| Number | Date | Country | Kind |
|---|---|---|---|
| 914652 | Nov 1991 | NOX |
| Filing Document | Filing Date | Country | Kind | 102e Date | 371c Date |
|---|---|---|---|---|---|
| PCT/NO92/00053 | 3/30/1992 | 8/8/1994 | 8/8/1994 |
| Publishing Document | Publishing Date | Country | Kind |
|---|---|---|---|
| WO93/11030 | 6/10/1993 |
| Number | Name | Date | Kind |
|---|---|---|---|
| 4086865 | Statham | Feb 1978 | |
| 4490121 | Coppens et al. | Dec 1984 | |
| 4650431 | Kentosh | Mar 1987 | |
| 5044297 | dee Baan et al. | Sep 1991 | |
| 5316509 | Boatman et al. | May 1994 |
| Entry |
|---|
| Design, Construction, Installation and Operation of a Disconnectable Mooring System for an FPSO in the South China Sea, by C. Davidson, Single Buoy Moorings Inc., as presented at the 6th International Conference on Floating Production Systems, 10th/11th Dec. 1990. |
| Marginal Offshore Fields Tanker Loading and Storage Systems, MHL GEC Mechanical Handling Limited. |