The above and other features and aspects of the present invention will become more apparent upon reading the following detailed description in conjunction with the accompanying drawings in which:
As shown in
The fuel cell system 100 in
As mentioned above and shown in
As shown in
As shown in
If, in the third step S3, the power load controller determines that the power output has instantaneously dropped from a high load to a low load, then the controller 501 proceeds to a fourth step S4 in which the controller determines the cause of the drop in load and whether the ability of the system to ramp to a high target power output has been restored. The high target power output is the desired power output at high load conditions, which is substantially the same or close to the high load conditions preceding the instantaneous drop in the power output. For example, when the instantaneous drop in power output is caused by disconnecting from the power grid, the ability to ramp to a high target power output is restored upon reconnecting of the system to the power grid. In another example, when the instantaneous drop in power output from high load to low load is commanded by the controller, for example to facilitate a no-load fuel swap, the ability to ramp the power output is restored upon completion of the no-load fuel swap.
If the controller determines in step S4 that the ability to ramp to a high target power output has not been restored, then the controller's operation proceeds to step S5 to control the system's power output by controlling the input fuel and input water flow rates based on the load determined in step S4. Following step S5, the controller's operation returns to step S4 to again determine the load and whether the ability to ramp to a high target power output has been restored. If it is again determined in S4 that the ability to ramp to a high target power output has not been restored, the controller continues to monitor the ability to ramp to a high target power output and to control the power output of the system based on the determined load (steps S4 and S5) until it is determined in step S4 that the ability to ramp to a high target power output has been restored.
If the controller 501 determines in the fourth step S4 that the ability to ramp to a high power output has been restored, the operation of the controller's operation proceeds to step S6 in which the controller 501 selects an appropriate power load recovery procedure which is then used to increase, or ramp, the power output set point, and thus the power output, of the fuel cell system 100 until the power output is sufficiently high to satisfy the high target power output. In particular, the controller 501 determines in step S6 whether a standard load recovery procedure or a rapid load recovery procedure is to be used for recovering the system's high-power output operation. After the appropriate load recovery procedure is selected in step S6, the controller's operation proceeds to step S7 to control the ramping of the power output of the system in accordance with the load recovery procedure selected in S6 until the high target power output operation of the system is restored. As mentioned herein above, the power output of the system is controlled by controlling the flow rates of the input fuel and the input water to the fuel cell system. When the appropriate load recovery procedure is completed, i.e. the power output of the system is sufficient to satisfy the high target power output, the operation of the controller 501 returns to the first step S1.
As mentioned herein above, the standard, or conventional, load recovery procedure requires a slow gradual increase in the power output of the fuel cell system until the power output is sufficient to satisfy the high target power output on the system so as to avoid damage to the system due to thermal and mechanical stresses. When the standard load recovery procedure is employed, the controller 501 controls the input fuel and input water flow rates so that the power output of the system increases in accordance with the ramping of the power output set point at a standard predetermined rate. The standard predetermined rate is sufficiently slow so as to avoid damage to the fuel cell system. For example, a rate of about 0.5 kW/min can be used when ramping the power output set point of the fuel cell system during the standard load recovery procedure.
Under certain conditions, however, the rapid load recovery procedure may be employed to increase the power output of the system from a low power output to a high power output sufficient to satisfy the high target power output at a significantly higher rate. When the required conditions are satisfied and the rapid load recovery is employed, the controller 501 controls the flow rates of the input fuel and input water to the system such that the power output is increased at a rapid load recovery (“RLR”) predetermined rate, which is higher than the standard predetermined rate, until the power output is sufficient to satisfy the high target power output. For example, the power output of the fuel cell system may be increased by increasing the power output set point at the RLR rate of about 50 kW/min during the rapid load recovery procedure. The use of the rapid load recovery procedure allows the system to reach high load operation to satisfy the high target power output in a significantly shorter period of time as compared to the standard load recovery procedure.
As a consequence of increasing the power output of the system at a high rate, such as the RLR predetermined rate, the ratio of fuel to water in the system may be caused to rapidly decrease in relation to the residence time of the fuel in the fuel path to the anode 108. This, in turn, causes the fuel diluted with steam to advance too slowly into the fuel cell anode 108, thus negatively affecting the electrical output and the overall performance of the system. Accordingly, as will be more fully discussed below, the flow rates of the input fuel and water supplied to the system during the performance of the rapid load recovery procedure need to be controlled such that the carbon to steam ratio of the fuel remains constant while the power output of the system is being increased in order to ensure that the fuel is conveyed to the fuel cell anode at a required rate.
