1. Field of the Invention
The present invention relates to methods and systems for optimization of a plurality of portfolios made up of tangible or intangible assets. More specifically, the present invention relates to methods and systems for optimization of multiple portfolios while applying portfolio constraints.
2. Discussion of the Background
Managers of assets, such as portfolios of stocks and/or other assets, often seek to maximize returns on an overall investment, such as, e.g., for a given level of risk as defined in terms of variance of return, either historically or as adjusted using known portfolio management techniques.
Following the seminal work of Harry Markowitz in 1952, mean-variance optimization has been a common tool for portfolio selection. A mean-variance efficient portfolio can be constructed through an optimizer with inputs from an appropriate risk model and an alpha model. Such a portfolio helps ensure higher possible expected returns (e.g., net of taxes and subject to various constraints) for a given level of risk.
Risk lies at the heart of modern portfolio theory. The standard deviation (e.g., variance) of the rate of return of an asset is often used to measure the risk associated with holding the asset. However, there can be other suitable or more suitable measures of risk than the standard deviation of return. A common definition of risk is the dispersion or volatility of returns for a single asset or portfolio, usually measured by standard deviation. ITG, the assignee of the present invention, has developed a set of risk models for portfolio managers and traders to measure, analyze and manage risk in a rapidly changing market. (See e.g., application Ser. No. 10/640,630). These models can be used to, among other things, create mean-variance efficient portfolios in combination with a portfolio optimizer, such as, e.g., those set forth herein.
According to modern portfolio theory, for any portfolio of assets (such as, e.g., stocks and/or other assets) there is an efficient frontier, which represents variously weighted combinations of the portfolio's assets that yield the maximum possible expected return at any given level of portfolio risk.
In addition, a ratio of return to volatility that can be useful in comparing two portfolios in terms of risk-adjusted return is the Sharpe Ratio. This ratio was developed by Nobel Laureate William Sharpe. Typically, a higher Sharpe Ratio value is preferred. A high Sharpe ratio implies that a portfolio or asset (e.g., stock) is achieving good returns for each unit of risk. The Sharpe Ratio can be used to compare different assets or different portfolios. Often, it has been calculated by first subtracting the risk free rate from the return of the portfolio, and then dividing by the standard deviation of the portfolio. The historical average return of an asset or portfolio can be extremely misleading, and should not be considered alone when selecting assets or comparing the performance of portfolios. The Sharpe Ratio allows one to factor in the potential impact of return volatility on expected return, and to objectively compare assets or portfolios that may vary widely in terms of returns.
By connecting a portfolio to a single risk factor, Sharpe simplified Markowitz's work. Sharpe developed a heretical notion of investment risk and reward—a sophisticated reasoning that has become known as the Capital Asset Pricing Model (CAPM). According to the CAPM, every investment carries two distinct risks. One is the risk of being in the market, which Sharpe called “systematic risk.” This risk, also called “beta,” can be reduced by diversification. The other risk, “unsystematic risk,” is specific to a company's fortunes. These risks can also be mitigated through appropriate diversification. Sharpe discerned that a portfolio's expected return hinges solely on its “beta,” its relationship to the overall market. The CAPM helps measure portfolio risk and the return an investor can expect for taking that risk.
Portfolio optimization often involves the process of analyzing a portfolio and managing the assets within it. Typically, this is done to obtain the highest return given a particular level of risk. Portfolio optimization can be conducted on a regular, periodic basis, e.g., monthly, quarterly, semi-annually or annually. Likewise, one can rebalance portfolios, which is accomplished ultimately by changing the composition of the assets in a portfolio, as often as is desired or necessary. Since one is not required to rebalance a portfolio each time one optimizes, one can optimize as frequently as desired. In considering rebalancing decisions, one typically also considers tax and/or transaction cost implications of selling and buying as one pursues an optimal portfolio.
In some existing portfolio optimizers, techniques such as “hill climbing” or linear/quadratic programming are used to find optimal solutions. However, when using these techniques, issues such as long/short, minimum position size, position count constraints, tax costs, and transaction costs generally cannot be modeled accurately. In addition, U.S. Pat. No. 6,003,018, titled Portfolio Optimization By Means Of Resampled Efficient Frontiers, shows other optimizer methods. The entire disclosure of U.S. Pat. No. 6,003,018 is incorporated herein by reference. The present invention provides substantial improvement over these and other optimizers.
The present assignee has developed a portfolio optimizer, currently called the ITGOpt®) optimizer, which uses mixed integer programming (MIP) technology to produce more accurate results than previously used optimization and rebalancing systems. In a prior version, of ITGOpt®, the system performed optimization in a single pass, taking into account simultaneously all of the constraints and parameters. In that version, characteristics related to the trading of a particular security could be constrained or introduced. In addition, a full range of portfolio characteristics could have been specified, including, for example, constraints on leverage, turnover, and long versus short positions. Furthermore, constraints may be applied to an entire portfolio or to its long or short sides individually. Furthermore, the prior version of ITGOpt® avoided misleading heuristics by combining a branch-and-bound algorithm with objective scoring of potential solutions, thus reducing the size of the problem without damaging the integrity of the outcome.
Additionally, the prior ITGOpt® optimizer could accurately model and analyze implications associated with the tax code. For example, integer modeling of tax brackets and tax lots enables the ITGOpt®) optimizer to minimize net tax liability without discarding large blocks of profitable shares. The prior ITGOpt® is also adaptable to high in first out (HIFO), last in first out (LIFO), or first in first out (FIFO) accounting methods. In addition, the prior ITGOpt® was designed with a focus on the real-world complexities of sophisticated investment strategies. The prior ITGOpt®) optimizer was able to handle complex and/or non-linear issues that could arise in real-world fund management.
Additionally, the prior ITGOpt® optimizer was able to factor transaction costs resulting from market impact into its solutions. The optimizer included a cost model, ACE®, for forecasting market impact. The inclusion of ACE® enabled users to weigh implicit transaction costs along with risks and expected returns of optimization scenarios.
It is common, especially in quantitatively managed portfolios, to control trading costs through constraints on the quantity of shares traded or the expected cost to trade when rebalancing a portfolio. One method of estimating the expected cost to trade is to use a mathematical model, such as ITG's ACE® (see U.S. patent application Ser. No. 10/166,719, entitled “System and method for estimating and optimizing transaction costs,” the entire contents of which are incorporated herein by reference).
