Hydrocarbon fluids such as oil and natural gas are obtained from a subterranean geologic formation, referred to as a reservoir, by drilling a well that penetrates the hydrocarbon-bearing formation. Once a wellbore is drilled, various forms of well completion components may be installed in order to control and enhance the efficiency of producing the various fluids from the reservoir. Data representative of various downhole parameters, such as downhole pressure and temperature, are often monitored and communicated to the surface during operations before, during and after completion of the well, such as during drilling, perforating, fracturing and well testing operations. In addition, control information often is communicated from the surface to various downhole components to enable, control or modify the downhole operations. Wireless communication systems, such as an acoustic communication system, can be deployed downhole to enable the enable the exchange of information or messages between downhole components and surface systems.
One type of well testing operation that may be performed is a Drill Stem Test (DST), where information about the hydrocarbon formation is derived from pressure data obtained downhole during the testing operation.
Certain embodiments of the present disclosure are directed to a method of performing an operation in a wellbore. The method includes running a toolstring in a wellbore that extends from a surface and penetrates a hydrocarbon-bearing formation that includes an upper zone and a lower zone. The toolstring includes a plurality of tools to perform an operation in the wellbore, including first and second packers, first and second fluid valves, and a fluid flow device. The fluid flow device includes a cylindrical housing having a wall defining an internal passageway for an axial fluid flow through the housing. Fluid ports extend through the wall to provide a path for a radial fluid flow to exit the internal passageway when the ports are open. The method further includes positioning the toolstring in the wellbore so that the first packer and the second packer straddle the upper zone, the first fluid valve and the second fluid valve straddle the upper zone, and the fluid flow device is adjacent the upper zone. The first packer is set to create a fluid flow barrier between the upper zone and an annulus of the wellbore surrounding the toolstring. The second packer is set to create a fluid flow barrier between the upper zone and the lower zone. The first fluid valve is closed to prevent a fluid flow through the toolstring to the surface, and the second fluid valve and the ports of the fluid flow device are opened to create a closed path for the hydrocarbon fluid to flow from the lower zone and into the upper zone. The method also includes perforating the lower zone.
Further embodiments of the present disclosure are directed to a system for performing an operation in a wellbore. The system includes a hub device to control and monitor a downhole operation in a wellbore that extends from a surface and penetrates a hydrocarbon formation having an upper zone and a lower zone. The system also includes a toolstring having multiple downhole tools located in the wellbore to perform actions associated with the downhole operation. The system further includes wireless repeaters communicatively coupled to a wireless transmission medium extending between the hub device and the downhole tools. The wireless repeaters can communicate with respective downhole tools and respond to a multiple hop query generated by the hub device. The multiple hop query includes multiple commands directed to targeted downhole tools. The hub device can generate a multiple hop query that directs the targeted downhole tools to create a closed loop fluid path for hydrocarbon fluids to flow from the lower zone and into the upper zone during the well operation.
Yet further embodiments of the present disclosure are directed to a method of testing a hydrocarbon well. The method includes deploying a test string in a wellbore that extends from a surface and penetrates a hydrocarbon bearing formation that includes an upper zone and a lower zone. The test string includes a tubing, downhole tools to perform activities associated with a well test and acoustic repeaters coupled to the tubing and acoustically coupled with the downhole tools. The method further includes deploying a hub device in the wellbore that is communicatively coupled with surface equipment via a wired transmission medium and communicatively coupled with the acoustic repeaters via an acoustic transmission medium. The method also includes generating, by the hub device, commands directed to the downhole tools that cause the downhole tools to create a closed loop fluid flow path for hydrocarbon fluids to flow from the lower zone and into the upper zone during the well test.
Certain embodiments are described with reference to the accompanying drawings, wherein like reference numerals denote like elements. It should be understood, however, that the accompanying drawings illustrate the various implementations described herein and are not meant to limit the scope of various technologies described herein. The drawings show and describe various embodiments of the invention.
In the following description, numerous details are set forth to provide an understanding of the present invention. However, it will be understood by those skilled in the art that the present invention may be practiced without these details and that numerous variations or modifications from the described embodiments may be possible.