The conditions required for the rapid load recovery procedure to be employed are further discussed in detail with reference to
In a first step S101 of operation of the controller 501 during the high power output operation of the system 100, the controller 501 determines the load and the change in the load. As mentioned herein above, the load on the system can be set or adjusted as desired if the system is connected to the grid, or is determined by the “island load” if the system is not connected to the grid. In the next step S102, the controller 501 determines the power output set point based on the load and change in the load determined in S101, and controls the power output of the system by controlling the input fuel and input water flow rates based on the power output set point. The operation of the controller 501 thereafter proceeds to a third step S103 in which the controller determines whether the power output instantaneously dropped from a high load to a low load. If it is determined in step S103 that the power output did not instantaneously drop, then the operation of the controller returns to the first step S101.
If, however, it is determined in step S103 that the power output instantaneously dropped from a high to a low load, then the operation of the controller proceeds to step S104 in which the controller determines the cause of the drop in load and whether the ability of the system to ramp to a high target power output has been restored. As mentioned herein above, the high target power output is substantially equivalent or close to the power output before the instantaneous drop in the power output from the high load to the low load. If in step S104 the controller 501 determines that the ability to ramp to the high target power output has not been restored, the controller's operation proceeds to step S105 in which the power output set point is determined based on the load determined in S104 and the power output of the system is controlled by controlling the inlet fuel and water flow rates to the system based on the power output set point, and thereafter returns to step S104. As discussed above, the controller 501 continues monitoring the load and controlling the power output set point and the power output of the system by controlling the inlet fuel and water flow rates based on the detected load until it is determined in step S104 that the ability to ramp to the high target power output has been restored.
If the controller 501 determines in step S104 that the ability to ramp to the high target power output has been restored, then the operation of the controller 501 proceeds to step S106a in which the controller 501 determines whether a predetermined time period equal to a first predetermined time period has elapsed since the determination of the instantaneous drop in the power output from the high load to the low load. The first predetermined time period may vary depending on a variety of factors, including the size and type of the fuel cell system. For example, the first predetermined time period for a 250 kW direct-reforming molten carbonate fuel cell system is about 15 minutes. If it is determined in step S106a that the first predetermined time period since the instantaneous drop in power output has elapsed, then the operation of the controller proceeds to step S107 to disable the rapid load recovery procedure and to select the standard load recovery procedure. As mentioned herein above, the standard load recovery procedure is performed by slowly and gradually increasing the power output set point, and thus slowly and gradually increasing the power output of the system 100 in accordance with the power output set point by controlling the flow rates of the input fuel and input water, until the power output is equivalent to the restored high target power output.
If the controller 501 determines in step S106a that the first predetermined time period since the instantaneous drop in the power output has not yet elapsed, then the controller's operation proceeds to step S106b, in which the controller 501 determines whether sufficient time has passed since the last time rapid load recovery procedure had been used. In particular, the controller 501 determines in S106b whether a predetermined time period equal to a second time period has elapsed since the completion of the preceding rapid load recovery procedure. Like the first predetermined time period, the second predetermined time period also varies depending on the type and size of the fuel cell system used. For example, when a 250 kW direct-reforming molten carbonate fuel cell system is employed, the second predetermined time period is equal to 90 minutes.
If the controller 501 determines in step S106b that the second predetermined time period since the completion of the preceding rapid load recovery procedure has not elapsed, then the controller's operation proceeds to step S107 to disable the rapid load recovery procedure and to select the standard load recovery procedure. If the controller 501 determines in S106b that the second predetermined time period has elapsed, then the controller 501 proceeds to step S106c in which the controller 501 senses whether any pre-selected power alarms have been activated. In certain cases, the pre-selected power alarms comprise all power alarms in the fuel cell system 100, while in other cases, the pre-selected power alarms comprise only those power alarms that would have a negative effect on the system's performance during the rapid load recovery procedure. If the controller 501 senses that one or more pre-selected power alarms have been activated, then the controller's operation proceeds to step S107 to select the standard load recovery procedure. However, if the controller 501 confirms that no pre-selected power alarms have been activated, then the controller's operation proceeds to step S108 to select the rapid load recovery procedure for recovering the high power output operation of the fuel cell system.
As discussed above, when the rapid load recovery procedure is selected, the power output of the fuel cell system is increased in accordance with the power output set point at a significantly higher rate than when the standard load recovery procedure is used. In certain embodiments, the power output set point, and thus the power output of the system, is increased at a rate of about 50 kW/min, which is 100 times faster than the rate used in the standard load recovery procedure. During the rapid load recovery performance, the flow rates of the input fuel and the input water are controlled so as to increase the power output of the system in accordance with the power output set point, which is ramped at the RLR predetermined rate. In addition, the controller controls the fuel and water flow rates so that the carbon to steam ratio of the fuel remains constant while the rapid load recovery procedure is being performed in order to ensure that the humidified fuel is conveyed to the fuel cell anode at the required rate. For example, when a 250 kW direct-reforming fuel cell system is used, the controller 501 controls the input fuel and water flow rates so that the carbon to steam ratio remains at about 2.0.