The constraints placed on the quantity of shares traded or expected costs are reasonably effective when applied to the management of a single portfolio. However, many portfolio managers oversee multiple portfolios that might have overlapping holdings. The rebalancing of multiple portfolios can cause a problem in that the one stock found in more than one portfolio may want to be traded in more than one portfolio. For example, portfolios A and B can both contain the same share of IBM stock, and in rebalancing portfolios A and B it may be desirable to trade the IBM share in each portfolio. A manager attempting to trade the aggregate number of shares that are contained in multiple portfolios will count a single share found in multiple portfolios multiple time resulting in a larger overall execution size and larger than expected trade costs. For example, a manager would find that two shares of IBM need to be traded in portfolios A and B, and thus might execute the trading of two shares of IBM rather than the single IBM share that is in both portfolios A and B. The result of this “multiple counting” of shared shares is that each portfolio's realized execution cost will be greater than the portfolio manager is willing or expecting to spend.
Additionally, the prior ITGOpt® optimizer used effective historical back-testing. The ITGOpt® optimizer could closely track portfolios through time, accounting for the effects of splits, dividends, mergers, spin-offs, bankruptcies and name changes as they occur.
Additionally, the prior ITGOpt® optimizer was equipped to handle many funds and many users. The prior ITGOpt® optimizer included multi-user, client-server relational database management technology having the infrastructure to accommodate the demands of many simultaneous users and a large volume of transactions.
Additionally, the prior ITGOpt® optimizer integrated neatly with trade-order management and accounting systems. Because the prior ITGOpt® optimizer was built on relational database management technology it was easily linked with other databases. The prior ITGOpt® optimizer could also generate trade lists for execution by proprietary TOM systems. Moreover, the prior ITGOpt® optimizer design allowed for extensive customization of reports to fit a companies' operations and clients' needs. Moreover, custom report formats were able to be designed quickly and cost-effectively.
While a variety of portfolio optimization systems and methods, including prior versions of ITGOpt® optimization system, may exist, there is a significant need in the art for systems and processes that improve upon the above and/or other systems and processes.
The various embodiments of the present invention significantly improve upon existing methods and systems.
According to embodiments of the present inventions, improved systems and methods are provided for the optimization of a plurality of portfolios which are composed of assets, either tangible or intangible, such as securities or stocks.
In an embodiment of the invention, a method is provided for optimizing a plurality of portfolios. Each portfolio includes one or more shares of one or more tradable assets. The method includes receiving asset data defining a plurality of portfolios; receiving one or more individual portfolio optimization parameters corresponding to the plurality of portfolios; receiving one or more global optimization parameters; for each portfolio, optimizing the asset data based on the corresponding individual optimization parameters; aggregating the optimized asset data to create aggregate optimized asset data; determining if the aggregate optimized asset data satisfies the global optimization parameters; and only if the global optimization parameters are satisfied, outputting the optimized asset data.
In another embodiment of the invention, a computer-readable storage medium is provided that has computer executable program code stored therein for optimizing a plurality of portfolios by performing the following operations: receiving asset data defining a plurality of said portfolios; receiving asset data defining a plurality of portfolios; receiving one or more individual portfolio optimization parameters corresponding to the plurality of portfolios; receiving one or more global optimization parameters; for each portfolio, optimizing the asset data based on the corresponding individual optimization parameters; aggregating the optimized asset data to create aggregate optimized asset data; determining if the aggregate optimized asset data satisfies the global optimization parameters; and only if the global optimization parameters are satisfied, outputting the optimized asset data.
In another embodiment of the invention, a system is provided for performing optimization of a plurality of portfolios of assets. The system may include a client interface configured to receive asset data defining a plurality of portfolios, to receive one or more individual portfolio optimization parameters corresponding to one or more of a plurality of portfolios, to receive one or more global optimization parameters, to optimize each portfolio of a plurality of portfolios using said asset data and a corresponding one or more of the individual optimization parameters, to aggregate the optimized asset data to create aggregate optimized asset data; to determine if the aggregate optimized asset data satisfies the one or more global optimization parameters; and only if the one or more global optimization parameters is satisfied, to output the optimized asset data.
The above and/or other aspects, features and/or advantages of various embodiments will be further appreciated in view of the following description in conjunction with the accompanying figures. Various embodiments can include or exclude different aspects, features, or advantages where applicable. In addition, various embodiments can combine one or more aspects, features, or advantages where applicable. The descriptions of the aspects, features, or advantages of a particular embodiment should not be construed as limiting any other embodiment of the claimed invention.
The accompanying figures are provided by way of example, without limiting the broad scope of the invention or various other embodiments, wherein:
The embodiments of the invention can be implemented on one or more computer(s) and/or one or more network of computer(s), such as a local area network (LAN), a wide area network (WAN), the Internet and/or another network. In various embodiments, one or more server(s), client computer(s), application computer(s) and/or other computer(s) can be utilized to implement one or more aspect of the invention. Illustrative computers can include, e.g.: a central processing unit; memory (e.g., RAM, etc.); digital data storage (e.g., hard drives, etc.); input/output ports (e.g., parallel and/or serial ports, etc.); data entry devices (e.g., key boards, etc.); etc. Client computers may contain, in some embodiments, browser software for interacting with the server(s), such as, for example, using hypertext transfer protocol (HTTP) to make requests of the server(s) via the Internet or the like.
In some embodiments, the system can utilize relational databases, such as, e.g., employing a relational database management system (RDBMS) program to create, update and/or administer a relational database. The RDBMS may take Structured Query Language (SQL) statements entered by a user or contained in an application program and creates, updates and/or provides access to database(s). Some illustrative RDBMS's include ORACLE's database product line and IBM's DB2 product line. In some illustrative embodiments, as shown in
In some embodiments, the system provides a multi-user client server system, such as shown in
In some embodiments, portfolios include data objects, such as, e.g., holdings, historical executions, universe, benchmark, risk model, market data and/or others. In some embodiments, a universe of selected stocks can include, e.g., all of the relatively active securities in a relevant market or the like. Assuming, for example, that the U.S. market is the relevant market, then the universe of selected stocks may comprise, in some embodiments, approximately 8,000 stocks, including stocks from the New York Stock Exchange, the American Stock Exchange, the NASDAQ National Market, and some small cap stocks. Preferably, the specific objects in a portfolio can be defined by attributes and/or parameters that are set by a user. In some embodiments, an instance of a portfolio can be generated on the basis of an analysis date attribute, such as, in one illustrative example: a 3% S&P tracking portfolio with a Russell 1000 universe as of Jan. 1, 2003.
In some embodiments, the portfolio database can include an attributes hierarchy, such as, for example, a five level hierarchy as illustratively shown in
In some embodiments, the portfolio database can include characteristics that can be, e.g., arbitrary stock specific data. Preferably, users can define characteristics, such as using formulas and/or rules to create new characteristics from other characteristics. As an illustrative example, a user could use algebraic creation methods, such as “A=B+C×D.” As another illustrative example, a user could use set membership methods, such as, e.g., “A+1 if B<C and B>D.” In some embodiments, filters can be provided to enable names to be removed from a universe for compliance and/or other reasons, such as, e.g., “remove sin stocks with p/e's>10 and price<5.” In some embodiments, the system can provide default values for characteristics that are not specified.
