Claims
- 1. A method of anchoring a floating platform at a predetermined anchoring site by an anchor-laying craft;
- said anchor-laying craft including a working platform for supporting thereon anchors, wells for the anchors, first lengths of chain, winches for wire rope, a chain capstan, drums stowing wire rope wrapped thereabout, standby buoys, a laying device, and block and tackle;
- said floating platform supporting second lengths of chain having one end thereof for fastening to respective mooring lines set by said anchoring-laying craft;
- said method comprising the steps of:
- 1) placing the anchor-laying craft at a predetermined position remote from the predetermined anchoring site of said floating platform where an anchor is to be set at the sea bottom;
- 2) connecting one of said anchors to a first length of chain, bringing the anchor to a position in front of said chain capstan at the level of said working platform via said block and tackle, and paying out said first length of chain via said chain capstan with said anchor coupled thereto until another end of said first length of chain fitted with a first triple link appears at the level of the working platform;
- 3) connecting a spliced eye of said wire rope to said first triple link of said first length of chain at an end remote from the connection of the chain to said anchor, paying out the wire rope to control the total length of the mooring line until the anchor reaches the sea bottom;
- 4) with the anchor set at the sea bottom, moving the laying craft in the direction of the predetermined anchoring site of the floating platform while paying out said first length of chain plus wire rope on the sea bottom, until the other end of said wire rope with a second triple link appears at the level of the working platform;
- 5) disconnecting said wire rope from said laying craft and fastening said other end of said wire rope directly to a pendant chain of a standby buoy by means of said second triple link;
- 6) repeating steps 1) through 5) until all of the wire ropes which comprise the mooring lines are connected to at least one standby buoy at said site;
- 7) bringing the floating platform to the predetermined platform anchoring site defined by said at least one standby buoy;
- 8) liberating the at least one standby buoy and its respective pendant chain; and completing the mooring of the floating platform by fastening a second length of chain on board said floating platform to a respective mooring line, and
- 9) lowering the mooring line to the extent of normal sag of the mooring line by means of the laying device via said anchor-laying craft.
- 2. A method of anchoring a floating platform as claimed in claim 1, wherein each mooring line includes a second triple link which is coupled to an end of the wire rope remote from the end of the wire rope connected to the first length of chain coupled to the anchor, and wherein said step of fastening said mooring line to a standby buoy, comprises fastening of the second triple link directly to a pendant chain of the standby buoy.
- 3. A method of anchoring a floating platform at a predetermined platform anchoring site, performed by an anchor-laying craft, said method comprising:
- sequentially recovering via said anchor-laying craft a plurality of standby buoys in the vicinity of the predetermined anchoring site of the floating platform, each standby buoy holding a mooring line comprising an anchor, a first length of chain coupled at one end to the anchor, a wire rope having one end coupled to an opposite end of said first length of chain, and a first triple link connected between an opposite end of said wire rope and a pendent chain connected to said standby buoy, removing said mooring line from said buoy by use of a chain capstan on said anchor-laying craft and fastening an auxiliary wire rope carried by the anchor-laying craft to said first triple link of said mooring line;
- shifting said anchor-laying craft towards said floating platform while laying said auxiliary wire rope and picking up close to the floating platform, a free end of a second length of chain connected at an opposite end to said floating platform and coupling said second length of chain to a third length of chain of said anchor-laying craft by a second triple link;
- pulling in the auxiliary wire rope with a winch on the anchor-laying craft until said first triple link at the coupling between the auxiliary wire rope and the mooring line rises to the level of the working platform of the anchor-laying craft and then stopping the winch for the auxiliary wire rope on the anchor-laying craft;
- fastening said second triple link at the connection between the second length of chain of said floating platform and the third length of chain connected to the anchor-laying craft to the first triple link at the end of the mooring line held by the auxiliary wire rope by means of a small length of chain fitted on a laying device held by a block and tackle on the anchor-laying craft and transferring the weight of the mooring line to the block and tackle;
- unfastening the third length of chain of the anchor-laying craft from said second triple link connected to the second length of chain of the floating platform, and unfastening the auxiliary wire rope from the first triple link at the end of the mooring line and connecting said auxiliary wire rope to the laying device, releasing said laying device from said block and tackle, and lowering with the auxiliary wire rope the laying device with the mooring line connected to the second length of chain of the floating platform to a sea depth corresponding to the level of normal sag of said mooring line, and recovering the laying device after release of said small length of chain and said mooring line from said laying device; wherein said laying device consists of a bearing base, a sheave, a sheave crown fixed into said bearing case by means of a spindle, said sheave crown having spaced slots in a front flange thereof along a perimeter of the sheave crown, and wherein said method further comprises;
- passing a fusible rope through said slots as guides and fixing said fusible rope to a common lug, deviated in the middle by a guide mounted on said spindle, thereby lying links of said small length of chain at different angles tightly to said sheave crown to prevent any risk for falling or slipping of the mooring line from said laying device during the lowering operation, and wherein the strength of said fusible ropes is calculated to keep said links of said small length of tied in position with respect to said laying device, until the mooring line sags when reaching close to the depth of its normal sag level, said links tied with said fusible tie rope then breaking away from the sheave crown, thereby releasing said small length of chain and consequently the mooring line from the laying device.
- 4. A method for regular inspection or replacement of an item of a mooring line for mooring an oil rig floating platform at a predetermined platform anchoring site, performed by an anchor-laying craft, said method comprising:
- slidably mounting a line fisher on a length of chain connected at one end to said platform and attached at an opposite end to an auxiliary wire rope by a triple link;
- said line fisher comprising a sheave, a sheave crown fixed by means of a spindle to a reinforced body in the shape of a channel having a front part with an enlarged opening to guide the chain through the channel, a lifting eye on top of the line fisher connected to the auxiliary wire rope, and a channel back part, constituting a guiding nozzle acting as a triple link stop, said guiding nozzle having an opening sized to allow only the passage of a single link of said chain;
- lowering said line fisher along said chain whereby said chain passes through said guiding nozzle until said triple link engages said stop thereby positioning said line fisher at a desired hoisting point for recovering the mooring line;
- moving said anchor laying craft away from said platform; and
- pulling in the auxiliary wire rope by a wire rope winch on said anchor-laying craft when said anchor laying craft is positioned beyond the hoisting point of the mooring line, opposite the floating platform.
Priority Claims (1)
Number |
Date |
Country |
Kind |
9000135 |
Jan 1990 |
BRX |
|
CROSS REFERENCE TO RELATED APPLICATIONS
The present application is a continuation of application Ser. No. 07/927,736 filed Aug. 12, 1992, now abandoned, which is a continuation of application Ser. No. 07/640,730 filed Jan. 14, 1991 and now abandoned.
US Referenced Citations (10)
Continuations (2)
|
Number |
Date |
Country |
Parent |
927736 |
Aug 1992 |
|
Parent |
640730 |
Jan 1991 |
|