Abstract
A method and system for automatically activating a train warning device that uses a positioning system such as a global positioning system (GPS) receiver or an inertial navigation system (INS) to determine the train's position. The system further includes a database containing locations of grade crossings and other locations at which a train is required to give a warning signal and what regulations govern activation of the warning device at such locations.
Description




BACKGROUND OF THE INVENTION




1. Field of the Invention




The invention relates to automated railroad operation generally, and more particularly to a system and method for automatically activating a train warning device at a location for which a warning is required or desirable, such as a grade crossing.




2. Discussion of the Background




More than 4,000 collisions between trains and vehicles occur at public and private highway-rail grade crossings every year, resulting in more than 400 deaths annually. Approximately 50% of these accidents occur at grade crossings with active warning devices such as bells, flashing lights, and/or gates. Recently, some state and local governments enacted legislation prohibiting the use of horns at certain location and/or times. The Federal Railroad Administration (FRA) has studied the effect of this legislation. As a result of this study, the FRA determined that the sounding of train horns significantly reduces accidents at grade crossings. 65 Federal Register 2230 et seq.




As a result, the FRA promulgated several regulations, including 49 C.F.R. §222.21, which regulates how and when horns are to be sounded. Under 49 C.F.R. §222.21, in the absence of a state regulation, a horn must be sounded starting at a position no greater than ¼ mile away from the grade crossing. Furthermore, the railroad must place a whistle board (a wayside sign telling the conductor to begin sounding a horn) at a location such that a train traveling at the maximum speed will begin sounding its horn 20 seconds before the crossing, or the railroad must ensure by other methods that the horn is sounded no less than 20 seconds, but not more than 24 seconds, before the locomotive enters the grade crossing. If a state regulation is currently in place, the rule does not disturb the state regulation until a change in the maximum allowable speed is made, at which time the requirement of 49 C.F.R. §222.21 become effective. It will be readily apparent from the above discussion that precisely determining when to begin sounding a train horn is not a trivial task.




Even if a device such as a whistle board is present to inform an engineer as to the precise location to begin sounding a train horn, engineers sometimes make mistakes and don't begin sounding the horn at the right time. In many court cases brought against the railroad operator relating to grade crossing accidents, the engineer is accused of causing the accident by failing to blow the horn correctly.




What is needed is a method and system that will automatically activate a horn in a prescribed manner at an appropriate place and time.




SUMMARY OF THE INVENTION




The present invention meets the aforementioned need to a great extent by providing a method and system for automatically activating a train warning device that uses a positioning system such as a global positioning system (GPS) receiver an inertial navigation system (INS) to determine the train's position. The system further includes a database containing locations of grade crossings and other locations at which a train is required to activate a warning device, as well as what regulations govern activation of the warning device at such locations.











BRIEF DESCRIPTION OF THE DRAWINGS




A more complete appreciation of the invention and many of the attendant features and advantages thereof will be readily obtained as the same become better understood by reference to the following detailed description when considered in connection with the accompanying drawings, wherein:





FIG. 1

is a logical block diagram of a train control system according to one embodiment of the invention.





FIG. 2

is a flowchart showing an automatic horn sounding method according to one embodiment of the invention.











DETAILED DESCRIPTION




The present invention will be discussed with reference to preferred embodiments of train control systems. Specific details, such as regulations, distances and times, are set forth in order to provide a thorough understanding of the present invention. The preferred embodiments and specific details discussed herein should not be understood to limit the invention.




Referring now to the drawings, wherein like reference numerals designate identical or corresponding parts throughout the several views,

FIG. 1

is a logical block diagram of a train control system


100


according to the present invention. The system


100


includes a control unit


110


, which typically, but not necessarily, includes a microprocessor. The control unit


110


is connected to a positioning system such as a GPS receiver


120


. The GPS receiver


120


can be of any type, including a differential GPS receiver. Other types of positioning systems, such as inertial navigation systems (INSs) can also be used. The GPS receiver


120


provides position and speed information to the control unit


110


.




A database


130


, which contains the locations of all grade crossings in the system (or in the area in which the train is to operate) is also connected to the control unit


110


. In some embodiments, the database


130


can be updated through wireless communication (via wireless transceiver


140


) or other means to accept changes in grade crossing information. The-control unit


110


uses the position information from the GPS receiver


130


as an index into the database


130


to determine the nearest grade crossing being approached by the train.




