Method and system for predicting maximum build rate of push-the-bit rotary steering tool

Information

  • Patent Grant
  • 12180821
  • Patent Number
    12,180,821
  • Date Filed
    Wednesday, May 15, 2024
    8 months ago
  • Date Issued
    Tuesday, December 31, 2024
    25 days ago
Abstract
A method and system for predicting a maximum build rate of a push-the-bit rotary steering tool is provided. In the method, a mechanical mathematical model of a push-the-bit rotary steering device is combined with measured well inclination data of the rotary steering device during actual drilling, a theoretical maximum build rate of a steering tool is calculated by the mechanical mathematical model, and a correction factor is combined with the mechanical mathematical model to predict a maximum build rate of the steering tool during a drilling operation in a same layer of a same block. The method effectively solves the problem of predicting the maximum build rate of the push-the-bit rotary steering device with different parameter changes based on measured data. Therefore, the method and system provide a reliable means for operators to analyze the performance of the push-the-bit rotary steering device, thereby providing technical support for efficient drilling operations.
Description
CROSS REFERENCE TO THE RELATED APPLICATIONS

This application is based upon and claims priority to Chinese Patent Application No. 202311154640.3, filed on Sep. 8, 2023, the entire contents of which are incorporated herein by reference.


TECHNICAL FIELD

The present disclosure relates to the technical field of drilling and mining, and in particular to a method and system for predicting a maximum build rate of a push-the-bit rotary steering tool.


BACKGROUND

Oil and gas are indispensable sources of energy for economic development, but their yield cannot meet the needs of national economic development, resulting in a high degree of dependence on foreign oil and gas resources. Therefore, achieving efficient development of oil and gas resources has always been an important task for major oil companies.


Oil and gas reservoirs are buried at a depth of thousands or even tens of thousands of meters, and are often not located directly below the wellhead. Thus, directional drilling is needed to extend the wellbore trajectory forward to the oil and gas reservoir according to the design shape. The operational capability of directional drilling tools is directly related to efficient development of oil and gas resources. Compared to traditional directional drilling tools (such as screw), rotary steering tools can adjust and control the extension trend of the wellbore trajectory during the rotation of the drill string, thereby achieving a longer footage and a smoother trajectory per unit of drilling time. Therefore, rotary steering tools are a type of efficient directional drilling tool.


In recent years, Chinese major oil companies have successively achieved the localization of rotary steering tools through technological breakthroughs. The operational capability of rotary steering tools is generally evaluated by maximum build rate. For two-dimensional wellbore trajectories, the maximum build rate refers to the maximum rate of inclination change that can be achieved when the rotary steering tool adjusts the extension trend of the wellbore trajectory. For three-dimensional wellbore trajectories, the maximum build rate refers to the maximum rate of overall angle change that can be achieved.


Directional well engineers select appropriate rotary steering tools based on the maximum rate of overall angle change of the designed wellbore trajectory or design the wellbore trajectory based on the maximum build rate of the rotary steering tool. Therefore, estimating the maximum build rate of the rotary steering tool is an important task before using the rotary steering tool for construction. The push-the-bit rotary steering tool is the main type of domestic rotary steering tool. However, there is currently a lack of a method for predicting the maximum build rate of the push-the-bit rotary steering tool by combining a mechanical mathematical model with measured well inclination data.


To solve the above technical problems, it is highly desirable to develop a method and system for predicting a maximum build rate of a push-the-bit rotary steering tool.


SUMMARY

To solve the above technical problems, the present disclosure provides a method for predicting a maximum build rate of a push-the-bit rotary steering tool, including the following steps:

    • step 1: selecting a push-the-bit rotary steering device that has been used in an actual directional well operation;
    • step 2: calculating, by a mechanical mathematical model, a theoretical maximum build rate of the push-the-bit rotary steering device;
    • step 3: calculating a measured maximum build rate in a working well depth interval based on measured well inclination data and a record of a steering force used by the rotary steering device in the working well depth interval;
    • step 4: calculating a correction factor based on the theoretical maximum build rate and the measured maximum build rate; and
    • step 5: changing a parameter in the mechanical mathematical model based on the correction factor to predict a maximum build rate of the push-the-bit rotary steering device with a different configuration.


