Abstract
A system and method which detects and responds to abnormalities in a distribution system by reconfiguring nodes of the system to minimize the effects of the abnormality without the requirement of communicating with a central controller. The nodes in the system coordinate a response to a system abnormality through a process of self-organization in which each node acts based on its own programming, sensors, and stored data. Each node keeps other nodes apprised of its actions so that they may in turn decide what actions are appropriate for them to take.
Description




BACKGROUND OF THE INVENTION




1. Field of the Invention




The present invention generally relates to improvements in control of a distribution system, and more specifically to the use of intelligent autonomous nodes to monitor and control the distribution of material or energy.




2. Description of Related Art




In general, a distribution system comprises one or more sources connected through a distribution network to one or more delivery points. As the commodity (material or energy) is transported through the network, abnormalities (e.g., faults) may develop that can lead to a disruption of the normal flow of the commodity or a loss of the commodity from the system. In order to help minimize the effects of these abnormalities, a distribution system will typically have nodes at various locations throughout the network which operate to monitor or control the flow of the commodity through the system.




It is desirable to not only minimize the loss of the commodity when an abnormality occurs, but also to minimize the number of users who experience an interruption of the delivery of the commodity due to any abnormality. In order to reduce the loss of the commodity, the nodes in a system may have the capability to respond individually to system abnormalities without coordinating with other nodes. In such a system, nodes can prevent the commodity from flowing through the part of the distribution system where the abnormality exists. However, this system may interrupt service to more users than is absolutely necessary.




Each node may also communicate with a central control location which gathers information from each node and coordinates a system-wide response. In such centrally controlled systems, the central controller typically maintains a detailed map of the system topology, and this map must be updated whenever the system is reconfigured or new nodes are added. This can make such centrally controlled systems difficult and costly to implement and maintain. Additionally, for small systems with few nodes, the need to include a central controller can significantly add to the cost of the system.




Furthermore, once an abnormality is rectified, the nodes typically must be transitioned to a normal state or to a specified state. Once the abnormality is corrected, it is generally desired to place the nodes in the original configuration or a specified configuration, at present this is typically done manually.




What is needed is a distribution system in which nodes can be easily added, subtracted, or reconfigured and which can control the nodes of a distribution system in order to configure them to minimize the loss of the commodity and maximize the number of users served in the presence of an abnormality. Additionally, what is needed is a control system that can restore nodes into their normal operating state or any other specified state after the abnormality has been rectified.




Also what is needed is a distribution system in which the nodes can act independently and without a central controller. Preferably the nodes would locally store information about the system required to enable a node to react to system abnormalities and the information would be coded to ensure its reliability.




Furthermore, what is needed is a distribution system in which nodes that malfunction can remove themselves from coordinated system activities. Preferably when the malfunction in a node is rectified the node should be able to resume normal operation as part of the system.




Additionally, what is needed is a system that requires only one Messaging step in order to begin restoring service to users.




SUMMARY OF THE INVENTION




In one aspect of the invention, the system in accordance with the present invention detects and responds to abnormalities in a distribution system by reconfiguring the nodes of the system to minimize the effects of the abnormality without the requirement of communicating with a central controller. In the present invention, the nodes in the system coordinate a response to a system abnormality through a process of self-organization in which each node acts based on its own programming, sensors, and stored data. Each node keeps other nodes apprised of its actions so that they may in turn decide what actions are appropriate for them to take.




In another aspect of the invention, each node maintains a database of information on each of the other nodes. This database contains state information about other nodes in the system. This allows each node to ascertain, based solely on the information in the database, what actions are appropriate for it to take. The information contained in the record for each node in the database can be tailored depending on the type of distribution system to be controlled, the priorities of the system operators, and any other parameters deemed to be appropriate. In a preferred embodiment of the invention the distribution system that can be controlled is a single loop distribution system with two sources as shown in FIG.


1


. It would not deviate from the present invention to have either more simple or more complex node topologies represented in the database.




In yet another aspect of the present invention, the data exchanged between nodes is coded to ensure reliability and accuracy of the data exchanged between nodes. In a preferred embodiment of the present invention, the exchanged data is time and sequence encoded to allow each node to ascertain, on its own, the reliability of the data.