The control unit


110


is also connected to an electrically activated horn


140


. Although a horn


140


is used in the embodiment of

FIG. 1

, it should be understood that any type of warning device, or combination of warning devices, including visual and audio warning devices, could be used.




Referring now to

FIG. 2

, a flowchart


200


illustrates operation of an automatic warning device activation method according to one embodiment of the present invention. The control unit


110


determines the next grade crossing based on the location of the train as reported by the GPS receiver


120


by indexing the database


130


at step


210


. If the next grade crossing is subject to state regulations at step


220


, the warning device (e.g., horn) is activated in accordance with state regulations at step


230


and the process starts over at step


210


. the next grade crossing is not subject to state regulations, then the system treats the grade crossing as subject to the aforementioned FRA regulation, 49 C.F.R. §222. The control unit


110


then determines whether the train is within ¼ mile of the grade crossing at step


240


. If not, step


240


is repeated. When the train is within ¼ mile of the grade crossing at step


240


, the control unit


110


next calculates the estimated time of arrival of the train at the grade crossing, based on the position and speed of the train as reported by the GPS receiver


120


, at step


250


. If the estimated time of arrival is less than 24, seconds, step


250


is repeated using updated speed and position information at step


250


. If the estimated time of arrival is less than 24 seconds at step


260


, the warning device is activated at step


270


. In some embodiments in which the warning device includes a horn, the horn is sounded in a two long, one short, one long sequence. If the control unit determines that the train has not cleared the grade crossing at step


280


, step


270


is repeated. If the grade crossing has been cleared, the process is repeated starting at step


210


.




It will be readily understood by those of skill in the art that the aforementioned invention can be practiced as a stand-alone system or may be practiced as part of an automated train control system. The database


130


may be programmed via wireless communications from a dispatcher or central authority, or may be periodically updated by reading data from a tape or flash memory in a manner well known in the art.




The embodiment described above has been discussed with reference to grade crossings. It will be readily understood by those of skill in the art that the invention can be used in connection with any location, temporary or permanent, at which it is required or desirable to activate a warning device. One example of such temporary location is an area of track being worked on by maintenance personnel.




Obviously, numerous modifications and variations of the present invention are possible in light of the above teachings. It is therefore to be understood that within the scope of the appended claims, the invention may be practiced otherwise than as specifically described herein.