In some embodiments, users can construct customized reports, such as, e.g., customized asset level reports. Preferably, report definitions can be named and stored (e.g., in digital data storage).
In some embodiments, any dimension of a portfolio “space” can be part of an objective function or constraint. In some embodiments, the system can facilitate the exploring of tradeoffs between any combinations of, for example: expected return; risk/tracking; exposures; transaction costs; taxes; position/trade counts/sizes; and others.
In some embodiments, one optimization can be provided with a universe in which both sides (e.g., buy and sell sides) are rebalanced subject to constraints on each side individually and for the portfolio as a whole.
In some embodiments, users are provided with a graphical user interface that is presented to the users via client computers. In some embodiments, the graphical user interface can enable importing and/or exporting of data and files, the setting of parameters, the running of the optimization and/or the acceptance of optimization results. In some embodiments, users can create or import specific task schedules in which, for example, import and/or export of data can be automated and functionality available in the user interface is available in batch processing.
The CPU 322 can communicate with a computer readable medium (e.g., conventional volatile or non-volatile data storage devices) 328 (hereafter “memory 328”) over the bus 326. The interaction between a CPU 322, I/O devices 324, a bus 326, and a memory 328 can be like that known in the art.
Memory 328 can include, for example, market and accounting data 330, which can include, for example, data on stocks, such as, stock prices, and data on corporations, such as book value. The memory 328 can also store software 338. The software 338 can include a number of modules 340 for implementing the steps of processes, such as steps of the processes 100 and/or 200 shown in
In some embodiments, the various methods described herein may be implemented via a computer program product for execution on one or more computer systems. For example, a series of computer instructions can be stored on a computer readable medium (e.g., a diskette, a CD-ROM, ROM or the like) or transmitted to a computer system via and interface device, such as a modem or the like. The medium may be substantially tangible (e.g., communication lines) and/or substantially intangible (e.g., wireless media using microwave, light, infrared, etc.). The computer instructions can be written in various programming languages and/or can be stored in memory device(s), such as semiconductor devices (e.g., chips or circuits), magnetic devices, optical devices and/or other memory devices. In the various embodiments, the transmission may use any appropriate communications technology.
With respect to the illustrative process 100 shown in
With respect to the illustrative process 200 shown in
Then, at step 204, a user can identify and reconcile missing data. In some embodiments, a user can reconcile data from multiple sources. In some embodiments, some potential problems could include: changes in asset status or identifier; missing or erroneous characteristics or risk data; membership in benchmark or universe; and/or others. In some embodiments, a holdings summary report can provide high-level problem notification. In some embodiments, missing data reports can be used for: holdings; benchmark; universe; characteristics; factor exposures; and/or others. In some embodiments, a user can use data editors to fix problems.
Then, at step 206, a user can specify rebalancing objectives. In some embodiments, a user can select “standard” parameters using a parameter editor, such as, for example: cash flow; objective function (e.g., alpha, risk aversion); risk constraints (e.g., two or plural benchmarks, common factor and specific); cash balance, turnover constraints; position size, position count and/or trade size constraints; universe characteristics filter; and/or others. Preferably, a user can select user specific parameters for use in the processes of the present invention. Preferably, a user can construct a constraint matrix using row/column bounds editors.
Then, at step 208, a user can examine current portfolio characteristics. In some embodiments, a user can receive reports for one or more of: holdings, universe, benchmarks, final portfolio(s), and/or others. Preferably, a user can receive summary and detail related to: accounting, characteristics, factor exposure, trades, and/or others.
Then, at step 210, a user can adjust parameters and constraints. In some embodiments, a user can perform this step via a parameter editor. Preferably, a row/column bounds editor is provided.
Then, at step 212, a user can optimize and create a rebalanced portfolio. This step can utilize an optimization engine to optimize and create suggested portfolios/trades. Preferably, the user can then examine the suggested portfolio/trades via, for example, a trade summary screen or report, a trade detail report or the like. The user can then preferably edit the suggested portfolio/trades as needed. The user can then preferably incorporate suggested portfolios/trades into particular executions.
As shown by arrow A2, the user can repeat steps 208-212 as desired to continuously evaluate portfolios/trades, rebalance portfolios and the like.
In some embodiments of the invention, step 108 in the process shown in
In some embodiments of the invention, a portfolio optimizer can be provided that enables one to ascertain an acceptable region of error. This can be advantageous, e.g., to help avoid having an optimizer that might propose changes or trades to be made as a result of “noise” within various inputs, which could, potentially, result in numerous trades and various costs related thereto. In some embodiments of the present invention, with an understanding of approximately how noisy these inputs are, the system can discern how large a region a portfolio manager can remain within that is deemed to be acceptable.
In some embodiments, the optimizer can define a confidence region for a portfolio P0 on the efficient frontier that corresponds to a risk aversion γ. In some embodiments, this region includes all portfolios P, such that clow*Risk(P0)<Risk(P)<chigh*Risk(P0) and Ret(P)>c*Ret(Popt). Where Popt is a portfolio on the efficient frontier such that Risk(Popt)=Risk(P). Additionally, clow, chigh and c are relative average deviations of decrease in risk, increase in risk and expected return of optimal portfolios that correspond to the risk aversion γ and different vectors of returns. It can be assumed that vectors of returns are normally distributed around their mean. In some embodiments, a user is able to set a specific confidence level by setting different values for constants clow, chigh and c.
In the resampled efficient portfolio optimization of the '018 patent, discussed above, a confidence region is computed around a resampled efficient frontier portfolio P0 and includes all portfolios with a value of variance relative to P0 less than or equal to a value associated with a specified confidence level. There, a main point in the resampled efficient portfolio optimization is to compute resampled efficient frontier portfolios. The resampling process produces simulated returns that provide alternative inputs for a computing of efficient frontier portfolios. Resampled efficient frontier portfolios are the result of an averaging process across many possible efficient frontiers.
On the other hand, in some embodiments of the present invention, standard efficient frontier portfolios are used, rather than resampled efficient frontier portfolios. Among other things, an efficient frontier portfolio, in contrast to a resampled efficient frontier portfolio, can be defined as a portfolio with maximum expected return for a fixed value of risk. In many cases, it should not be appropriate to use a resampled efficient frontier. As merely one illustrative example, consider two assets with a correlation coefficient of zero, expected returns 10% and 20% and a standard deviation of returns 20%. The maximum return portfolio includes only second asset and its expected return will be 20%. The resampled portfolio, which corresponds to the maximum return point on the resampled efficient frontier, includes about 35% of the first asset and 65% of the second asset and its expected return is only about 16%.