In a further solution, the mechanical mathematical model is established by: setting a current wellbore curvature of the rotary steering device as kc, mechanically simplifying the rotary steering device by assuming the rotary steering device as being formed by two beam columns, and acquiring a beam column model of the rotary steering device, where the push-the-bit rotary steering device is simplified to include a drill bit, a stabilizer, and a steering device.


In a further solution, in the calculation by the mechanical mathematical model, parameters are recorded, including an outer diameter Dbit of the drill bit, an outer diameter Dsta of the stabilizer, a weight on bit WOB, a pushing force Fp generated by a pushing pad, a distance LAC from the drill bit to the pushing pad, a distance LCB from the pushing pad to the stabilizer, a length LAB of the steering device, an outer diameter Dot of the steering device, an inner diameter Dit of the steering device, a bending stiffness EI of the steering device, and a linear weight qt of the steering device, where LAB=LAC+LCB.


In a further solution, in the beam column model, a displacement yAC of the rotary steering device under a stress between the drill bit and the pushing pad and a displacement yCB between the pushing pad and the stabilizer are expressed as follows:











y
AC

=



c
2



cos

(

x




WOB


cos

(


L
AB



k
c


)


EI



)


+


c
1



sin

(

x




WOB


cos

(


L
AB



k
c


)


EI



)


+



x
2



q
t



sec

(


L
AB



k
c


)



2

WOB


+


c
3


x

+

c
4



;




(
1
)














y
CB

=



c
6



cos

(

x




WOB


cos

(


L
AB



k
c


)


EI



)


+


c
5



sin

(

x




WOB


cos

(


L
AB



k
c


)


EI



)


+



x
2



q
t



sec

(


L
AB



k
c


)



2

WOB


+


c
7


x

+

c
8



;




(
2
)









    • where, c1, c2, c3, c4, c5, c6, c7, and c8 denote 8 coefficients to be solved, and are calculated by the following boundary conditions:
















y
AC




"\[LeftBracketingBar]"


x
=

-

L
AB





=



1
2

×

k
c

×

L
AB
2


+


D
bit

2







(
3
)
















y
AC




"\[LeftBracketingBar]"


x
=

-

L
CB





=


y
CB




"\[LeftBracketingBar]"


x
=

-

L
CB










(
4
)
















y
CB




"\[LeftBracketingBar]"


x
=
0



=



D
sta

2

+

(


D
bit

-

D
sta


)







(
5
)

















dy
AC

dx




"\[LeftBracketingBar]"


x
=

-

L
AB





=
0





(
6
)



















dy
AC

dx



"\[RightBracketingBar]"



x
=

-

L
CB




=


dy
CB

dx




"\[RightBracketingBar]"



x
=

-

L
CB







(
7
)




















d
2



y
AC



dx
2




"\[RightBracketingBar]"



x
=

-

L
CB




=



d
2



y
CB



dx
2





"\[RightBracketingBar]"



x
=

-

L
CB







(
8
)


















d
2



y
CB



dx
2




"\[RightBracketingBar]"



x
=
0


=
0




(
9
)























-
EI





d
3



y
AC



dx
3





"\[RightBracketingBar]"



x
=

-

L
AB




-


F
c




dy
AC

dx





"\[RightBracketingBar]"



x
=

-

L
CB




-

EI




d
3



y
CB



dx
3






"\[RightBracketingBar]"



x
=

-

L
CB




-


F
c




dy
CB

dx



=

F
pmax





(
10
)









    • where, Fc=WOB×cos (kc×LAB).





In a further solution, after the 8 coefficients to be solved are calculated, a lateral force on the drill bit is calculated:
















F
d

=

EI




d
3



y
AC



dx
3






"\[RightBracketingBar]"



x
=

-

L
AB




+


F
c




dy
AC

dx





"\[RightBracketingBar]"



x
=

-

L
AB




-

WOB
×

sin

(


k
c

×

L
AB


)






(
11
)









    • where, Fd denotes the lateral force on the drill bit.





