136666 A1 | May 2019 | US |