In the specification and appended claims: the terms “connect”, “connection”, “connected”, “in connection with”, and “connecting” are used to mean “in direct connection with” or “in connection with via one or more elements”; and the term “set” is used to mean “one element” or “more than one element”. Further, the terms “couple”, “coupling”, “coupled”, “coupled together”, and “coupled with” are used to mean “directly coupled together” or “coupled together via one or more elements”. As used herein, the terms “up” and “down”, “upper” and “lower”, “upwardly” and downwardly”, “upstream” and “downstream”; “above” and “below”; and other like terms indicating relative positions above or below a given point or element are used in this description to more clearly describe some embodiments of the invention.
There are many hydrocarbon reservoirs and wells where two or more zones were discovered during drilling and formation testing from which hydrocarbons may be produced. In many instances, the well operator decides to produce hydrocarbons from one zone at a time and plugs the other zones (e.g., the lower zones). Once the selected zone is depleted, the operator may desire to unplug the lower zones for testing.
Well testing generally involves the process of recovering reservoir information based on pressure data collected by downhole sensors. Information that can be recovered includes skin, effective permeability and information concerning the geology and connectivity of boundary systems as they expand away from the wellbore. One type of well test that is often performed is called a drill stem test (DST). Although well testing provides valuable information for the operator, the testing can be costly in terms of the time and equipment needed. In addition, the fluids produced during the testing can create environmental concerns.
To illustrate, during a well test, a pressure disturbance is created that can be recorded by a gauge that is located either downhole (to measure bottom hole pressure or BHP) or at the surface (to measure well head pressure or WHP). This pressure disturbance can be created through a process where the hydrocarbon reservoir is produced (referred to as “drawdown”) and then shut in (referred to as “buildup”). Generally the well test is carried out using surface well test equipment. A typical well test may include multiple modes or phases, such as clean-up, initial build up, main flow and final build up. In the clean-up phase, the reservoir is drawn down with the goal of cleaning the perforations and clearing the wellbore of any drilling or completion fluids. During the build-up phases, the well is shut in to increase the bottom hole pressure. During the main flow phase, the well fluid is drawn down by opening the well at a constant rate with the effect of decreasing the bottom hole pressure.
Telemetry data obtained during the well test can provide information about both the well and the reservoir. For example, the production index and skin can be derived for the interval of the well being tested, and the average/effective permeability, heterogeneities (fractures, layering, properties), shapes and distances of boundaries, and average and initial pressures can be derived for the reservoir.
Performing a well test, such as a DST, requires a large amount of surface equipment and can present environmental challenges. For example, the draw down phase of the test involves the production of large amounts of fluid from the well. In existing well test systems, these fluids are stored in large storage tanks at the surface for later disposal. In locations where storage tanks are not available, the produced fluids are flared, thus releasing carbon dioxide to the atmosphere. Further, throughout the test, the surface test equipment collects and analyzes real-time telemetry data to verify the integrity of each phase of the test before proceeding to the next. Due to the large number of surface equipment needed (e.g., storage tanks and test equipment) and the complexity of the test equipment, well testing can be very costly.
The communication system used to convey telemetry data and commands during the well testing also introduces complexities and costs. Communication systems for transmitting information between the surface and downhole components in a well are faced with numerous challenges, some of which can be addressed by implementing a wireless communication system. One type of wireless communication system that can be deployed in a downhole environment is an acoustic communications system that uses an elastic medium as the communications path. The acoustic communication system can be used in multiple contexts, including testing, drilling or production operations, and can be used to transmit various types of information, such as telemetry information related to downhole measurements, tool status, actuation commands, etc. Generally, an acoustic communication system is considered for use when there is no apparent way to run a wired communications path between the communicating devices. The communicating devices may involve an operational team, where a computer (or control system) is used in the vicinity of the well (e.g., on a rig, waveglider, etc.) or at a remote location that is indirectly connected to a communication module connected to the acoustic network. In other implementations, the acoustic communication network can operate autonomously between the various oil and gas equipment.