Resampled efficient frontier portfolios are constructed by averaging many portfolios that were obtained through simulations. Therefore, in most cases, these portfolios include a large number of different assets. Among other things, there would be difficulties using such portfolios in cases where it is desirable to have an optimal portfolio with a limited number of assets from a universe.
Computing Confidence Region for the Mean-Variance Efficient Set In Some Embodiments:
In some embodiments, the main parameters of the mean-variance model in ITG/Opt are α—the vector of assets expected returns and Σ—covariance matrix of the assets returns. These parameters can be estimated using historical data, analytical models, analysts' forecasts, or other methods.
V. K. Chopra, “Mean-Variance Revisited: Near-Optimal Portfolios and Sensitivity to Input Variations,” Journal of Investing, 1993, the entire disclosure of which is incorporated herein by reference, illustrates, among other things, that small changes in the input parameters can result in large change in composition of the optimal portfolio. M. Best and R. Grauer, “On the Sensitivity of Mean-Variance Efficient Portfolios to Changes in Asset Means: Some Analytical and Computational Results,” Review of Financial Studies, 1991, the entire disclosure of which is incorporated herein by reference, discusses, among other things, the effect of changes in the vector of assets expected returns on the mean-variance efficient frontier and the composition of optimal portfolios. V. K. Chopra and W. T. Ziemba, “The Effect of Errors in Means, Variances and Covariances on Optimal Portfolio Choice,” Journal of Portfolio Management, 1993 and J. G. Kallberg and W. T. Ziemba, “Mis-specification in Portfolio Selection Problems,” Risk and Capital, ed. G. Bamberg and A. Spreman, Lecture Notes in Economics and Mathematical Sciences, 1984, the entire disclosures of which are incorporated herein by reference, discuss, among other things, the relative importance of errors in expected returns, specific variances and covariances of returns on the investor's utility function. The relative impact of errors in these parameters depends on the investor's risk tolerance. If risk aversion parameter is not too high, the errors in expected returns have much more significant impact on the utility function than errors in other parameters. There are two possible ways to model errors in α:
According to the CAPM model, assets with higher returns have higher risk or higher variance of returns. Therefore, the errors in estimations of expected returns should be proportional to the values of the expected return. Taking into account the last observation, we consider in some embodiments the relative error model.
Considering a standard portfolio optimization problem arising in some embodiments:
where γ is a risk aversion parameter, α is a vector of estimated expected returns, h is a vector of position dollars, Risk(h) is a risk function and Q is a set of feasible portfolios. If γ is close to infinity, the problem (1) is equivalent to the problem:
If (is close to 0, the problem (1) is equivalent to the problem:
“t” denotes a return versus risk tradeoff coefficient:
where h(1), h(2) and h(3) are optimal solutions for problems (1), (2) and (3) correspondingly.
Considering a modified optimization problem with a vector of real expected returns:
where r is a vector of real expected returns. Let h(r) be an optimal portfolio for the problem (5). If the real return vector is (, the return of this portfolio is (Th(r). We find an optimal portfolio h(( ) with respect to return vector (and with the same level of risk like h(r) has:
The relative difference in returns of portfolios h(r) and h(( ) is a function of t, d and z:
The relative difference in Risk of portfolios h(1) and h(r) is a function of γ, d and z:
The variable z is a normal random variable, so an expected relative return difference of portfolios h(r) and h(α) is a function of t, d:
δ(t,d)=Ez(D(t,d,z)) (9)
An optimal portfolio, that corresponds to a high-risk aversion, is close to the minimum variance portfolio, and is much less affected by errors in the expected return vector than an optimal portfolio, that corresponds to a low risk aversion. The function δ(t,d) is equal 0 when t is 0, and it is increasing with increasing of t. Similarly, the function δ(t,d) is equal 0 when d is 0, and it is increasing with increasing of d.
RUp denotes an expected relative increase in Risk:
R
Up(t,d)=Ez|(−R(t,d,z)|R(t,d,z)<0), (10)
And, we denote by RDown an expected relative decrease in Risk:
R
Down(t,d)=Ez(R(t,d,z)|R(t,d,z)≧0). (11)
Function Return(x) describe a mean-variance efficient frontier for a vector of expected returns α and a risk function Risk(h), where value Return(x) is a return of an optimal portfolio with variance x. Now, for a given point (x*,Return(x*)) on the mean-variance efficient frontier, that corresponds to a tradeoff coefficient t, and for a standard deviation d, we define a set of points Ω(t,d):
Intuitively, it will be a set of mean-variance points that deviate from the mean-variance efficient frontier not more than the most of the optimal portfolios that were obtained for different realizations of vector of expected returns.
It is possible, for example, estimate functions δ, RUp and RDown for all possible combinations of, e.g., 10 values of the tradeoff coefficient t with 10 values of the standard deviation of error d using Monte Carlo simulations. The results of the study can be, e.g., summarized in tables. Tables 1-3 below demonstrate some illustrative tabular results. In order to calculate, e.g., a function for specific values x and y of tradeoff and standard deviation we can find values t1 and t2 of the tradeoff and two values d1 and d2 of the standard deviation in the table such that t1≦x≦t2 and d1≦y≦d2.
For a given risk aversion parameter and a standard deviation d, it is possible to find an optimal portfolio h* for the problem (1). Now, we can compute a tradeoff coefficient t corresponding to h* and set up the following upper bound on portfolio risk:
Risk(h)≦Risk(h*)*(1+RUp(t,d)). (13)
In order to set up a lower bound on portfolio's expected return, the problem below should be solved:
Using this solution, a constraint can be established:
αTh≧αTh′*(1−δ(t,d)). (15)
In some embodiments, an optimizer is provided that can provide an optimization of a portfolio of assets based on Sharpe Ratio as a measure of goodness. Preferably, the system can provide an ex-ante maximization based on expected return and expected risk. Rather than merely using the Sharpe Ratio in an ex-post manner looking backward, embodiments can provide a forward looking optimization based on the Sharpe Ratio. Thus, in some embodiments of the invention a unique form of portfolio optimization can be provided based on, e.g., the maximization of the Sharpe Ratio.
In some embodiments, the standard objective function is a maximum of a sum of the following terms multiplied by some coefficients over all portfolios h from a set Q (this set is defined by constraints imposed on the portfolio):
α(h)—the expected return of the final portfolio;
Risk(h)—the variance of return of the final portfolio (or of the difference between the final portfolio and a benchmark portfolio) divided by the basis of the portfolio;
TC(h)—the transaction cost of transition of the current portfolio into the final portfolio;
TaxCost(h)—the total tax liability after transition into the final portfolio;
Penalties(h)—the penalties for violation of some soft constraints and for realizing “almost-long-term” gains.