Claims
  • 1. A computerized method for activating a warning device on a train at a location comprising the steps of:maintaining a database of locations at which a warning device must be activated and corresponding regulations concerning activation of the warning device; obtaining a position of a train and a speed of the train from a positioning system; selecting a next upcoming location from among the locations in the database based on the speed and the position; determining a point at which to activate the warning device in compliance with a regulation corresponding to the next upcoming location; and activating the warning device at the point.
  • 2. The method of claim 1, wherein the point is a point in space.
  • 3. The method of claim 1, wherein the point is a point in time.
  • 4. The method of claim 1, wherein the determining step includes the step of determining a distance from the train to the next upcoming location based on the position obtained in the obtaining step.
  • 5. The method of claim 1, wherein the determining step includes the step of determining a time at which the train will arrive at the next upcoming location based on the speed and position obtained in the obtaining step.
  • 6. The method of claim 1, wherein the warning device is a horn.
  • 7. The method of claim 1, wherein the location is a grade crossing.
  • 8. The method of claim 1, further comprising the step of updating the database via wireless communication.
  • 9. The method of claim 1, wherein the positioning system is a global positioning system.
  • 10. The method of claim 1, wherein the positioning system is an inertial navigation system.
  • 11. A system for automatically activating a warning device on a train at a location, the system comprising:a control unit; a storage device connected to the control unit, the storage device having stored therein a database of locations at which a warning device must be activated and corresponding regulations concerning activation of the warning device; a positioning system in communication with the control unit, the positioning system being configured to supply a position of a train and a speed of the train to the control unit; and a warning device connected to the control unit; wherein the control unit is configured to perform the steps of selecting a next upcoming location from among the locations in the database; determining a point at which to activate the warning device in compliance with a regulation corresponding to the next upcoming location; and activating the warning device at the point.
  • 12. The system of claim 11, wherein the point is a point in space.
  • 13. The system of claim 11, wherein the point is a point in time.
  • 14. The system of claim 11, wherein the determining step includes the step of determining a distance from the train to the next upcoming location based on the position obtained in the obtaining step.
  • 15. The system of claim 11, wherein the determining step includes the step of determining a time at which the train will arrive at the next upcoming location based on the speed and position obtained in the obtaining step.
  • 16. The system of claim 11, wherein the warning device is a horn.
  • 17. The system of claim 11, wherein the location is a grade crossing.
  • 18. The system of claim 11, wherein the system further comprises a wireless transceiver connected to the control unit and the control unit is further configured to update the database with information received via the wireless transceiver.
  • 19. The system of claim 11, wherein the positioning system is a global positioning system receiver.
  • 20. The system of claim 11, wherein the positioning system is an inertial navigation system.
US Referenced Citations (46)
Number Name Date Kind
4181943 Mercer, Sr. et al. Jan 1980 A
4459668 Inoue et al. Jul 1984 A
4561057 Haley, Jr. et al. Dec 1985 A
4711418 Aver, Jr. et al. Dec 1987 A
5072900 Malon Dec 1991 A
5129605 Burns et al. Jul 1992 A
5177685 Davis et al. Jan 1993 A
5332180 Peterson et al. Jul 1994 A
5340062 Heggestad Aug 1994 A
5364047 Petit et al. Nov 1994 A
5394333 Kao Feb 1995 A
5398894 Pascoe Mar 1995 A
5452870 Heggestad Sep 1995 A
5533695 Heggestad et al. Jul 1996 A
5541981 Lynn Jul 1996 A
5699986 Welk Dec 1997 A
5740547 Kull et al. Apr 1998 A
5751569 Metel et al. May 1998 A
5803411 Ackerman et al. Sep 1998 A
5828979 Polivka et al. Oct 1998 A
5836529 Gibbs Nov 1998 A
5867122 Zahm et al. Feb 1999 A
5944768 Ito et al. Aug 1999 A
5950966 Hungate et al. Sep 1999 A
5978718 Kull Nov 1999 A
6049745 Douglas et al. Apr 2000 A
6081769 Curtis Jun 2000 A
6102340 Peek et al. Aug 2000 A
6112142 Shockley et al. Aug 2000 A
6135396 Whitfield et al. Oct 2000 A
6179252 Roop et al. Jan 2001 B1
6218961 Gross et al. Apr 2001 B1
6311109 Hawthorne et al. Oct 2001 B1
6322025 Colbert et al. Nov 2001 B1
6345233 Erick Feb 2002 B1