In a further solution, after the lateral force on the drill bit is calculated, the theoretical maximum build rate of the rotary steering device is calculated:

kmax=FindRoot(Fd=0,kc)  (12)

    • where, kmax denotes the maximum build rate; the theoretical maximum build rate is acquired by letting the lateral force Fd on the drill bit be 0 and calculating the wellbore curvature kc in the expression; and FindRoot denotes a root-finding function.


In a further solution, after predicting the theoretical maximum build rate, measured well inclination data of a rotary steering tool with a same parameter during a drilling operation in a certain layer of a certain block is processed, and a measured maximum build rate of the steering tool during drilling in the layer is calculated as follows:

    • a series of steering commands during the operation in the layer are assumed as including different steering force percentages SFR and steering orientations STF, a starting well depth and an ending well depth of each steering command in an action period are defined as MDst and MDed, respectively, and a measured maximum build rate in a well depth interval under the action of the command is calculated:










Dogleg
max
i

=


DoglegFun

(


Inc
st

,

Azi
st

,

Inc
ed

,

Azi
ed


)



(


MD
ed

-

MD
st


)

×

SFR
100







(
13
)









    • where, DoglegFun denotes a dogleg calculation function that is a common calculation function in directional well engineering;

    • a set of measured maximum build rates for different steering commands during the operation in the layer is calculated, and a representative measured maximum build rate from n measured maximum build rates of the set is selected by using different filtering methods, specifically a median taking method or an average taking method:

      Doglegmax=FilterFun(Doglegmax1,Doglegmax2,Doglegmax3, . . . ,Doglegmaxn)  (14)

    • where, FilterFun denotes a filtering function, and a corresponding filtering method is used as needed.





In a further solution, the correction factor α is calculated based on the measured maximum build rate and the theoretical maximum build rate:









α
=


Dogleg
max


k
max






(
15
)









    • where, kmax denotes the maximum build rate, and Doglegmax denotes the measured maximum build rate.





In a further solution, after the correction factor α is calculated, different parameters are substituted into the mechanical mathematical model expressed by Eqs. (1) to (12) to predict the maximum build rate kRSS of the rotary steering device in the same layer of the same block:

kRSS=α×kmax  (16)

    • where, α denotes the correction factor, and kmax denotes the maximum build rate.


The present disclosure provides a computer system, including a memory and a processor, where the memory is configured to store a computer program executable on the processor; and the processor is configured to execute the computer program to implement the steps of the method for predicting a maximum build rate of a push-the-bit rotary steering tool according to any one of the above paragraphs.


Compared with the prior art, in the present disclosure, the method and system for predicting a maximum build rate of a push-the-bit rotary steering tool have the following beneficial effects.


In the present disclosure, the mechanical mathematical model of the push-the-bit rotary steering device is combined with the measured well inclination data of the rotary steering device during actual drilling, the theoretical maximum build rate of the steering tool is calculated by the mechanical mathematical model, and the correction factor is combined with the mechanical mathematical model to predict the maximum build rate of the steering tool during the drilling operation in the same layer of the same block. The present disclosure effectively solves the problem of predicting the maximum build rate of the push-the-bit rotary steering device with different parameter changes based on the measured data. Therefore, the method provided by the present disclosure provides a more reliable means for operators to analyze the performance of the push-the-bit rotary steering device, thereby providing technical support for efficient drilling operations. The present disclosure has high practicability and application value.





BRIEF DESCRIPTION OF THE DRAWINGS


FIG. 1 is a flowchart of a method and system for predicting a maximum build rate of a push-the-bit rotary steering tool according to the present disclosure;



FIG. 2 is a structural diagram of a push-the-bit rotary steering device in a wellbore according to the present disclosure; and



FIG. 3 is a force diagram of a mechanical mathematical model of the push-the-bit rotary steering device in the wellbore according to the present disclosure.





DETAILED DESCRIPTION OF THE EMBODIMENTS

The present disclosure is further described below with reference to the drawings and implementations.


An embodiment of the present disclosure provides a method for predicting a maximum build rate of a push-the-bit rotary steering tool. As shown in FIG. 1, the method includes the following steps.