Preferably, in the optimal portfolio selection problem, we look for a portfolio that maximizes expected return with relatively low values of Risk, TC, TaxCost and Penalties. In that regard, we set a positive coefficient before α and negative coefficients before all other terms. We can group all terms but risk into one term, A(h), we can call it “adjusted return.” This term represents a total return after accounting for all extra expenses. We can denote a coefficient before a risk term by −γ, where γ is a risk aversion parameter. This parameter can establish a trade-off between risk and return of a potential investment portfolio.
In some embodiments, an alternative objective function could be the maximization of the reward-to-variability ratio S of a potential investment portfolio hεQ.
This ratio is known as the Sharpe ratio or Sharpe's measure. In this case, Risk is the variance of return of the final portfolio. A variance of return of the difference between the final portfolio and a benchmark portfolio is not used as Risk for the Sharpe ratio. Additionally, while in the standard objective function, the Risk is divided by portfolio basis B, one shouldn't divide Risk by B in the Sharpe ratio.
In some embodiments, it is possible to maximize S2 instead of S. Accordingly, the square root of the Risk in the denominator is removed.
First, A2 is replaced with its piece-wise linear approximation. In that regard, a lower and an upper bounds on A are located, such that a value of A, that maximizes S, lies between these bounds.
In some embodiments, an algorithm find bounds is used. In some embodiments, the algorithm can include substantially the following:
In most cases during the above algorithm, a LP (linear program) is solved three times. This algorithm terminates with values LowerBound and UpperBound for lower and upper bounds on A respectively. A set of links is defined I1, I2, . . . , In to represent A and create a piece-wise linear approximation A2 for the A2, where I1=LowerBound and In=UpperBound. We set Ii+1=Ii(1+b) for every i<n−1, and In≦In−1(1+b), and the n should be chosen to satisfy these conditions. For a given relative error value (1+e) in approximation of A2 by A2, we set
b=2(e+√{square root over (e(e+1))}).
If, as merely one illustrative example, e=0.0002, then error in the approximation of A2 is at most 1.0002 and the final error in S is at most 1.0001. In some embodiments, the value of e is a user-selected variable, which can be selected, e.g., via a computer input device.
It is now possible to find the maximum Sharpe ratio S. We set an initial value of S to the value of S1 from the previous algorithm.
In some embodiments, an algorithm find Sharpe Ratio is provided. In some embodiments, the algorithm can include substantially the following:
In some embodiments, the algorithm outputs an optimal value of a Sharpe Ratio S and a portfolio h* that achieves this ratio. In some embodiments, to decrease a computation time, optimization is started, in every iteration, from the optimal solution obtained in the previous iteration.
In the above algorithm “find bounds,” the problem starts with maximum possible value of adjusted return. In some embodiments, this number is decreased by a factor of two at each step of the algorithm. In some embodiments, the algorithm terminates when the best value of a Sharpe Ratio, that corresponds to the current level of the adjusted return, is lower then the Sharpe Ratio at the previous iteration. In most cases, the maximum value of Sharpe Ratio is achieved with adjusted return between the maximum adjusted return and a half of the maximum adjusted return.
In the algorithm “find Sharpe Ratio,” at each iteration, an updated guess of the maximum Sharpe Ratio value S is used. This is denoted by Si, hi and Xi the values of S, h* and X correspondingly that were obtained in ith iteration of the algorithm. Since Xi is a maximum of the optimization problem in the iteration i for every portfolio h, we have
A
2(h)−Si2Risk(h)≦Xi. (1)
By using an optimal portfolio hi+1 from iteration i+1 into inequality (1), we get
Now, the iteration i+1 is as follows:
Now, we substitute (4) into (3) and get:
Finally, taking (2) and (5) together we get:
From the last inequality, it is possible to conclude the following properties of the algorithm:
These properties illustrate that the algorithm converges at an exponential rate to the optimal value of Sharpe Ratio.
In some embodiments of the invention, the optimization system can address situations in which, for example, a portfolio manager manages portfolios for one or more clients, wherein the client(s) have different portfolios of assets. In some embodiments, the system is adapted to be able to rebalance portfolios on a large scale rather than only small scale (such as, e.g., individual scale) rebalancing. For instance, the system can rebalance on a large scale without having each individual have to make certain trades individually. Notably, while individual accounts may differ, they still often may have common assets within their portfolios.
In some embodiments, the system performs optimization on a smaller or individual basis (such as, e.g., on an account-by-account basis) and evaluates which results also satisfy multi-portfolio needs. Thus, certain embodiments can, essentially, optimize individual accounts, subject to an aggregate. Based on this optimization, the system can generate results providing optimized portfolios across multiple accounts—reducing potential transaction costs, reducing the frequency of required trades and/or providing other benefits.
The standard optimization problem in some embodiments involves maximizing a certain objective function Ω(h) over all portfolios h from a constraint set Q that is defined by constraints imposed on the portfolio. In multi-portfolio optimization, there are K portfolios such that for every portfolio hk, k=1, . . . , K, there is an objective function Ωk(hk) and a constraint set Qk. In addition, the total portfolio Σk=1,Khk should satisfy a constraint set Q for the total portfolio.
hkOpt, k=1, . . . , K, denotes a portfolio that maximizes value of the objective function Ωk such that hkOptεQk. Many portfolio managers have, e.g., the following multi-portfolio optimization problem: find an optimal set of K portfolios h1, . . . , hK such that Σk=1,KhkεQ and for every portfolio hk we have hkεQk and value of Ωk(hk) is close to the optimal value Ωk(hkOpt). In some embodiments, two different measures of distance between Ωk(hk) and Ωk(hkOpt) may be used:
relative measure: minimize value of
absolute measure: minimize value of
Ωk(hkOpt)−Ωk(hk).
In cases where a portfolio manager desires to make value of the objective function of each portfolio to be close to its maximum values in percents, the relative measure can be used. Alternatively, in cases where a portfolio manager desires to make these values to be close in dollars, the absolute measure can be used.
In some embodiments, an algorithm for multi-portfolio optimization can include substantially the following:
In a first step of the algorithm, it is possible to find an optimal portfolio hkOptεQk for every k, k=1, . . . , K.
In a second step of the algorithm, it is possible to distinguish between two cases:
relative measure: maximize value of scalar variable x under the following constraints:
For the relative measure case, it is assumed that the value of Ωk(hkOpt) is positive. Where it is negative, the value of the variable x is minimized instead of maximized.