6371416 Hawthorne Apr 2002 B1
6373403 Korver et al. Apr 2002 B1
6374184 Zahm et al. Apr 2002 B1
6377877 Doner Apr 2002 B1
6421587 Diana et al. Jul 2002 B2
6456937 Doner et al. Sep 2002 B1
6459964 Vu et al. Oct 2002 B1
6459965 Polivka et al. Oct 2002 B1
6487478 Azzaro et al. Nov 2002 B1
6494408 Katze Dec 2002 B2
6519512 Haasetal Feb 2003 B1
Non-Patent Literature Citations (49)
Entry
“Testimony of Jolene M. Molitoris, Federal Railroad Administrator, U.S. Department of Transportation before the House Committee on Transportation and Infrastructure Subcommittee on Railroads”, Federal Railroad Administration, United States Department of Transportation, Apr. 1, 1998.
“System Architecture, ATCS Specification 100”, May 1995.
“A New World for Communications & Signaling”, Progressive Railroading, May 1986.
“Advanced Train Control Gain Momentum”, Progressive Railroading, Mar. 1986.
“Railroads Take High Tech in Stride”, Progressive Railroading, May 1985.
Lyle, Denise, “Positive Train Control on CSXT”, Railway Fuel and Operating Officers Association, Annual Proceedings, 2000.
Lindsey, Ron A., “C B T M, Communications Based Train Management”, Railway Fuel and Operating Officers Association, Annual Proceedings, 1999.
Moody, Howard G, “Advanced Train Control Systems A System to Manage Railroad Operations”, Railway Fuel and Operating Officers Association, Annual Proceedings, 1993.
Ruegg, G.A., “Advanced Train Control Systems ATCS”, Railway Fuel and Operating Officers Association, Annual Proceedings, 1986.
Malone, Frank, “The Gaps Start to Close” Progressive Railroading, May 1987.
“On the Threshold of ATCS”, Progressive Railroading, Dec. 1987.
“CP Advances in Train Control”, Progressive Railroading, Sep. 1987.
“Communications/Signaling: Vital for dramatic railroad advances”, Progressive Railroading, May 1988.
“ATCS's System Engineer”, Progressive Railroading, Jul. 1988.
“The Electronic Railroad Emerges”, Progressive Railroading, May 1989.
“C3 Comes to the Railroads”, Progressive Railroading, Sep. 1989.
“ATCS on Verge of Implentation”, Progressive Railroading, Dec. 1989.
“ATCS Evolving on Railroads”, Proceedings Railroading, Dec. 1992.
“High Tech Advances Keep Railroads Rolling”, Progressive Railroading, May 1994.
“FRA Promotes Technology to Avoid Train-To-Train Collisions”, Progressive Railroading, May 1994.
“ATCS Moving Slowly but Steadily from Lab for Field”, Progressive Railroading, Dec. 1994.
Judge, T., “Electronic Advanced Keeping Railroads Rolling”, Progressive Railroading, Jun. 1995.
“Electronic Advances Improve How Railroads Manage”, Progressive Railroading, Dec. 1995.
Judge, T., “BNSF/ IP PTS Pilot Advances in Northwest”, Progressive Railroading, May 1996.
Foran, P., “Train Control Quandary, Is CBTC viable? Railroads, Suppliers Hope Pilot Projects Provide Clues”, Progressive Railroading, Jun. 1997.
“PTS Would've Prevented Silver Spring Crash: NTSB”, Progressive Railroading, Jul. 1997.
Foran, P., “A ‘Positive’ Answer to the Interoperability Call”, Progressive Railroading, Sep. 1997.
Foran, P., “How Safe is Safe Enough?”, Progressive Railroading, Oct. 1997.
Foran, P., “A Controlling Interest In Interoperability”, Progressive Railroading, Apr. 1998.
Derocher, Robert J., “Transit Projects Setting Pace for Train Control”, Progressive Railroading, Jun. 1998.
Kube, K., “Variations on a Theme”, Progressive Railroading, Dec. 2001.
Kube, K., “Innovation on Inches”, Progressive Railroading, Feb. 2002.
Vantuono, W., “New York Leads a Revolution”, Railway Age, Sep. 1996.
Vantuono, W., “Do you know where your train is?”, Railway Age, Feb. 1996.
Gallamore, R., “The Curtain Rises on the Next Generation”, Railway Age, Jul. 1998.
Burke, J., “How R&D is Shaping the 21st Century Railroad”, Railway Age, Aug. 1998.
Vantuono, W., “CBTC: A Maturing Technology”, Third International Conference On Communications Based Train Control Railway Age, Jun. 1999.
Sullivan, T., “PTC -Is FRA Pushing Too Hard?”, Railway Age, Aug. 1999.
Sullivan, T., “PTC: A Maturing Technology”, Railway Age, Apr. 2000.
Moore, W., “How CBTC Can Increase Capacity”, Railway Age, Apr. 2001.
Vantouno, W., “CBTC: The Jury is Still Out”, Railway Age, Jun. 2001.
Vantouno, W., New-tech Train Control Takes Off', Railway Age, May 2002.
Union Switch & Signal Intermittent Cab Signal, Bulletin 53, 1998.
GE Harris Product Sheet: “Advanced Systems for Optimizing Rail Performance” and “Advanced Products for Optimizing train Performance”, undated.
GE Harris Products Sheet: “Advanced, Satellite-Based Warning System Enhances Operating Safety”, undated.
Furman, E., et al., “Keeping Track of RF”, GPS World, Feb. 2001.
Walker, Publication No. US 2001/0056544 A1, Dec. 27, 2001.
Gazit et al., Publication No. US 2002/0070879 A1, Jun. 13, 2002.
Department of Transportation Federal Railroad Administration, Federal Register, vol. 66, No. 155, pp. 42352-42396, Aug. 10, 2001.