    • Step 1. A push-the-bit rotary steering device that has been used in an actual directional well operation is selected.
    • Step 2. A theoretical maximum build rate of the push-the-bit rotary steering device is calculated by a mechanical mathematical model.
    • Step 3. A measured maximum build rate in a working well depth interval is calculated based on measured well inclination data and a record of a steering force used by the rotary steering device in the working well depth interval.
    • Step 4. A correction factor is calculated based on the theoretical maximum build rate and the measured maximum build rate.
    • Step 5. A parameter in the mechanical mathematical model is changed based on the correction factor to predict a maximum build rate of the push-the-bit rotary steering device with a different configuration.


It should be noted that in this embodiment, the mechanical mathematical model is established by analyzing the structure of the push-the-bit rotary steering tool, and the theoretical maximum build rate is calculated based on the mechanical mathematical model. Then, the measured maximum build rate of the steering tool is calculated based on the measured well inclination data and the steering commands of the rotary steering tool, and the correction factor is calculated based on the measured maximum build rate and the theoretical maximum build rate. Finally, the maximum build rate of the push-the-bit rotary steering tool is predicted based on the correction factor. In this way, a method for predicting the maximum build rate of the push-the-bit rotary steering tool by combining the mechanical mathematical model with the measured well inclination data is formed.


Specifically, in the method of predicting the maximum build rate of the push-the-bit rotary steering tool based on the mechanical mathematical model and the measured well inclination data, firstly, the mechanical mathematical model is established according to the structure of the push-the-bit rotary steering tool, and the theoretical maximum build rate of the steering tool is calculated based on the mechanical mathematical model. Then, the measured well inclination data of the steering tool in a certain well depth interval during the drilling operation in a certain layer underground is combined with the steering commands of the rotary steering tool to acquire a set of measured maximum build rates of the steering tool in that well depth interval. The set is processed to acquire a representative measured maximum build rate of the steering tool. Based on the measured maximum build rate and the theoretical maximum build rate, the correction factor is calculated. Finally, the correction factor is combined with the mechanical mathematical model to predict the maximum build rate of the steering tool during the drilling operation in the same layer of the same block.


The present disclosure combines the mechanical mathematical model of the push-the-bit rotary steering device with the measured well inclination data of the rotary steering device during actual drilling. The present disclosure effectively solves the problem of predicting the maximum build rate of the push-the-bit rotary steering device with different parameter changes based on the measured data. Therefore, the method provided by the present disclosure provides a more reliable means for operators to analyze the performance of the push-the-bit rotary steering device, thereby providing technical support for efficient drilling operations.


In a further solution, the mechanical mathematical model is established by: setting a current wellbore curvature of the rotary steering device as kc, mechanically simplifying the rotary steering device by assuming the rotary steering device as being formed by two beam columns, and acquiring a beam column model of the rotary steering device, where the push-the-bit rotary steering device is simplified to include a drill bit, a stabilizer, and a steering device.


It should be noted that as shown in FIG. 2, the current wellbore curvature of the rotary steering device is assumed as kc, and the rotary steering device is mechanically simplified. Specifically, the rotary steering device is assumed as being formed by two beam columns, and a beam column model of the rotary steering device is acquired. In the present disclosure, according to the major composition of the push-the-bit rotary steering device, the rotary steering device is simplified to include a drill bit, a stabilizer, and a steering device, as shown in FIG. 3. An element of the steering device that applies a pushing force is called a pushing pad. The pushing pad applies the pushing force to a well wall, which generates a counterforce on the drill bit. In this way, a lateral force on the drill bit changes, changing a cutting direction of the drill bit in a formation, such that a trajectory extends according to a preset design.


In a further solution, in the calculation by the mechanical mathematical model, parameters are recorded, including outer diameter Dbit of the drill bit, outer diameter Dsta of the stabilizer, weight on bit WOB, pushing force Fp generated by a pushing pad, distance LAC from the drill bit to the pushing pad, distance LCB from the pushing pad to the stabilizer, length LAB of the steering device, outer diameter Dot of the steering device, inner diameter Dit of the steering device, bending stiffness EI of the steering device, and linear weight qt of the steering device, where LAB=LAC+LCB.


