The invention relates to a method and a system for controlling an electrical installation using a graphics-based control system and a geo-referenced information system, in which at least one component of the electrical installation and an item of geo-referenced information that is linked to the component of the electrical installation can be displayed.
In supervisory control systems of electrical installations, particularly of electricity supply systems, a human operator has until now been provided with a control and display system divided into two and, in principle, decoupled and decoupled control and display systems do not interact with one another, or only in a very restricted manner.
To control certain parameters of an electrical installation, so called higher-level control and supervision systems such as, for example, SCADA (supervisory control and data access) systems are normally used which, in most cases with a conception of redundant architecture, guarantee almost one hundred percent monitoring and supervision reliability, secured twice in most cases. However, the graphical imaging of the electricity supply system to be controlled is very coarse and orientated especially with regard to the controllable components of the electricity supply system such as, for example, chokes or circuit breakers within an electrical high-voltage system. The distances between the controllable components of the electricity supply system frequently do not correspond to the actual distances and the connections are only displayed as single lines—in most cases only as right-angled lines—in contrast to the actual course of the route of the connecting cables.
In contrast, geo-information systems provide for a very detailed representation of the actual distances and proportions of the controllable components and of the connections, the displaying of the geo-based data alone consuming extensive computer resources so that previous geo-information systems are used exclusively for displaying geo-based data with a corresponding map which is in most cases a topological map.
Currently, in control rooms for controlling electricity supply systems, in particular electrical high-voltage systems, the SCADA system for directly controlling the electricity supply system and the GIS system for displaying of geographic data are operated largely autonomously and independently of one another. A change between the line representations of the electricity supply system as single-line representations in the SCADA system and the geographic representation in the GIS system is currently possible to a limited extent. However, the operator is not able to utilize typical SCADA functionalities such as the switching of system components within the GIS system. For the operator, this means a break in the work sequence since the operator must change to the SCADA system from the GIS system for the controlling function. The lack of coordination and different viewpoint in the GIS system and in the SCADA system prevents the operator from rapidly ascertaining the situation, particularly in critical situations such as a partial failure of the electricity supply system, and can thus lead to a faulty operation by the operator due to a false ascertainment of the representations. The continuous change between the representation of the real topological view in the GIS system, which can thus be ascertained in an intuitively simple manner, into the abstract component-oriented representation in the SCADA system, also makes it more difficult for the operator to continuously track the process sequences within the electricity supply system so that this operating mode of monitoring different forms of representation is very fatiguing and can thus lead to errors.
Thus, U.S. Pat. No. 6,496,189 B1 describes a method for representing data blocks of a three-dimensional environment. The data blocks are structured hierarchically in accordance with different resolutions. A display unit transmits selected coordinates of the region to be represented, which ensures a particular resolution in the region to be represented, particularly along a planned flight path.
WO 2005/024667 A1 discloses a method and a system for linking geo-related data to a corresponding geo-reference point in a geo-information system. According to this invention, the selective representation of locally relevant advertisement on a map, in particular, is carried out in such a manner that, after corresponding geo-related data have been input, these data are compared with regard to their relevance for the geo-reference point, which is also to be input, and if relevance exists, the geo-related data are displayed with reference to the geo-reference point. WO 2006/074054 A1 discloses a corresponding method for determining the relevance of the geo-referenced information and of the geo-reference point.
All methods and systems known in the prior art are used either exclusively for displaying geo-referenced information or exclusively for regulating and controlling electrical installations, particularly electricity supply systems.
It is the object of the present invention, therefore, to provide a possibility of providing a human operator with an intuitive control of an electrical installation.
The object is achieved by a method according to claim 1. According to the invention, it is provided that the geo-referenced information can be selected in the geo-referenced information system and, in the case of a change of the geo-referenced information performed by an operator in the geo-referenced information system the change is checked with regard to its relevance for the graphics-based control system. Following this, if relevance exists, the operating procedure corresponding to the changed geo-referenced information is determined for the graphics-based control system and, following this, the corresponding operating procedure is implemented in the graphics-based control system. The previous parallelism of the geo-referenced information system, for example a geo-information system (GIS), and of the graphics-based control system, for example a SCADA system, is partially cancelled by the present invention. A selection or change in the geo-referenced information system is used for determining a corresponding operating procedure which can be activated in the graphics-based control system. This retains the high standard of reliability of the graphics-based control systems and, in practice, the human operator uses the geo-referenced information system as an input mask for his operating procedures. Checking the relevance of the changed geo-referenced information ensures that only data and information relevant to the graphics-based control system are processed as part of the present invention.
In an advantageous embodiment of the method, it is provided that, after the execution of the corresponding operating procedure in the graphics-based control system, the execution of the corresponding operating procedure is transmitted to the geo-referenced information system. This provides the operator with a direct feedback in the geo-referenced information system in the case of a change selected by him so that the operator can track the implementation exclusively in the geo-referenced information system. Thus, for example, when a previously opened circuit breaker is switched, the circuit breaker can be marked red in the geo-referenced information system and, after the corresponding geo-referenced information has been selected in the geo-referenced information system and has been implemented in the graphics-based control system, the circuit breaker can be marked with green as being in operation in the geo-referenced information system due to the feedback.
