Field of the Invention:
The invention relates to a method for renewing sleepers of a track formed from rails and the sleepers, wherein, in the region of skids which support a machine frame of a track construction machine on the sleepers, the rails are spaced apart from one another with respect to a track transverse direction extending normally to a track longitudinal direction. The invention also relates to a track construction machine for carrying out the method.
According to EP 0 670 932 B1, a track construction machine for renewing railroad tracks is known, which has a machine frame supported on rail bogies. At one end thereof, devices for picking up old sleepers and laying new sleepers and for preparing the ballast bed are arranged on a boom that projects in the machine longitudinal direction. The rail bogie located in this region is supported on skids during the working phase, said skids being movable on the old sleepers of the track after the sleepers have been freed from the old rails by spreading apart the latter.
EP 0 089 076 B1 and CH 683 011 A5 also describe such supporting of a bogie of a machine frame on exposed sleepers of a track via skids.
The object of the present invention is now to create a method and a track construction machine of the type mentioned at the beginning, with which a sleeper changing operation is able to be optimized.
This object is achieved according to the invention with a method and a track construction machine of the generic type by the features as claimed.
The possibility, created hereby, of a sleeper change without the conventional severing, normal for this purpose, of the old rails is of great advantage in particular at those sites at which only the sleepers need to be renewed, but not the rails. In these cases, which arise relatively frequently in practice, it has hitherto been necessary to reconnect the rails at the end of the site and then to neutralize the track in order to reestablish the prescribed rail tension. This complicated working step, which causes additional, extended track blocking times and higher costs, can now be favorably dispensed with, since the tension of the track can be maintained during the sleeper renewal.
Further advantages of the invention are additionally apparent from the description of the drawing.
The invention is described in more detail in the following text on the basis of an exemplary embodiment illustrated in the drawing, in which:
A track construction machine 1 illustrated in
Located at the rear end 9, with regard to the working direction 8, of the machine frame 6 are various working units in the form of a device 10 for picking up old sleepers 4, a ballast plow 11 for processing an exposed track bed 12, and a device 13 for laying new sleepers 14. Conveyor belts 15 are provided for sleeper transport from and to sleeper wagons (not illustrated) by means of a gantry crane 16. Rail guiding clamps 17 serve to lift the rails 3 from the old sleepers 4 and spread them or space them apart from one another in a track transverse direction 19 extending normally to a track longitudinal direction 18 (see
Provided in each of the regions—with regard to the working direction 8—immediately in front of and behind the rail bogie 7 arranged at the rear end 9 of the machine frame 6 is a pair of skids 20 which—as can be seen in
Following removal of the rail fasteners, the two rails 2 are now spread apart in the track transverse direction 19 by means of the track guiding clamps 17, without being severed and thus with the rail tension being maintained. This takes place in a track section 23 which comprises both the region of the skids 20 in front of and behind the rail bogie 7 and the intermediate support 21, such that both pairs of skids 20 can be laid at the same time on the sleepers 4 freed of the rails 3 (
Subsequently, the intermediate support 21 is taken out of operation again by vertical adjustment, such that the machine frame 6 of the track construction machine 1 now rests on the old sleepers 4 via the skids 20 and can be slid forward along said sleepers 4 in the working direction 8 in the context of working forward travel, while the removal of the old sleepers 4 and the installation of new sleepers 14 is carried out by way of the devices 10 and 13 as far as the end of the site. The disengagement operation of the track renewal train 2 at this point finally takes place in an analogously opposite manner to the engagement operation.
Number | Date | Country | Kind |
---|---|---|---|
CH01595/15 | Nov 2015 | CH | national |
Filing Document | Filing Date | Country | Kind |
---|---|---|---|
PCT/EP2016/076598 | 11/3/2016 | WO | 00 |
Publishing Document | Publishing Date | Country | Kind |
---|---|---|---|
WO2017/076994 | 5/11/2017 | WO | A |
Number | Name | Date | Kind |
---|---|---|---|
4542697 | Cicin-Sain | Sep 1985 | A |
4784063 | Theurer | Nov 1988 | A |
4867068 | Valditerra | Sep 1989 | A |
5337675 | Aubermann | Aug 1994 | A |
5361704 | Bounds | Nov 1994 | A |
5609106 | Aubermann | Mar 1997 | A |
20100132582 | Theurer | Jun 2010 | A1 |
Number | Date | Country |
---|---|---|
683011 | Dec 1993 | CH |
0089076 | Jul 1987 | EP |
0670932 | Aug 1997 | EP |
1027113 | May 1953 | FR |
2546925 | Dec 1984 | FR |
Number | Date | Country | |
---|---|---|---|
20180320324 A1 | Nov 2018 | US |