In a further solution, in the beam column model, a displacement yAC of the rotary steering device under a stress between the drill bit and the pushing pad and a displacement yCB between the pushing pad and the stabilizer are expressed as follows:











y
AC

=



c
2



cos

(

x




WOB


cos

(


L
AB



k
c


)


EI



)


+


c
1



sin

(

x




WOB


cos

(


L
AB



k
c


)


EI



)


+



x
2



q
t



sec

(


L
AB



k
c


)



2

WOB


+


c
3


x

+

c
4



;




(
1
)














y
CB

=



c
6



cos

(

x




WOB


cos

(


L
AB



k
c


)


EI



)


+


c
5



sin

(

x




WOB


cos

(


L
AB



k
c


)


EI



)


+



x
2



q
t



sec

(


L
AB



k
c


)



2

WOB


+


c
7


x

+

c
8



;




(
2
)









    • where, c1, c2, c3, c4, c5, c6, c7, and c8 denote 8 coefficients to be solved, and are calculated by the following boundary conditions:
















y
AC




"\[LeftBracketingBar]"


x
=

-

L
AB





=



1
2

×

k
c

×

L
AB
2


+


D
bit

2







(
3
)
















y
AC




"\[LeftBracketingBar]"


x
=

-

L
CB





=


y
CB




"\[LeftBracketingBar]"


x
=

-

L
CB










(
4
)
















y
CB




"\[LeftBracketingBar]"


x
=
0



=



D
sta

2

+

(


D
bit

-

D
sta


)







(
5
)

















dy
AC

dx




"\[LeftBracketingBar]"


x
=

-

L
AB





=
0





(
6
)



















dy
AC

dx



"\[RightBracketingBar]"



x
=

-

L
CB




=


dy
CB

dx




"\[RightBracketingBar]"



x
=

-

L
CB







(
7
)




















d
2



y
AC



dx
2




"\[RightBracketingBar]"



x
=

-

L
CB




=



d
2



y
CB



dx
2





"\[RightBracketingBar]"



x
=

-

L
CB







(
8
)


















d
2



y
CB



dx
2




"\[RightBracketingBar]"



x
=
0


=
0




(
9
)























-
EI





d
3



y
AC



dx
3





"\[RightBracketingBar]"



x
=

-

L
AB




-


F
c




dy
AC

dx





"\[RightBracketingBar]"



x
=

-

L
CB




-

EI




d
3



y
CB



dx
3






"\[RightBracketingBar]"



x
=

-

L
CB




-


F
c




dy
CB

dx



=

F
pmax





(
10
)









    • where, Fc=WOB×cos (kc×LAB).





In a further solution, after the 8 coefficients to be solved are calculated, a lateral force on the drill bit is calculated:
















F
d

=

EI




d
3



y
AC



dx
3






"\[RightBracketingBar]"



x
=

-

L
AB




+


F
c




dy
AC

dx





"\[RightBracketingBar]"



x
=

-

L
AB




-

WOB
×

sin

(


k
c

×

L
AB


)






(
11
)









    • where, Fd denotes the lateral force on the drill bit.





In a further solution, after the lateral force on the drill bit is calculated, the theoretical maximum build rate of the rotary steering device is calculated:

kmax=FindRoot(Fd=0,kc)  (12)

    • where, kmax denotes the maximum build rate; the theoretical maximum build rate is acquired by letting the lateral force Fa on the drill bit be 0 and calculating the wellbore curvature kc in the expression; and FindRoot denotes a root-finding function.


In a further solution, after predicting the theoretical maximum build rate, measured well inclination data of a rotary steering tool with a same parameter during a drilling operation in a certain layer of a certain block is processed, and a measured maximum build rate of the steering tool during drilling in the layer is calculated as follows:


A series of steering commands during the operation in the layer are assumed as including different steering force percentages SFR and steering orientations STF, a starting well depth and an ending well depth of each steering command in an action period are defined as MDst and MDed, respectively, and a measured maximum build rate in a well depth interval under the action of the command is calculated:










Dogleg
max
i

=


DoglegFun

(


Inc
st

,

Azi
st

,

Inc
ed

,

Azi
ed


)



(


MD
ed

-

MD
st


)

×

SFR
100







(
13
)









    • where, DoglegFun denotes a dogleg calculation function that is a common calculation function in directional well engineering.