Another feature of the present invention is that if nodes are physically moved to different points in the distribution system, the present invention only requires that the database of node records be reordered to reflect the current physical ordering of the nodes in the system.




Yet another aspect of the present invention is that it is easily scalable. A system can be initially configured with any number of nodes. At a later time nodes can be physically added or subtracted from the system. Removed nodes are simply deleted from the database while added nodes are added into the database. The process used by each node to determine its actions need not be altered when nodes are added or subtracted from a system.




Another aspect of the present invention is that it will also put the nodes in any desired state once the abnormality in the distribution system has been cleared. In one particular incarnation of the present invention, the controller can be configured to return the nodes of the distribution system to the state they were in prior to the occurrence of the abnormality.




Still another aspect of the present invention is that a set of nodes in one distribution system (a “team” of nodes) can be linked with a team of nodes from another distribution system in order to coordinate the response of the two teams of nodes.




Yet another feature of the present invention is that a team of nodes can be configured to operate even if one or more nodes in the team malfunctions. Malfunctioning nodes can be configured to remove themselves from coordinated system activities and to resume coordinated activities once the malfunction has been corrected.




Still another feature of the present invention is that the nodes can be configured such that only one message must be sent in order to restore service to users after an abnormality. In a centrally controlled system, often a node affected by the abnormality must signal the central controller that an abnormality has occurred. The central controller receives this message and then must decide what the appropriate response is. The central controller then signals the appropriate node to begin restoring service to users. In one incarnation of the present invention, nodes can be configured such that a node affected by the abnormality directly signals the appropriate node that an abnormality has occurred, and the signaled node can then immediately begin restoring service to users.




These and other purposes and advantages of the present invention will become more apparent to those skilled in the art from the following detailed description in conjunction with the appended drawings.











BRIEF DESCRIPTION OF THE DRAWINGS





FIG. 1

shows a conventional distribution system in which nodes in accordance with a presently preferred embodiment of the invention have been installed.





FIG. 2

is a block diagram of a node of a preferred embodiment of the present invention.





FIG. 3

is a flow chart showing the synchronization and error checking routine employed by the embodiment of FIG.


2


. This routine is called by various other portions of the system flow diagram and updates the clock and counters used to synchronize the system.





FIG. 4

is a flow chart showing the synchronization process state of employed by the embodiment of FIG.


2


. This routine coordinates the transmission of the database among the nodes.





FIG. 5

is a flow chart showing the integrity check state employed by the embodiment of FIG.


2


. This routine checks the database, error flags, and system state to ensure that the node is operating correctly and the data is reliable.





FIG. 6

is a flow chart showing the transfer process state employed by the embodiment of FIG.


2


. This routine closes open switches after a fault occurs in order to restore service to as many users as possible.





FIG. 7

is a flow chart showing the return to normal process state employed by the embodiment of FIG.


2


. This routine returns the nodes to their normal state once a fault has been cleared.





FIG. 8

is a flow chart showing the end process timer task employed by the embodiment of FIG.


2


. This routine is called by either the transfer process state flow chart or the return to normal flow chart and sets a timer to ensure that the performance of these tasks does not exceed a predetermined time duration.











DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENT




The present invention comprises a novel method and system for controlling a distribution system. The following description is presented to enable any person skilled in the art to make and use the invention, and is provided in the context of particular applications and their requirements. Various modifications to the preferred embodiment will be readily apparent to those skilled in the art, and the generic principles defined herein may be applied to other embodiments and applications without departing from the spirit and scope of the invention. Thus, the present invention is not intended to be limited to the embodiment shown, but is to be accorded the widest possible scope consistent with the principles and features disclosed herein.





FIG. 1

shows a simplified view of a portion of an exemplary electrical power distribution system that can be controlled by a preferred embodiment of the present invention. Distribution system


100


comprises a plurality of sources of electrical power


102


connected to a plurality of users


104


(e.g., factories, homes. etc.) through an electrical distribution channel


106


such as conventional electrical power lines. Distribution channel


106


has a plurality of nodes


108


placed at predetermined points along the channel


106


. The depiction of the number of sources, users, channels and nodes in

FIG. 1

is arbitrary and there may be a different configuration or number of each of these components in any given distribution system.





