Claims
- 1. A method of allocating predictable costs for consumable items of a laser system, comprising the steps of:
determining a predicted lifetime of one or more components of a laser system in terms of a countable parameter; estimating costs for the repair and/or replacement of the components in advance of their predicted failure; and scheduling the costs to be paid at one or more predetermined times.
- 2. The method of claim 1, wherein the countable parameter is selected from the group of parameters consisting of time, pulse count, accumulated input energy to a discharge of the laser system and number of processed workpieces.
- 3. The method of claim 1, further comprising the step of ordering in advance one or more replacement components for the one or more components predicted to fail.
- 4. The method of claim 1, wherein the one or more components includes at least one component from the group consisting of a laser tube, tube windows, a line-narrowing optical component, a line-narrowing module, a monitor optics module, a halogen filter, a pulser module and containers of a laser gas.
- 5. The method of claim 1, wherein the one or more components includes a line-narrowing module.
- 6. The method of claim 1, wherein the costs are estimated to be an amount of the countable parameter multiplied by a cost per unit of the countable parameter.
- 7. The method of claim 6, wherein the countable parameter is selected from the group of parameters consisting of time, pulse count, accumulated energy input to a discharge of the laser system and number of processed workpieces.
PRIORITY
[0001] This application claims priority under 35 USC §119 to provisional application No. 60/191,487 entitled “Method for Allocating Predictable Costs for Consumable Items of a Laser System” filed on Mar. 23, 2000.
Provisional Applications (1)
|
Number |
Date |
Country |
|
60191487 |
Mar 2000 |
US |