A set of measured maximum build rates for different steering commands during the operation in the layer is calculated, and a representative measured maximum build rate from n measured maximum build rates of the set is selected by using different filtering methods, specifically a median taking method or an average taking method:

Doglegmax=FilterFun(Doglegmax1,Doglegmax2,Doglegmax3, . . . ,Doglegmaxn)  (14)

    • where, FilterFun denotes a filtering function, and a corresponding filtering method is used as needed.


In a further solution, the correction factor α is calculated based on the measured maximum build rate and the theoretical maximum build rate:









α
=


Dogleg
max


k
max






(
15
)









    • where, kmax denotes the maximum build rate, and Doglegmax denotes the measured maximum build rate.





In a further solution, after the correction factor α is calculated, different parameters are substituted into the mechanical mathematical model expressed by Eqs. (1) to (12) to predict the maximum build rate kRSS of the rotary steering device in the same layer of the same block:

kRSS=α×kmax  (16)

    • where, α denotes the correction factor, and kmax denotes the maximum build rate.


The present disclosure provides a computer system, including a memory and a processor, where the memory is configured to store a computer program executable on the processor; and the processor is configured to execute the computer program to implement the steps of the method for predicting a maximum build rate of a push-the-bit rotary steering tool according to any one of the above paragraphs.


The present disclosure is described in more detail below according to a specific embodiment.


A first step is to record the parameters used in the mechanical mathematical model to calculate the theoretical maximum build rate of the push-the-bit rotary steering device, as shown in Table 1. According to the calculation process sown in Eqs. (1) to (12), substituting the parameters in Table 1 yields a theoretical maximum build rate of 12.94°/30 m.









TABLE 1





Push-the-bit rotary steering device



















Outer
Outer

Pushing force
Outer diameter


diameter of
diameter of
Weight
generated by pad of
of steering


drill bit mm
stabilizer mm
on bit kN
steering device kN
device mm





215.9
212
150
30
190





Linear
Bending
Distance




weight
stiffness of
between
Distance between
Inner diameter


of steering
steering device
drill bit and
pushing pad and
of steering


device N/m
N · m2
pushing pad m
stabilizer m
device mm





2023.21
4.053 × 106
0.67
1.3
50









A second step is to record the measured well inclination data and steering commands of the rotary steering device during the operation in a certain layer of certain block, as shown in Tables 2 and 3. Based on the data in Tables 2 and 3, the measured maximum build rates corresponding to the well depth intervals of four steering commands are calculated as 7.34°/30 m, 9.95°/30 m, 7.76°/30 m, and 8.44°/30 m, respectively. By averaging, a measured maximum build rate of 8.40°/30 m at the working well depth is acquired.









TABLE 2







Record of well inclination data









Well depth m
Inclination angle °
Azimuth angle °





3360.4
44.4
229.6


3379.3
45.7
225.6


3397.7
48.1
222.6


3416.7
49.8
219.6


3454.9
53.3
212.1


3360.4
44.4
229.6
















TABLE 3







Record of steering commands












Starting
Ending
Pushing force
Pushing



well depth
well depth
percentage
force



m
m
%
direction °







3371.00
3391.02
45
290



3391.02
3403.00
50
280



3403.00
3409.80
55
275



3409.80
3428.60
60
275










A third step is to calculate a correction factor of 0.65 based on the theoretical maximum build rate and the measured maximum build rate.


A fourth step is to change the data in Table 1 to calculate the theoretical maximum build rate of the rotary steering device based on different configuration parameters. For example, when the maximum pushing force of the pad in Table 1 is changed to 25 KN, the theoretical maximum build rate is 11.27°/30 m. Based on the acquired correction factor, the maximum build rate of the rotary steering device is 7.33°/30 m.