Additionally, the invention as claimed can optimize a plurality of portfolios subject to global constraints. This optimization may take multiple rounds in order to reach an acceptable solution given the applicable constraints. One embodiment of the invention is illustrated in
Next, at step 808, the system receives parameters to be used in optimizing the individual portfolios. The system then optimizes the portfolios independently using the individual optimization parameters on individual portfolios at step 810. This newly optimized asset data is then aggregated at step 812, and the aggregated optimization asset data is checked to determine if it is within the bounds of the global constraints at step 814. If the aggregate optimized asset data satisfies the global constraints, the optimized asset data for each portfolio is displayed at step 816. However, in the event that the aggregate optimized asset data fails to satisfy the global constraints, the constraints on the individual portfolios are adjusted at step 818 and the optimization is rerun beginning with step 810. This process continues interactively until such time that the aggregate optimized asset data satisfies the global constraints.
The following example illustrates non-limiting aspects of the present which:
Three portfolios (h), each having 3 securities (S) to be traded:
h1: S1, S2, S3
h2: S1, S2, S4
h3: S1, S5, S6
The optimization of these three portfolios is subject to the following global constraints (MTOTAL):
MTOTAL-1: S1≦100 Shares Traded
MTOTAL-2: S2≦100 Shares Traded
MTOTAL-3: Total Trade Cost≦$200
The optimization of these three portfolios is subject to the following individual constraints (Mi). For the purposes of explanation and example, the constraints are identified according to the scheme: MPORTFOLIO-CONSTRIAINT NUMBER. While in this example the individual constraints mirror the global constraints, this is only one example of an embodiment. Another embodiment might have individual portfolio constraints that do not mirror the global constraints in either matter, i.e. securities, or amount, i.e. shares. Another embodiment might have individual constraints both mirroring and different from the global constraints, in part or in whole. In this example, the individual constraints are shown below:
If each portfolio were optimized, individually a possible outcome could be, assuming all other aspects of the example are in order:
While these individual portfolio optimizations meet the constraints placed on the individual portfolios, the aggregated asset data must still be checked to determine if the global constraints have been satisfied. The aggregated optimization data is as follows:
Thus, the number of S1 and S2 shares that were traded across all of the portfolios exceeded the aggregate number of shares the portfolio manager intended to trade. Further, the cost of the trades across all of the portfolios exceeds the maximum intended trade cost of the portfolios as a whole.
Therefore, where aggregate constraints may be imposed on multi-portfolio optimization, the system can adjust the constraints on the individual portfolios and rerun the optimization.
This aggregate optimization asset data is checked against the applicable global constraints (STOTAL>MTOTAL) at step 906. If the constraints are met, the optimized asset data is displayed at step 908. In the event that the global constraints are not satisfied in step 906, the system may adjust the constraints placed on the individual portfolio optimizations in the following manner. A determination if “late comers” are allowed is made at step 910.
Allowing “late comers” would allow securities that were not traded in a particular portfolio during the previous round of optimization to be traded in current round of optimization. If “late comers” are not allowed, the system must check to see if each security was traded during the previous round of optimization at step 914. If the security was not traded during the previous round of optimization the maximum number of shares that can be traded of that security in the next round of optimization (Mi) is set equal to zero at step 916. If the security was traded during the previous round of optimization, the maximum number of shares that can be traded of that security in a particular portfolio during the next round of optimization (Mi) is set equal to the number of shares traded for that security in each portfolio during the previous round of optimization multiplied by the global constraint on the number of shares that can be traded for a security across all the portfolios divided by the aggregate number of shares that were traded for a security across all the portfolios during the previous round of optimization [Si*(MTOTAL/STOTAL)] at step 912.
Next the system checks to see if “crossing” is permitted at step 918. “Crossing” occurs when an individual stock is both bought and sold across the multiple portfolios being optimized. If “crossing” permitted, than the optimization is rerun with the adjusted constraints at step 926. If “crossing” is not permitted then a determination of the aggregate number of shares of a particular security bought (Si-BOUGHT) and sold (Si-SOLD) across all of the optimized portfolios must be determined at step 920.
It is determined at step 922 whether the aggregate number of shares of a particular security bought (Si-BOUGHT) is greater than the aggregate number of shares of a particular security sold (Si-SOLD). If so, then the maximum number of shares that can be sold for that security during the next round of optimization is set to zero at step 928. If the aggregate number of shares of a particular security bought (Si-BOUGHT) is less than the aggregate number of shares of a particular security sold (Si-SOLD), then the maximum number of shares that can be bought for that security during the next round of optimization is set to zero at step 924. In one embodiment, when a buy or sell side is set to zero to prevent “crossing,” the adjusted constraints to be used during subsequent optimization rounds relate only to the buy or sell side which is not set to zero. Finally, the optimization is rerun (step 926) using the adjusted constraints.
Referring back to the example begun with reference to
Assuming “late comers” and “crossing” are both permitted the adjustment might be the following. Using the formula from
M1-1: S1≦33 Shares Traded [100*(100/300)]
M1-2: S2≦50 Shares Traded [100*(100/200)]
M1-3: Total Trade Cost≦$200
M2-1: S1≦33 Shares Traded [100*(100/300)]
M2-2: S2≦50 Shares Traded [100*(100/200)]
M2-3: Total Trade Cost≦$200
M3-1: S1≦33 Shares Traded [100*(100/300)]
M3-2: S2≦50 Shares Traded [100*(100/200)]
M3-3: Total Trade Cost≦$200
Therefore, the next round of optimization might yield an outcome like the following:
The aggregate data for the current round of optimization satisfies all of the global constraints. The total trade cost was reduced to a lower level which satisfies the global constraint due to the difference in the number of shares traded of each security. The satisfactory aggregate data is shown below:
Therefore, by adjusting the constraints in accordance with the claimed invention the optimization was able to adjust the constraints on individual portfolio optimization in order to satisfy global constraints place on the plurality of portfolios as a whole.
The optimal set of portfolios h1, . . . , hK, which is computed by the algorithm above, minimizes the value of the maximum relative or absolute distance of the value of the objective function Ωk(hk) from the value Ωk(hkOpt), where maximum is taken over all portfolios h1, . . . , hK. This set also satisfies the constraint on the total portfolio Σk=1,Khk. Therefore, the solution satisfies the properties required by portfolio managers in multi-portfolio optimization.
In some embodiments, the time needed to solve the first step in the algorithm is substantially equal to the time of finding the optimal solution for all portfolios hk, k=1, . . . , K. This is to be solved even without additional constraint on the total portfolio. In the second step, one more optimization problem is to be solved. However, this should not take substantially more time than for the solution in the first step. In some embodiments, we can use the fact that the optimal solution we have in the first step is the optimal solution for the problem in the second step if the constrain on the total portfolio is relaxed. Therefore, we can first calculate a dual solution for the relaxed problem. Then, we can use this as an initial feasible solution to solve the problem dual to the problem in the second step of the algorithm. This approach can speed up finding the optimal solution in the second step of the algorithm.