FIG. 2

depicts a presently preferred embodiment of a node


200


in accordance with the invention. Distribution channel


202


passes through switch


204


which can open and close the distribution channel at this point. In another embodiment of the invention, the switch could be replaced by a generalized flow controller which has the capabilities to not only open and close the distribution channel but to affect the flow of commodity in other useful and desirable ways depending on the commodity being distributed.




Distribution switch


204


is controlled by node controller


206


. Node controller


206


includes a control computer


208


, a display


209


, and an associated memory


210


. Memory


210


stores the programing to control the node and stores the database of node records about each node in the system. Each record includes a number of fields which include information that allows the node controller to control the node's switch to alter the distribution line characteristics in response to distribution system demands.




In a preferred embodiment of the invention the ordering of the node records in the database corresponds to the physical ordering of the nodes in the distribution system. It would not deviate from the present invention to have the node records in the database ordered in some other fashion and to include information in each node record of the node's actual or relative physical position in the distribution system.




Also, a preferred embodiment of the invention is for controlling a loop distribution system as in

FIG. 1

in which there are two sources and a normally open switch (a “tie” switch) in the distribution line between the two sources, or a radial distribution system in which there is one source and no tie switch. It would not deviate from the present invention for the database represent more simple or more complex distribution system topologies and for the invention to be able to work on such a topology.




In a the presently preferred embodiment of the invention each node's database record includes: (1) record currently in use flag, (2) the node's communication address, (3) its normal switch state (open or closed), (4) present switch state, (5) the voltage state (is voltage present on the line or not), (6) the fault state (has a fault been detected), (7) the present time stamp (8) the database sequence number, (9) the logic process state (what state and step is the switch in), (10) error condition status flags, (11) automatic/manual operation mode status, (12) average sensed 3-phase load, (13) time stamp at start of event process. It will be appreciated that in other implementations of the invention different node data may be stored in the database record for each node without departing from the scope of the invention.




This database allows each node to have enough information about the state of the distribution system to intelligently control its local switch. Additionally, since the database is locally stored in the node, the node need not ask other nodes for information or wait to receive operating instructions from other nodes.




It will be appreciated that consistent with the present invention the record currently in use flag can be used to remove a node from coordinated system activities or allow a node to resume coordinated system activities.




Control computer


208


is connected to AC waveform processor


212


. AC waveform processor


212


is connected through field interface connector


214


to distribution line


202


. This allows the processor to measure various critical parameters of the electricity on the distribution line such as, voltage and current, digitally convert them, and send them to the control computer for processing, communications, or storage in memory.




Digital I/O interface


216


is connected to control computer


208


, switch


204


and distribution channel


202


. Digital I/O interface


216


allows computer controller


206


to receive switch position sensing information and other inputs, and to output control outputs to the switch.




Communications device


218


is connected to control computer


208


and allows it to communicate with other nodes on the system through communications channel


110


of FIG.


1


. The communications devices can be connected to any communications network that is conveniently available and has the desired characteristics. In a current embodiment of the invention, a Metricom Radio is used.




A second, optional, communications device


220


can be included in the node, if desired, for use by systems other than the present invention. An example of this would be a SCADA gateway.




Power is supplied to the node through power supply/battery backup


222


. The battery can be charged from solar power, an AC potential transformer, or from power supplied through the voltage sensors.




Each of the nodes is connected to a communications channel


110


. Any type of communications channel can be used. In the present invention, for example, the communications channel could be telephone, radio, the Internet, or fiber optic cable.





FIG. 3

is a flow diagram which illustrates the operation of a synchronization counter and state selection process run by each node in accordance with the presently preferred embodiment. In this process the nodes update their timer and database sequence counter which are used to synchronize the nodes with each other. The nodes then check for error conditions and set error flags if errors are found and determine from their database which state they are in: synchronization, integrity check, or reconfiguration event.