As discussed herein above, the load recovery procedure is performed until the power output of the fuel cell system is sufficient to satisfy the high target power output as determined in step S104. When the power output becomes sufficient to satisfy the high target power output, the load recovery procedure is completed, the fuel cell system is enabled and operating at high power output 300 and the operation of the controller 501 then returns to the first step S101.
The rapid load recovery procedure is particularly useful in fuel cell systems that are connected to a power grid, which allows the value for the power output on the fuel cell system to be pre-set. As mentioned above, when a temporary grid disruption occurs, the fuel cell system 100 may be caused to temporarily disconnect from the power grid, resulting in an instantaneous drop in the power output to the island load, and to reconnect to the grid, resulting in the restoration of the ability to ramp to a high target power output, after a short period of time. In such situations, the rapid load recovery procedure is typically appropriate to allow quick recovery of the power output of the system after the system reconnects to the power grid and the ability to ramp the power output to the high target power output is restored.
As shown in
When the fuel cell system reconnects to the grid in step S203, the ability to ramp to a high target power output has been restored. However, as shown in
As discussed herein above with respect to
If the first predetermined time period has not yet elapsed, then the controller determines whether a second predetermined time period has elapsed since the completion of the previous rapid load recovery procedure. In the illustrative embodiment described herein, the second predetermined time period is 90 minutes. If the controller determines that the second predetermined time period has not elapsed, then the conditions for the rapid load recovery procedure have not been satisfied and rapid load recovery is disabled and the standard load recovery procedure is selected in step S205. If the controller determines that the second predetermined time period has passed, the controller then determines whether any pre-selected power alarms that would prevent rapid load recovery have been activated. If any such power alarms have been activated, then rapid load recovery is disabled and standard load recovery procedure is selected in S205. If the controller determines that no power alarms have been activated, then the conditions for the rapid load recovery procedure have been satisfied and the operation of the system proceeds to step S206 in which the rapid load recovery procedure is selected and performed.
As discussed above, the rapid load recovery procedure is performed by increasing the power output set point, and the power output of the fuel cell system at a significantly higher rate than during the standard load recovery procedure. In the present illustrative embodiment, the RLR rate at which the power output set point is increased during the rapid load recovery procedure is 50 kW/min, while the standard rate at which the power output set point is increased during the standard load recovery procedure is 0.5 kW/min. The power output of the system is increased in accordance with the power output set point by controlling the input fuel and input water flow rates, and during the rapid load recovery procedure the input fuel and water flow rates are controlled such that the carbon to steam ratio remains constant.
The rapid load recovery procedure described herein allows the fuel cell system to recover to high power output operation after a temporary drop from a high load to a low load and subsequent restoration of the ability to ramp to a high target power output at high load conditions in a significantly shorter time period than if the standard load recovery procedure is employed. The ability to quickly recover the high power output operation quickly, in turn, increases the efficiency and power production by the fuel cell system. In addition, because the rapid load recovery procedure is performed within a short time period from the time of the sudden drop in the load, the fuel cell system is not allowed to cool significantly, and the high rate at which the power output of the system is increased does not result in damage to the system components.
It should be noted that the controller 501 can be a conventional PLC (programmable logic controller—essentially highly reliable robust computer) made by GE. The control program used, in turn, can be a software product called “Versapro” again a GE product implementable in GE PLCs for industrial automation. In other embodiments, the controller can be a conventional DCS (distributed control system) manufactured by Foxboro, and the control program can be software implemented in the DCS for industrial automation, also manufactured by Foxboro. In yet another embodiment, the controller can be a conventional PLC-based “Iconics” system.
It is understood that the time periods and other conditions for the performance of the rapid load recovery are not limited to the conditions described herein. As mentioned above, the first and second predetermined time periods used by the controller in determining whether the rapid load recovery procedure should be employed may vary depending on the type and size of the fuel cell. Moreover, other conditions not specifically mentioned herein may be used in determining whether the rapid load recovery procedure should be employed.
In all cases it is understood that the above-described arrangements are merely illustrative of the many possible specific embodiments which represent applications of the present invention. Numerous and varied other arrangements can be readily devised in accordance with the principles of the present invention without departing from the spirit and the scope of the invention.