The invention relates to a method and system for wireline intervention in a subsea well from a floating vessel.
U.S. Pat. No. 6,216,789 describes a method and system for wireline intervention in a subsea well from a floating vessel.
This prior art reference discloses a computer controlled heave compensation wireline logging winch system that compensates for the effects of wave motion on wireline tools suspended from floating vessels. Vessel vertical movement is measured and is physically compensated for by a change in speed of the wireline cable so that the logging data is obtained at a controlled speed. Any error in this physical compensation is detected by a depth measurement system and is used to adjust the true depth at which the logging tool measurements are being recorded.
There is a need to solve two problems associated with the method and system known from U.S. Pat. No. 6,216,789:
(1) Overcome the challenges for upending and overboarding a long, fragile and flexible wireline toolstring from the deck of a floating vessel; and
(2) Accurately heave compensate the toolstring subsea in order to safely stab in the wireline tools into the subsea equipment and control at depth.
Traditionally, subsea well interventions are conducted from heavy-weight, mobile offshore drilling units (MODUs) with riser packages.
Unfortunately, these intervention operations demand substantial operating day rates.
Drilling units offers conventional means to assemble tool string in vertical position and stab in tools through riser packages, therefore heave compensation is usually not an issue. Apart from traditional rig interventions, rigless intervention have been carried out on light intervention vessels that also offers convention ways of assembly and deployment of toolstrings. On those types of vessel, heave compensation is sometimes incorporated to the derrick system itself.
Thus there is a need for an improved wireline intervention method that can be performed from any floating vessel and which does not require use of a large drilling vessel and which overcomes the challenges for upending and overboarding a long, fragile and flexible wireline toolstring from the deck of a floating vessel.
In accordance with the invention there is provided a method for wireline intervention in an subsea well from a floating vessel, the method comprising:
a) arranging a tubular tool riser in a substantially horizontal position at a deck of the vessel;
b) connecting a wireline assembly to a wireline that is connected to a winch arranged at the deck;
c) inserting the wireline assembly and pass the wireline through a first end of the tool riser into said riser such that the wireline passes along a riser sheave connected to the first end of the tool riser;
d) connecting the first end of the tool riser to a crane that lifts the tool riser in a substantially vertical position above the deck, whilst unreeling the wireline from the winch such that the wireline assembly remains located within the tool riser;
e) inducing the crane to move a second end of the tool riser above a guide sleeve which arranged and/or cantilevered off the side of the vessel;
f) inducing the crane to lower the tool riser through the guide sleeve such that the second end of the tool riser is located subsea and the first end of the tool riser and the riser sheave are located above the deck; and
g) inducing a crane heave compensation mechanism to control the motion of the tool riser and riser sheave relative to the seafloor while unreeling the wireline from the winch such that the wireline assembly is lowered from the tool riser through the water into the well.
The first end of the tool riser may be connected by a hoisting cable to a hook which is connected to a single fall line of the crane and the crane heave compensation mechanism is configured to maintain the hook substantially stationary relative to the seafloor, thereby providing heave compensation to the wireline assembly.
Alternatively, the wireline passes through a deck sheave which is connected to the deck adjacent to the sleeve and the hook is connected to a hoisting sheave which is connected by a double fall crane line to the crane and the heave compensation mechanism is configured to substantially halve reduce heave motion of the hook relative to heave motion of the vessel and inducing the deck sheave and riser sheave to provide heave compensation to the wireline assembly.
In accordance with the invention there is further provided a system for wireline intervention into an subsea well from a floating vessel, the system comprising:
a) a floating vessel having a deck configured to support a tubular tool riser in a substantially horizontal position;
b) a winch at the deck which is configured to be connected to a wireline and wireline assembly;
c) means for inserting the wireline assembly and part the wireline through a first end of the tool riser into said riser such that the wireline passes along a riser sheave connected to the first end of the tool riser;
d) a crane that is configured to be connected to the first end of the tool riser and to lift the the tool riser in a substantially vertical position above the deck, whilst unreeling the wireline from the winch such that the wireline assembly remains located within the tool riser;
e) means for inducing the crane to move a second end of the tool riser above a guide sleeve which is connected to a side wall of the vessel adjacent to the deck;
f) a crane control mechanism for inducing the crane to lower the tool riser through the guide sleeve such that the second end of the tool riser is located subsea and the first end of the tool riser and the riser sheave are located above the deck; and
g) a crane heave compensation mechanism for controlling the motion of the tool riser and riser sheave relative to the seafloor while unreeling the wireline from the winch such that the wireline assembly is lowered from the tool riser through the water into the well.