In summary, this embodiment provides a method for predicting a maximum build rate of a push-the-bit rotary steering tool by combining a mechanical mathematical model with measured well inclination data. Through this method, operators can design the wellbore trajectory based on the maximum build rate of the rotary steering tool, select a rotary steering tool that meets the requirements for adjusting the trajectory trend based on the designed wellbore trajectory, or adjust the structure of the rotary steering tool based on the requirements for the tool's maximum build rate during operation. In this way, during the operation of the rotary steering tool, operators can well control and adjust the extension trend of the wellbore trajectory, thereby improving operational efficiency.


The above is merely an embodiment of the present disclosure and does not constitute a limitation on the patent scope of the present disclosure. Any equivalent structure or equivalent process change made by using the specification and the drawings of the present disclosure, or direct or indirect application thereof in other related technical fields, should still fall in the protection scope of the patent of the present disclosure.

Claims
  • 1. A method for predicting a maximum build rate of a push-the-bit rotary steering tool, comprising the following steps: step 1: selecting a push-the-bit rotary steering device that has been used in an actual directional well operation;step 2: calculating, by a mechanical mathematical model, a theoretical maximum build rate of the push-the-bit rotary steering device;step 3: calculating a measured maximum build rate in a working well depth interval based on measured well inclination data and a record of a steering force used by the push-the-bit rotary steering device in the working well depth interval;step 4: calculating a correction factor based on the theoretical maximum build rate and the measured maximum build rate; andstep 5: changing a parameter in the mechanical mathematical model based on the correction factor to predict a maximum build rate of the push-the-bit rotary steering device with a different configuration;step 6: adjusting a structure of the rotary steering tool based on the predicted maximum build rate during operation,wherein, the mechanical mathematical model is established by: setting a current wellbore curvature of the push-the-bit rotary steering device as kc, mechanically simplifying the push-the-bit rotary steering device by assuming the push-the-bit rotary steering device as being formed by two beam columns, and acquiring a beam column model of the push-the-bit rotary steering device, wherein the push-the-bit rotary steering device is simplified to comprise a drill bit, a stabilizer, and a steering device,wherein in the calculation by the mechanical mathematical model, parameters are recorded, comprising: an outer diameter Dbit of the drill bit, an outer diameter Dsta of the stabilizer, a weight on bit WOB, a pushing force Fp generated by a pushing pad, maximum pushing force Fpmax generated by a pushing pad a distance LAC from the drill bit to the pushing pad, a distance LCB from the pushing pad to the stabilizer, a length LAB of the steering device, an outer diameter Dot of the steering device, an inner diameter Dit of the steering device, a bending stiffness EI of the steering device, and a linear weight qt of the steering device, wherein LAB=LAC+LCB, wherein in the beam column model, a displacement yAC of the push-the-bit rotary steering device under a stress between the drill bit and the pushing pad and a displacement yCB between the pushing pad and the stabilizer are expressed as follows:
  • 2. The method for predicting the maximum build rate of the push-the-bit rotary steering tool according to claim 1, wherein after the 8 coefficients to be solved are calculated, a lateral force on the drill bit is calculated:
  • 3. The method for predicting the maximum build rate of the push-the-bit rotary steering tool according to claim 1, wherein after the lateral force on the drill bit is calculated, the theoretical maximum build rate of the push-the-bit rotary steering device is calculated: kmax=FindRoot(Fd=0,kc)  (12)wherein, kmax denotes the maximum build rate; the theoretical maximum build rate is acquired by letting the lateral force Fd on the drill bit be 0 and calculating the wellbore curvature kc in the expression; and FindRoot denotes a root-finding function.
  • 4. The method for predicting the maximum build rate of the push-the-bit rotary steering tool according to claim 1, wherein after predicting the theoretical maximum build rate, measured well inclination data of a rotary steering tool with a same parameter during a drilling operation in a certain layer of a certain block is processed, and a measured maximum build rate of the rotary steering tool during drilling in the layer is calculated as follows: a series of steering commands during the operation in the layer are assumed as comprising different steering force percentages and steering orientations, a starting well depth and an ending well depth of each steering command in an action period are defined, and a measured maximum build rate in a well depth interval under the action of the command is calculated:wherein, Incst denotes an inclination angle at a starting point of a steering command interval, and Azist denotes an azimuth angle at the starting point of the steering command interval;