Referring to
Multi-portfolio optimization can be formulated as an objective function, which is a linear product of multiple individual portfolio objectives subject to individual portfolio constraints and global constraints. The optimal value of an individual portfolio objective function when individually optimized can be represented as Ω*i where i=1, . . . n portfolios. The least optimal value of an individual portfolio objective function when optimized with the imposition of global constraints can be represented as Ωistart where i=1, . . . n portfolios. Therefore, an individual portfolio objective optimization will fall in the range between Ω*i and Ωistart. This range can be represented as
Using these terms, a new slack variable represented as ΔΩi, can be defined by the inequality abs(Ω*i−Ωi(xi))/
If individual portfolios that are part of a multi-portfolio optimization have different types of objectives (for example risk, tracking error, return, etc . . . ), over-trading or under-trading of some individual portfolios can result. This situation is often precipitated by size differences in multiple-portfolios that are being optimized together. In this situation, it may be necessary to properly scale or weight the objectives of the individual portfolios such that all portfolios will be traded fairly.
Global constraints are to be considered in optimizing the total plurality of portfolios. Some global constraints that can be used would relate to, but are not limited to: total assets traded (percentage, number, monetary), total assets sold (percentage, number, monetary), ACE costs, total assets bought (percentage, number, monetary), acceptable risk levels, transaction costs, late corners, and crossing.
Next, at step 1008, constraints can be received to be used in optimizing the individual portfolios. Global objectives for optimization are received at step 1010.
Global objectives are to be considered in optimizing the total plurality of portfolios and allow managers to apply greater overarching management strategies to investment portfolios. Some global objectives that can be used would relate to, but are not limited to: risk, return, minimization/maximization of the sum of the individual portfolio deviations, or minimization/maximization/equalization of individual portfolio deviation. Individual portfolio deviation may be represented as a slack variable.
Next, at step 1012, individual portfolio objectives to be used in optimizing the individual portfolios are received. These objectives might relate to risk or return.
The portfolios are optimized independently using the constraints and objectives on individual portfolios at step 1014. This newly optimized asset data is then aggregated at step 1016, and the aggregated optimization asset data is checked to determine if it is within the bounds of the global constraints at step 1018. If the aggregate optimized asset data satisfies the global constraints, a determination is made at step 1020 to check if the solution best meets the global objectives. If the solution meets the global objectives, the optimization solutions for the portfolios are displayed at step 1024.
In the event that the aggregate optimized asset data either fails to satisfy the global constraints or fails to meet the global objectives, the individual objective functions are “punished” at step 1022 and the optimization is rerun beginning with step 1014. Objectives are punished in an effort to satisfy the global constraints on the optimization. The technique of Lagrangian Relaxation can be used. The amount that an objective function is “punished” is determined using Lagrangian Dual Problems, which is part of Lagrangian Relaxation method—a well known technique in the field of optimization.
While it is not necessary that a global objective be applied to the multi-portfolio optimization, this option provides for an additional level of control which has not historically been available in multi-portfolio optimization solutions. Two examples of global objectives are: the minimization of the sum of the individual portfolio deviations, and the minimization of the worst individual portfolio deviation. These examples discussed in further detail below.
When optimizing objectives and constraints across multiple portfolios, unintended consequences can occur when portfolios of disproportionate sizes are optimized together, because all of the individual accounts of the multiple portfolios are linked by the cumulative number of shares to be traded. Specifically, if two or more portfolios are of different sizes, and have a common asset to be traded, then the larger portfolio will in some cases adversely affect the trading of the smaller portfolio(s).
For example, two portfolios, A and B, when optimized individually have shares of IBM to BUY. Portfolio A is ten times larger than portfolio B, and while portfolio A needs to BUY 100,000 shares, portfolio B needs only to BUY 10,000 shares. However, portfolio A's BUY of 100,000 shares will drive up the price of IBM stock and adversely affect portfolio B's smaller BUY of 10,000 shares.
Additionally, to establish fairness, the invention, in some embodiments, allows for transaction costs to be split between portfolios in situations were crossing is allowed. For example, a large portfolio trading a large number of shares incurs less transaction cost per share than a small portfolio trading a small number of shares. Thus, in situations were crossing is allowed and a large portfolio has benefited from crossing, the transaction costs associated with the trading of the small portfolio can be redistributed, wholly or in part, to the larger portfolio in an effort to prevent adversely affecting the smaller portfolio.
Thus, according to an embodiment of the present invention, the optimization systems and methods may include features for ensuring fairness when portfolios of disproportionate sizes are optimized together, to reduce unintended consequences resulting from the size difference.
An aspect of fairness can be achieved, while at the same time reducing trading costs, by optimizing an amount of cross trading between portfolios and/or reduction or elimination of trades by smaller portfolios when larger portfolios are trading significant volumes of the same assets. The trading cost per share of each security is set to depend upon the total trading volume of the security traded by all managers of the relevant portfolios. In modeling trading costs, algorithms for the distribution of the net volume of trading among multiple portfolios being optimized take into consideration the total wealth of each portfolio and, therefore, the trading cost per share is less expensive for the larger portfolios. One embodiment of this invention can be described according to the following model.
Part of the model of individual portfolio i related to the trading cost can be presented as:
w
i(a)−bi(a)+si(a)=hi(a),
b
i(a)≧bcosti(a), si(a)≧scosti(a),
v
i(a)=bcosti(a)+scosti(a),
where wi(a)—is the allocation of asset a of the portfolio i, bi(a), si(a)—buy and sell volumes, respectively (as a fraction of portfolio i wealth), of asset a, hi(a)—initial holdings of asset a of the portfolio. a—is an assets universe and I—is the number of individual portfolios.
When crossing is allowed, some of the multiple portfolios being optimized portfolios buy securities from other portfolios. This type of transaction is considered to be “free” (i.e., no additional transaction costs). Only the net balance of non-crossed shares must be bought or sold on the open market. Therefore, in general, each portfolio has transaction expenses only for external buying and selling of securities (volume): bcosti(a)−, scosti(a) and vi(a).
The total net volume imbalance for all portfolios can be represented by the equality:
This equality can also be rewritten in the linear form with the following two inequalities:
The transaction cost per share depends on the total net volume of trading, v(a). The transaction cost per share can be found using the following:
Based on this model, the trading cost allocation per asset across portfolios depends on the total trading volume of the asset, the wealth of the portfolio, portfolio objective and portfolio constraints.
Thus, transaction costs that are shared across disproportionately sized portfolios can be assigned to the larger of the portfolios because the cost of the trades for the large portfolio is less expensive, on a relative basis, than the cost of the trades for the small portfolio. Any other preferences can be imposed by introduction of the trading cost utility functions to the model.