In general, an acoustic communications network is composed of an arrangement of communication nodes in the form of acoustic modems that receive and transmit messages. The acoustic modems generally use a pipe string (or tubing) as the elastic transmission medium. The communication network is established by connecting a plurality of acoustic modems to tubing at axially spaced locations along the string. Each modem includes a transducer that can convert an electrical signal to an acoustic signal (or message) that is then communicated using the tubing as the transmission medium. An acoustic modem within range of a transmitting modem receives the acoustic message and processes it, including by demodulating and decoding the message. These modems are referred to as repeaters. A repeater's acoustic transducer and associated electronics can be packaged in a single cartridge that can be clamped to tubing in the wellbore The power source for the repeater can be a battery.
In many well testing applications, the repeaters are placed on the tubing at spaced apart intervals, such that approximately 25 repeaters would be used for a 3000 meter well. Deploying this number of repeaters not only involves costly hardware and batteries, but also entails implementing complex network initiation and routing procedures and thus can be yet another factor contributing significantly to the cost and complexity of a well test.
Accordingly, embodiments disclosed herein are directed to well testing systems and methods. Embodiments of the disclosed system and method reduce the surface equipment needed for well testing, automate the well testing, simplify the acoustic communications network, and provide a closed loop system where the fluids produced during the test are not brought to the surface for storage or flaring but instead are disposed in a downhole zone, which can be a depleted zone, a dry zone or a producing zone. Consequently, the capital expenditure associated with well testing can be reduced and the surface equipment that would otherwise be used to handle the fluids produced during testing can be eliminated. Embodiments of the disclosed system and method can be used in many different applications, including for testing a multi-zone well, where at least a first zone previously has been depleted or found dry (or is even still producing) and a second lower zone is to be tested. It should be understood, however, that embodiments disclosed herein can be implemented in other applications, such as using a lower zone to stimulate and naturally fracture an upper zone.
An example of a well testing system 100, such as a DST system, deployed in a wellbore 102 is shown schematically in
In the examples of
To perform the well test, the test string 110 is deployed in the wellbore 102. The string 110 includes a variety of pieces of equipment, including a first packer 114 and a second packer 116, tester valves 118 and 120, a sliding sleeve device 122, tubing pressure and temperature gauges 124a-c, annulus pressure and temperature gauges 126a-c within the annulus 128, a downhole adjustable choke 130, and various pieces of test equipment, such as fluid samplers 132 and flow meter 134. In the example of
As shown in
After setting the packers 114 and 116, the upper test valve 118 is used to isolate the fluid flow from reaching the surface, thus enabling a closed loop or continuous injection flow path to be created between upper zone 106 and lower zone 108. Upper test valve 118 can also be used at the end of the well testing to kill the well and pull the test string 110 from the wellbore 102. The lower test valve 120 is used as the main valve during the well test to ensure the fluid flow from the lower zone 108 to the upper zone 108. The lower test valve 120 also is used to perform the pressure build-up of the lower zone 108 during the build-up phase of the well test.
The sliding sleeve device 122 is positioned between the upper packer 114 and lower packer 116. As shown in
In the examples of
The test string 110 also includes a variety of other acoustically enabled equipment to perform the well test, such as the pressure and temperature gauges 124a-c, 126a-c, the fluid samplers 132, the downhole flowmeter 134, and the downhole adjustable choke 130. In general, the pressure and temperature gauges 124a-c, 126a-c are used to acquire reservoir pressure and temperature during the different phases of the well test. The gauges 124a-c, 126a-c also can be used to verify and confirm the status of various operations performed during the well test, such as setting/unsetting of packers 114 and 116, opening/closing of test valves 118 and 120, opening/closing of sliding sleeve device 122, perforation of zone 108, etc. As shown in
Fluid samplers 132 can be used to collect fluid samples during the flow phase of the test in which fluid is flowing from the lower zone 108. Flowmeter 134 can record and stream flow data in real time via the acoustic telemetry. Downhole choke 130 can be used to change the size of the choke during the fluid flow phase of the test. It should be understood that the toolstring 110 can include additional equipment or different equipment than the equipment described above, depending on the particular test being performed. For example, in the embodiment of
In embodiments, an acoustic communications system is employed to enable communications between surface equipment 146 and the various downhole tools that make up the test string 110, including the transmission of telemetry and status data from the various gauges, samplers, valves, perforation guns, chokes, and so forth, as well as the transmission of commands from the surface equipment 146 to the downhole tools.