  • 5. The method for predicting the maximum build rate of the push-the-bit rotary steering tool according to claim 1, wherein the correction factor α is calculated based on the measured maximum build rate and the theoretical maximum build rate:
  • 6. The method for predicting the maximum build rate of the push-the-bit rotary steering tool according to claim 1, wherein after the correction factor α is calculated, different parameters are substituted into the mechanical mathematical model expressed by Eqs. (1) to (12) to predict the maximum build rate kRSS of the push-the-bit rotary steering device in the same layer of the same block: kRSS=α×kmax  (16)wherein, α denotes the correction factor, and kmax denotes the maximum build rate.
  • 7. A computer system, comprising a processor and a memory, wherein the memory is configured to store a computer program executable on the processor; and the processor is configured to execute the computer program to implement steps of the method for predicting the maximum build rate of the push-the-bit rotary steering tool according to claim 1.
  • 8. The computer system according to claim 7, wherein in the calculation by the mechanical mathematical model, parameters are recorded, comprising: an outer diameter Dbit of the drill bit, an outer diameter Dsta of the stabilizer, a weight on bit WOB, a pushing force Fp generated by a pushing pad, a distance LAC from the drill bit to the pushing pad, a distance LCB from the pushing pad to the stabilizer, a length LAB of the steering device, an outer diameter Dot of the steering device, an inner diameter Dit of the steering device, a bending stiffness EI of the steering device, and a linear weight qt of the steering device, wherein LAB=LAC+LCB.
  • 9. The computer system according to claim 8, wherein in the beam column model, a displacement yAC of the push-the-bit rotary steering device under a stress between the drill bit and the pushing pad and a displacement yCB between the pushing pad and the stabilizer are expressed as follows:
  • 10. The computer system according to claim 9, wherein after the 8 coefficients to be solved are calculated, a lateral force on the drill bit is calculated:
  • 11. The computer system according to claim 10, wherein after the lateral force on the drill bit is calculated, the theoretical maximum build rate of the push-the-bit rotary steering device is calculated: kmax=FindRoot(Fd=0,kc)  (12)wherein, kmax denotes the maximum build rate; the theoretical maximum build rate is acquired by letting the lateral force Fd on the drill bit be 0 and calculating the wellbore curvature kc in the expression; and FindRoot denotes a root-finding function.
  • 12. The computer system according to claim 11, wherein after predicting the theoretical maximum build rate, measured well inclination data of a rotary steering tool with a same parameter during a drilling operation in a certain layer of a certain block is processed, and a measured maximum build rate of the rotary steering tool during drilling in the layer is calculated as follows: a series of steering commands during the operation in the layer is assumed as comprising different steering force percentages and steering orientations, a starting well depth and an ending well depth of each steering command in an action period are defined, and a measured maximum build rate in a well depth interval under the action of the command is calculated:wherein, Incst denotes an inclination angle at a starting point of a steering command interval, and Azist denotes an azimuth angle at the starting point of the steering command interval;
  • 13. The computer system according to claim 12, wherein the correction factor α is calculated based on the measured maximum build rate and the theoretical maximum build rate:
  • 14. The computer system according to claim 13, wherein after the correction factor α is calculated, different parameters are substituted into the mechanical mathematical model expressed by Eqs. (1) to (12) to predict the maximum build rate kRSS of the push-the-bit rotary steering device in the same layer of the same block: kRSS=α×kmax  (16)wherein, α denotes the correction factor, and kmax denotes the maximum build rate.
Priority Claims (1)
Number Date Country Kind
202311154640.3 Sep 2023 CN national
US Referenced Citations (4)
Number Name Date Kind
20090000823 Pirovolou Jan 2009 A1
20140209389 Sugiura Jul 2014 A1
20170211356 Samuel Jul 2017 A1
20230203935 Dahal Jun 2023 A1