These and other features, embodiments and advantages of the method and/or system according to the invention are described in the accompanying claims, abstract and the following detailed description of non-limiting embodiments depicted in the accompanying drawings, in which description reference numerals are used which refer to corresponding reference numerals that are depicted in the drawings.
Similar reference numerals in different figures denote the same or similar objects.
The system according to invention shown in
I) The tool riser 1, which is a long joint of pipe with a quick connection flange welded to the first end of the riser 1A and a bevelled opposite end (second end of the riser 1B). The tool riser 1 provides a means for the wireline toolstring 7A to be assembled in horizontal position into the tool riser 1 with the support of a work table, safely upended from horizontal to vertical position and finally deployed subsea. As soon as the tools are assembled and secured to the toolstring 7A they are inserted into the tool riser 1 through a quick connection flange at a first end 1A of the tool riser 1. Then the tool riser 1 is upended using a crane hook 2 and dedicated slings 3 connected to the first end 1A of the tool riser 1. This upending method does not offer any risk or damage to the tool strings 7A to be deployed.
II) The tool riser 1 is suspended by an active heave compensated crane hook 2 of a crane (not shown) mounted on the deck 4A of a floating vessel 4. When the heave compensation system on the crane is activated, the tool riser 1 is raised and lowered relative to the deck 4A of the floating vessel 4 keeping the tool string stationary relative to the seafloor, effectively isolating vessel motions from the tool string. As the wireline 7, which may comprises power and control cables or be a slickline without power and control cables, passes through the riser sheave 8 on the tool riser 1, compensation is transferred to the wireline 7.
The tool riser 1 moves up and down through a guide sleeve 5 attached to a work platform 6 cantilevered off the side 4B of the vessel 4. The sleeve 5 allows vertical motion of the tool riser 1, but prevents motion of the tool riser 1 in the horizontal plane. The arrangement of the tool riser 1 through the sleeve 5 prevents the tool riser 1 and crane hook 2 from swinging uncontrollably due to oscillating motions of the vessel 4 due to waves, wind and/or current.
The tool riser 1 extends through the splash zone 9 into the water 11, which may be a sea, ocean or lake to protect the fragile toolstring 7A from damage due to wave action at the water surface.
There are two possible sheave arrangements that can be utilized depending on available deck space on the vessel 4 of opportunity.
Wireline operations on traditional drilling rigs compensate the toolstring 7A in a similar manner.
In
It allows wireline operations to be performed from any vessel 4 of opportunity equipped with an active heave compensated crane hook 2 using a conventional wireline winch.
Number | Date | Country | Kind |
---|---|---|---|
11196263 | Dec 2011 | EP | regional |
The present application is a National Stage (§ 371) application of PCT/US2012/070672, filed Dec. 17, 2012, which claims the benefit of U.S. Provisional Application No. 61/581,193, filed Dec. 29, 2011, and claims priority to European Patent Application No. 11196263.5, filed Dec. 30, 2011, both of which are incorporated herein by reference.
Filing Document | Filing Date | Country | Kind |
---|---|---|---|
PCT/US2012/070672 | 12/19/2012 | WO | 00 |
Publishing Document | Publishing Date | Country | Kind |
---|---|---|---|
WO2013/101601 | 7/4/2013 | WO | A |
Number | Name | Date | Kind |
---|---|---|---|
2809436 | Worthington et al. | Oct 1957 | A |
3650323 | Kanady | Mar 1972 | A |
4695191 | Wagstaff | Sep 1987 | A |
6216789 | Lorsignol et al. | Apr 2001 | B1 |
20100104372 | Lawson et al. | Apr 2010 | A1 |
20110254234 | Xu | Oct 2011 | A1 |
Number | Date | Country |
---|---|---|
1070828 | Jan 2001 | EP |
2292760 | Mar 1996 | GB |
Entry |
---|
PCT International Search Report, Application No. PCT/US2012/070672 dated Jan. 30, 2013. |
Number | Date | Country | |
---|---|---|---|
20150176346 A1 | Jun 2015 | US |
Number | Date | Country | |
---|---|---|---|
61581193 | Dec 2011 | US |