In cases where crossing is not a “free” transaction, the model can be modified as:
t
cost
i(a)=φ(v(a))*vi(a)+tcross(bi(a)−bcosti(a)+si(a)−scosti(a)) ∀i=1, . . . , I, aεA,
where tcross is the transaction cost per trade for the crossed trades. However, when crossing is not allowed and multiple disproportionately sized portfolios are trading the same asset in the same direction, it may be best to reduce or completely eliminate the trades for the smaller portfolios due to the increased transaction cost driven by the trades of the larger portfolios.
Take an example having 2 disproportionately sized portfolios, which have the following characteristics:
A comparison of individual optimization and multi-portfolio optimization without crossing and taking into account fairness would look as follows:
The individual optimization of each portfolio requires the trading of assets APC, BBY, and BIIB. However, the individual optimization does not take into account the fact that the smaller portfolio 1 will face by the same price impact as the larger portfolio 2, even though portfolio 1's volume is ten times smaller than portfolio 2.
The multi-portfolio optimization recognizes the price impact that will be felt by portfolio 1, and finds a different allocation that does not require trading in APC, BBY, and BIIB for portfolio 1. While the different allocation leads to a slightly higher tracking error, the corresponding utility loss is more than offset by a reduction in the trading costs, as shown in the following table.
The multi-portfolio global objective for the minimization of the sum of the individual portfolio deviation is used to minimize the collective ΔΩi of the portfolios. This means that the sum of ΔΩi (deviation of each portfolio from its optimal value as a fraction between 0 and 1) will be minimized to the detriment of any other individual objective. Minimizing the deviation of each individual portfolio from its optimal value assures that larger portfolios are not given preference over smaller portfolios due to disproportionate trade volumes.
The multi-portfolio global objective for the minimization of the sum of the individual portfolio deviation can be presented mathematically, as follows:
Multiple portfolios that are trying to meet this global objective will be, in part, optimized individually and checked for global constraint adherence. The best solution to this objective would be that each individual portfolio's optimization solution, which can be expressed as Ω*i=Ωistart, also be a feasible optimization solution under any global constraints. However, in situations where Ω*i=Ωistart does not occur, the individual objectives can be “punished” in order to minimize the sum deviation across all portfolios.
The multi-portfolio global objective for the minimization of the worst individual portfolio deviation is used to minimize the worst individual ΔΩi of the portfolios. This means that the ΔΩi (deviation of each portfolio from its optimal value as a fraction between 0 and 1) of the portfolio having the worst deviation will be improved upon to the detriment of any other individual objective. This is a safeguard against treating large and small portfolios differently, in that if a small portfolio has the worst deviation the large portfolio's deviation will be harmed in an effort to improve the small portfolio's deviation. In some cases, this global objective will result in a solution where each portfolio has an equivalent ΔΩi.
The multi-portfolio global objective for the minimization of the worst individual portfolio deviation (F*) can be presented mathematically, as follows:
For multi-portfolio optimization using objectives, the values of Ω1start and Ω2start can be obtained by solving the problem: E. 6
subject to E. and E. E. 6 finds the minimal number of shares that must be traded to satisfy both portfolios requirements.
Multiple portfolios that are trying to meet this global objective will be, in part, optimized individually and checked for global constraint adherence. The best solution to this objective would be that each individual portfolio's optimization solution, which can be expressed as Ω*i=Ωistart, also be a feasible optimization solution under any global constraints. However, in situations where Ω*i=Qistart does not occur, the next best solution would be a solution where each portfolios ΔΩi is equal. In order to arrive at this solution, the individual objectives can be “punished” in order to minimize of the worst individual portfolio deviation.
Examples of Multi-Portfolio Implementation with Global Objectives
The proposed approach is now demonstrated in the following two examples. In each example, two long-only portfolios (n=2) with a “universe” of S&P 500 are optimized. The data that is used in this example has been taken from the 31 Dec. 2006 ITG-daily risk model files: specific risk values are alpha and the closing price.
In the first example, two portfolios have cash allocations, and in the second example these portfolios have been rebalanced with different requirements.
In the first example, the pertinent information is:
Portfolios 1 and 2 are bounded by the total trading volume of 200,000 shares. In order to calculate the range
A graphical representation of the multi-portfolio optimization results of these portfolios under Methods A and B and a heuristic approach are illustrated in
Example 2 is a more complex scenario involving global constraints, individual constraints, global objectives, and individual objectives.
In the first example, the pertinent information is:
Portfolios 1 and 2 are bounded by the total trading cost of $40,000.00. In order to calculate the range
The results of the individual optimization of the portfolios do not satisfy the global constraint. Specifically, the global constraint limiting the total trading cost to $40,000.00 has not been satisfied. Therefore, the individual objectives will be “punished.”
Further, this example takes into account the possibility that crossing can be a constraint that impacts the total trading cost during portfolio optimization. Specifically, in this example the trading cost is more expensive if crossing is not allowed. Parenthesis around a number in a trading cost column denotes that crossing the increased cost that would occur if crossing were not allowed.
The data used to create
While illustrative embodiments of the invention have been described herein, the present invention is not limited to the various embodiments described herein, but includes any and all embodiments having modifications, omissions, combinations (e.g., of aspects across various embodiments), adaptations and/or alterations as would be appreciated by those in the art based on the present disclosure. The limitations in the claims are to be interpreted broadly based on the language employed in the claims and not limited to examples described in the present specification or during the prosecution of the application, which examples are to be construed as non-exclusive. For example, in the present disclosure, the term “preferably” is non-exclusive and means “preferably, but not limited to.” Means-plus-function or step-plus-function limitations will only be employed where for a specific claim limitation all of the following conditions are present in that limitation: a) “means for” or “step for” is expressly recited; b) a corresponding function is expressly recited; and c) structure, material or acts that support that structure are not recited.
This application is a continuation-in-part of U.S. patent application Ser. No. 11/730,750, entitled “Method and System For Multiple Portfolio Optimization,” filed on Apr. 3, 2007, which is a continuation-in-part of U.S. patent application Ser. No. 10/640,630, filed on Aug. 14, 2003, which claims priority to U.S. Provisional Application Ser. No. 60/448,147 filed on Feb. 20, 2003. This application also claims priority to U.S. Provisional Application Ser. No. 60/907,525, filed on Apr. 5, 2007. The entire contents of each of these applications are incorporated herein by reference.
Number | Date | Country | |
---|---|---|---|
60448147 | Feb 2003 | US | |
60907525 | Apr 2007 | US |
Number | Date | Country | |
---|---|---|---|
Parent | 11730750 | Apr 2007 | US |
Child | 11955078 | US | |
Parent | 10640630 | Aug 2003 | US |
Child | 11730750 | US |