To provide good clarity and to ensure that the geo-referenced information is relevant, a context menu comprises the possible corresponding operating procedures for, for example, one component of the electrical installation. The context menu directly lists all possible operating procedures which can be selected by an operator. On the one hand, this reduces the checking of relevance and, on the other hand, the selected operating procedures can be delivered directly to the graphics-based control system. The geo-referenced information is also a symbol of at least one component of the electrical installation, where all possible operating procedures with respect to the component of the electrical installation can be selected by selecting the symbol. In this context, it is possible by clicking on a corresponding symbol, for example on a power transformer in an electrical high-voltage system, to select possible operating states on the basis of selecting the operating procedures or symbol, respectively.
It is considered to be an advantage that the corresponding operating procedure is a control instruction which can be implemented directly in the graphics-based control system. Since there is no need to transform the operating procedure selected in the geo-referenced information system into an operating procedure which can be read by the graphics-based control system, this prevents, in particular, the susceptibility to errors due to the transformation. At the same time, it ensures that the operator knows that the operating procedure selected in the geo-referenced information system is implemented as control instruction executed directly in the graphics-based control system.
The graphical feedback in the geo-referenced information system on the basis of the conditional changes of at least one component of the electrical installation due to the corresponding operating procedure conveys to the operator that the procedure has been implemented in the graphics-based control system. This can be indicated, for example, by a color change of a symbol selected in the geo-referenced information system from red for previously not in operation and subsequently green for in operation due to the last operating procedure.
The corresponding operating procedure is advantageously checked for plausibility with regard to the future changes of the current configuration of the component of the electrical installation or on the basis of the current configuration of the entire electrical installation and, in the case of a plausible operating procedure, the latter is forwarded to the graphics-based control system. This additional protection prevents that possibly unwanted operating procedures which are selectable in the geo-referenced information system certainly cannot be selected on the basis of the current configuration by the operator.
It is considered to be an advantage that rule-based systems, particularly expert systems and/or neural networks, determine the corresponding operating procedure on the basis of the selection in the geo-referenced information system and/or check the plausibility of the corresponding operating procedure on the basis of a configuration of at least one component of the electrical installation.
In particular, the geo-referenced information system is a geo-information system (GIS) and the graphics-based control system is a supervisory control and data access (SCADA) system.
The electrical installation is an electricity supply system, particularly an electrical high-voltage system. Electricity supply system in the sense of the present invention is any electricity supply system. The definition also comprises electricity supply systems for fluid media such as, for example, a gas pipeline system.
Other advantageous embodiments are found in the subclaims. The present invention will be explained in greater detail with reference to the exemplary embodiments in the figures, in which, by way of example,
The figure
The figure
According to the invention, a platform is created within the GIS system 3 in order to perform all conventional SCADA functionalities as operating procedures 6 directly on the component of the electrical installation 1 so that all SCADA functionalities can thus also be used in the GIS system 3. It is essentially a matter of geographically representing the current electrical installation 1 with its components and to interpret interactions of the operator in control instructions for the SCADA system 2. Thus, for example, when controlling an electrical high-voltage system as electrical installation 1, changes can be performed in alarm lists or protocols, in the operating diary as operating procedures 6. Operating procedures 6 can also be the acknowledgement of alarms, the triggering of switching processes, the triggering of a fault data acquisition, the individual and stepped control of operating means, the manual influencing of measurement values, the processing of switching sequences or similar actions of the operator.
The advantages of the integration between the SCADA system 2 and the GIS system 3, according to the invention, lie in the better work sequence for the operator. The type of representation of the electricity supply system 1 does not change anything in the functionalities and the control instructions in the SCADA system 2 in the form of selectable operating procedures in the GIS system 3. The functionality of the SCADA system 2, and thus the aspect of high reliability of this system, is maintained completely. In addition, it creates for the operator a consistent appearance of the representation 10 exclusively in the GIS system so that the operator does not have to monitor two systems 2, 3 or swap between the representations 10, 11.
Filing Document | Filing Date | Country | Kind | 371c Date |
---|---|---|---|---|
PCT/DE2006/001870 | 10/18/2006 | WO | 00 | 4/15/2009 |
Publishing Document | Publishing Date | Country | Kind |
---|---|---|---|
WO2008/046367 | 4/24/2008 | WO | A |
Number | Name | Date | Kind |
---|---|---|---|
6215263 | Berkowitz et al. | Apr 2001 | B1 |
6799080 | Hylden et al. | Sep 2004 | B1 |
7293112 | Cone et al. | Nov 2007 | B2 |
7415368 | Gilbert et al. | Aug 2008 | B2 |
7672262 | McCoy et al. | Mar 2010 | B2 |
7739138 | Chauhan et al. | Jun 2010 | B2 |
20020035495 | Spira et al. | Mar 2002 | A1 |
20030172002 | Spira et al. | Sep 2003 | A1 |
20030228005 | Melick et al. | Dec 2003 | A1 |
20040002950 | Brennan et al. | Jan 2004 | A1 |
20040090471 | Cone et al. | May 2004 | A1 |
20040236620 | Chauhan et al. | Nov 2004 | A1 |
20050033481 | Budhraja et al. | Feb 2005 | A1 |
20050143941 | Forth et al. | Jun 2005 | A1 |
20060240818 | McCoy et al. | Oct 2006 | A1 |
20100262707 | Johnson et al. | Oct 2010 | A1 |
Number | Date | Country | |
---|---|---|---|
20100312407 A1 | Dec 2010 | US |