FIG. 4

is a flow diagram which illustrates the operation of the synchronization process state run by each node in accordance with the presently preferred embodiment. In this state the nodes construct a database of critical control information about the distribution system. All nodes contribute to the construction of a database. Each node stores in its memory a copy of the database. The steps in constructing the database in accordance with the presently preferred embodiment are as follows: Each node receives the database from the previous node, adds its own record of information and passes the database on to the next node. This process continues until all nodes have received a record from every other node. Once this process is compete, each node then proceeds to the integrity check state shown in

FIG. 5







FIG. 5

is a flow diagram which illustrates the operation of the integrity check state process run by each node in accordance with the presently preferred embodiment. When a node runs this process, it checks the records it has received from all the other nodes to ensure that the records reflect a timely version of the state of the system.





FIGS. 6

is a flow diagram which illustrates the operation of the transfer process state in accordance with the presently preferred embodiment. This flow diagram describes the process used by each node upon the occupance of a fault in the system followed by standalone sectionalization. This process is also started in a node when the node receives a message that another node has entered this process. In order to restore electric power service to as many users as possible after a fault has occurred, each node will use this process to determine if it can close its associated switch.





FIG. 7

describes the logic used by each node to return the distribution system to its normal state once the fault has been cleared.





FIG. 8

is a flow diagram which illustrates the operation of a task timer that is used during the transfer process state of FIG.


6


and the return to normal process state of

FIG. 7

in order ensure that the system does not take too much time to complete the steps required in either of these processes.




Free Running Counter




Steps


310


to


318


of

FIG. 3

comprise a synchronization routine that is often called by steps in other processes run by a node, especially when a node is waiting for a specified event to occur. In step


310


the node's free running tenth counter is incremented. A free running counter is used to establish a reference for time stamped logic. As will be seen shortly, these counters are used to ensure synchronization among the nodes. In step


312


the node checks the free running counter to determine if it has reached its maximum. When the maximum count is reached, the synchronization interval expires. If the synchronization interval has expired then step


314


is executed and the sequence number for the database recorded by the node is incremented and a time stamp is recorded in the node's database to help ensure synchronization. The database sequence number is increased by one count on each synchronization interval and each node includes the database sequence number in its local record.




The database sequence number at each node should be the same if all of the nodes are properly functioning and synchronized. Therefore, the inclusion of each node's database sequencing number in its record allows nodes in the present invention to be certain that the data being received from other nodes is timely and reliable. In this way each node can ascertain for itself whether the system as a whole is functioning properly.




After step


314


, or if the synchronization interval has not expired then the node checks to determine if communications are allowed. Communications will be prevented in certain situations. An example of when communications are not allowed in a preferred embodiment is when a team of nodes is initially being configured, all other nodes must be silent except for the node distributing the configuration information. If communication is not allowed for the node, then the node returns to step


310


and is in effect on its own for the moment.




If communication is allowed then step


320


is executed. The node will check for errors and events and set a flag if an error or event is detected. Then each node determines which of three states it is in: synchronizing, integrity check, or reconfiguration event. Each node determines on its own, independently or the other nodes, which of the three states it should be in based on its own internal sensors and the database records that it has received from the other nodes. Typically, all nodes will be in the same state unless the system is transitioning from one state to another. However, any particular node can only be in one state at a time.




Synchronization Process State




If the node is in the synchronization process state then it follows the process illustrated by the flow chart in FIG.


4


. At step


412


, the node must determine if it is the first active node. In a preferred embodiment of the invention the node just after either source can be configured to be the first active node in the data base and the other node would be the last active node in the data base. The nodes in between would be ordered in the database to reflect their physical ordering in the distribution system. It would not deviate from the present invention to have the nodes ordered in the database in an order other than their physical order and to include data in each node's record that allows the node's absolute or relative physical ordering to be determined.




The first node will proceed to step


414


and will start the process of constructing the database of records for the nodes. The first node will put its local record in the database and then send the database to the next node listed in the database. This database is called the “ball” as it is sent around the system from node to node. The record added to the database by each node contains the 13 items of information listed above for the currently passing node.




Although there are many possible ways that this database could be constructed and communicated, the present incarnation of the invention constructs the database by sending it to each successive node to have that node's record added onto the database. The database could be constructed in other ways without deviating from the present invention. For example, each node could simply broadcast its record on the communications channel for reception by all other nodes.