A schematic illustration of a repeater 202 is illustrated in
The transceiver electronics 156 are arranged to receive an electrical signal from and transmit an electrical signal to the downhole equipment, such as the gauges 124, 126, valves 118, 120, ESP 125, and so forth. The electrical signal can be in the form of a digital signal that is provided to a processing system 160, which can encode and modulate the signal, amplify the signal as needed, and transmit the encoded, modulated, and amplified signal to the transceiver assembly 152. The transceiver assembly 152 generates a corresponding acoustic signal for transmission via the tubing 112.
The transceiver assembly 152 of the repeater 202 also is configured to receive an acoustic signal transmitted along the tubing 112, such as by another modem 102. The transceiver assembly 152 converts the acoustic signal into an electric signal. The electric signal then can be passed on to processing system 160, which processes it for transmission as a digital signal to the downhole equipment. In various embodiments, the processing system 160 can include a signal conditioner, filter, analog-to-digital converter, demodulator, modulator, amplifier, encoder, decoder, microcontroller, programmable gate array, etc. The repeater 202 also can include a memory or storage device 162 to store data received from the downhole equipment so that it can be transmitted or retrieved from the modem 202 later. Yet further, the memory or storage device 162 can store instructions of software for execution by the processing system 160 to perform the various well or well test operations described herein.
Returning to the example of
In known systems, a conventional technique for actuating downhole tools and acquiring downhole data entails transmitting a single query directed to a specific target downhole and then waiting to receive a response from the target. This technique can be costly both in terms of speed and energy consumption.
Accordingly, embodiments described herein are directed to an efficient data harvesting technique, referred to here as “Multiple Hop Queries.” In accordance with the Multiple Hop Queries technique, the hub repeater 204 assumes a supervisory (or master role) in the telemetry toolstring. Hub repeater 204 initiates a query that is composed of multiple simple queries, where each simple query is intended for a specific tool. As an example, a multiple hop query (“MHQ”) could include a “close tester valve” command directed to the tester valve 118, an “obtain pressure data” request directed to a sensor 124, 126, and an “open sleeve” command directed to the sliding sleeve device 122. The hub repeater 204 transmits the MHQ, which is then routed through the acoustic network 200 in accordance with a predetermined routing algorithm (which may be based, for example, on current noise conditions, currently available repeaters, a default route, etc.). Each repeater 202 along the route that receives the MHQ verifies whether the MHQ includes a simple query addressed to that repeater. If so, the repeater 202 dequeues the MHQ, processes the simple query, queues the response to the query into the payload of the MHQ, and then transmits the MHQ (with the response) in accordance with the routing algorithm. Once the MHQ reaches the final repeater 202 in the network 200, the final repeater 202 compiles the responses into a final response message and directs the final response to the hub repeater 204. The hub repeater 204 then can transmit the final response to the surface acquisition equipment 146.
A simplified example of the MHQ harvesting technique is shown in
In embodiments, the MHQ technique illustrated in
To perform a well test (e.g., a DST) using the tool string 110 of
The next phase of the DST test corresponds to the Build-Up Mode, in which the lower zone 108 is shut in so that the bottom hole pressure can build up. An exemplary workflow 400 for the Build-Up Mode is illustrated in
At block 410, the hub repeater 204 generates an MHQ[D] with multiple commands, including to close tester valve 120 and to change the rate at which pressure data is acquired from tubing gauge 124c and annulus gauge 126c. For example, the MHQ[D] may command the tubing and annulus gauges 124c, 126c to provide pressure data at a fast rate (e.g., 1 second) for an initial short interval of the build-up phase (e.g., 10 minutes), a slower rate (e.g., 10 seconds) for a second interval (e.g., 1 hour), and then a much slower rate (e.g., 2 minutes) during the remainder of the pressure build-up period (e.g., 3 hours). After transmitting MHQ[D], the hub repeater 204 waits a short period to allow the pressure to build (e.g., 10-20 seconds) (block 412). Then, the repeater hub 204 generates an MHQ[E] requesting the status of valve 120 and pressure data from gauges 124c, 126c (block 414). If the responses indicate that the tester valve 120 is closed and the pressure is building (block 416), then the hub repeater 204 will stream the pressure data to the surface equipment 146 (block 418). Otherwise, the hub repeater 204 notifies the surface 146 and re-starts the process at block 410.
In embodiments, the hub repeater 204 can also be configured to detect any anomalies in the pressure build-up during the Build-Up Mode (e.g., a leak, plug, etc.) If an anomaly is detected, the hub 204 notifies the surface equipment 146.
The next phase of the DST test corresponds to the Flow Mode. In the Flow Mode, the adjustable downhole choke 130 is set to a particular size and the tester valve 120 is opened so that fluid can flow from lower zone 108 and into upper zone 106 through the slidable sleeve device 122. In this mode, the hub repeater 204 again generates MHQs to query the status of the downhole tools and to obtain pressure and/or flow data. The MHQs can include commands to vary the size of the choke 130 and, if desired, to acquire fluid samples. In the example of
At the end of the Flow Mode, the DST test proceeds to the Kill Well Mode. In this Mode, the hub repeater 204 generates an MHQ with multiple commands, such as “open tester valve 120,” “wait 30 seconds,” “open tester valve 118,” “wait 30 seconds,” “open sliding sleeve 122,” “wait 30 seconds,” and “open choke 130 fully.” The hub repeater 204 can then generates an MHQ requesting the status of each of the tools to which the commands were sent. Hub repeater 204 can also generate an MHQ requesting pressure data from each of the gauges. If the pressure data confirms the status of the tools, then bullheading can be started to kill the well. Otherwise, the hub repeater 204 notifies the surface equipment 146 and re-starts the Kill Well Mode process.
In embodiments, the DST test (or any other well test) described above can be performed automatically (i.e., without user intervention). In the automatic mode, the surface system 146 can send an executable file to the hub repeater 204 that contains the well test program, with details of the various modes, including the durations and the mode parameters. The hub repeater 204 can then execute the program, including generating an MHQ to activate the tools required for each particular phase of a mode. Once the tools for the current phase or mode are activated, the hub repeater 204 can generate MHQs to obtain tool status and acquire telemetry data. Data obtained by the hub repeater 204 can then be sent to the surface system 146 for display and real-time interpretation.
In embodiments, the automatic mode can be interrupted by the well test operator. For example, an operator can interrupt the well test at any time and send a specific acoustic command to a specific downhole tool. The interruption can be for verification, program changes, troubleshooting or any other purpose. Further, the interruption mode can be temporary or permanent (i.e., cancelling the automatic execution of the well test program). If permanent, a new well test program can then be transmitted to the hub repeater 204 for execution.
Although embodiments have been described in the context of drill stem testing, it should be understood that the techniques can be used with other types of well tests or operations. Further, the test may include different or additional phases or modes than those described above, and the various actions taken in each phase can be different than those described above or may be performed in different orders. Yet further, it should be understood that the closed loop well test technique can be implemented using communication networks other than the acoustic communications network 200. Still further, it should be further understood that the techniques described herein can be implemented in a variety of wireless communications systems, and that the physical layer of the communication is not limited to the acoustic telemetry system that has been described above.
While the present disclosure has been disclosed with respect to a limited number of embodiments, those skilled in the art, having the benefit of this disclosure, will appreciate numerous modifications and variations there from. It is intended that the appended claims cover such modifications and variations as fall within the true spirit and scope of the invention.
Number | Date | Country | Kind |
---|---|---|---|
20306465.4 | Nov 2020 | EP | regional |
The present application is a divisional of co-pending U.S. patent application Ser. No. 18/254,240, filed May 24, 2023, which is a national stage entry of International Application No. PCT/US2021/061133, filed on Nov. 30, 2021, which claims priority to and benefit of European Patent Application No. 20306465.4 filed Nov. 30, 2020, the entirety of which is incorporated by reference herein and should be considered part of this specification.
Number | Date | Country | |
---|---|---|---|
Parent | 18254240 | May 2023 | US |
Child | 18815108 | US |