The first node will then continue on to step


418


, and since the node has not yet received the ball twice, it will continue on to step


420


. In step


420


, the node determines if it is time to exercise its link. A node exercises its link by signaling another node to signal it back. This allows a node to determine if its communications system is working. To determine if it is time to exercise its link, a node checks the synchronization interval timer to determine if the synchronization process has taken more than a predetermined used defined period of time. This prevents the node from getting stuck in this state if there is a communications failure.




If it is not time to exercise the link, the node next goes to step


422


. In this step the node executes steps


310


to


318


of FIG.


3


and checks for errors and events. If an error or event is detected, a flag is set and, if necessary, the process that is active is ended. This is called a “synchronization and error checking loop.” Once this is completed, the node returns to the synchronization process and proceeds to step


424


and checks to determine if it has received the ball. When the synchronization process is run by nodes other than the first node they go from step


412


directly to step


424


.




At step


424


, if the node has not received the ball, it will return to step


420


and continue this cycle until it is either time to exercise the link or the ball has been received. If the ball is received then the node goes from step


424


to step


426


. At step


426


the node includes its local record with the ball and sends the ball on to the next device. (The last listed node will send the ball to the first listed node.) The node proceeds to step


418


and checks whether it has receive the ball twice. If not, then the node proceeds to step


420


again and continues in that loop.




When the ball is receive the second time, the node goes from step


424


to


426


to


418


and then to step


428


and schedules a link exercise message to another node in order to test the communications link to ensure that it is working. This is the same step the node jumps to if the time to exercise the link counter in step


420


expires.




After the node has exercised its communications link in step


428


, the node goes to step


430


and checks the integrity check counter to determine if it is time to enter the integrity check state as illustrated by the flow chart in FIG.


5


. If it is not yet time for the node to enter the integrity check state, then the node will proceed to step


432


where it performs a synchronization and error checking loop. The node then cycles back to step


430


and will continue this loop until it is time for an integrity check.




In a preferred embodiment of the invention, the synchronization process occurs once per predetermined interval. The length of the predetermined interval is based on the number of nodes in the system. This interval could be larger or smaller without deviating from the present invention.




Thus, the synchronization process illustrated by the flow diagram in

FIG. 4

periodically updates the information in each node's database. This process allows each node to contain up to date information on the status of all the other nodes.




Integrity Check State





FIG. 5

shows the flow chart which illustrates a process employed for the integrity check state. In this state each node checks to ensure that the database records contained in its memory appear to be synchronized, that there are no error conditions, and that the nodes are in the correct states. In step


512


the node checks the database sequence numbers to ensure that they all match. In this way the node can ensure that the records in the database from each node are all from the same synchronization process.




If the sequence numbers do not match, then the node goes to step


514


and a flag is set for the sequence numbers to be reset to re-synchronize them. This error flag will prevent any coordinated team activities from taking place until another synchronizing interval has taken place and the database sequence numbers match.




If the sequence numbers match, or after the flag has been set in step


514


, the node then continues on to step


516


. In this step the node checks each of the database records to ensure that they were all time stamped within one second of each other. This requirement ensures that the records in the database accurately reflects a picture of the system at roughly one point in time. If the records are not time stamped within one second of each other, then the node goes to step


518


and sets a flag for a new time stamp. This flag will not allow synchronized team activities if the time stamps are out of synchronization with each other by more than a predetermined amount set by the user. In one embodiment, if the time stamps are 5 seconds out of synchronization then an error flag is set. It will be appreciated that the allowable discrepancy of the time stamps is an implementation dependent parameter.




If the time stamps are not flagged as being out of synchronization, or after the flag has been set in step


518


, the node then proceeds to step


520


. In this step, the node checks for stop transfer errors, and if any exist, it tries to determine if the error can be cleared. Examples of errors are: (1) an out of synchronization error in which the database sequence numbers for the nodes do not match, and (2) a reconfiguration process occurred and was unable to be fully completed due to external conditions such as a malfunctioning switch.




If the error can be cleared then a flag is set in step


522


for the error to be cleared. The node then continues on to step


524


. In this step the node determines if it is all ready for transfers. After a reconfiguration event, the node must make sure that all of the nodes are synchronized and that other necessary conditions are met. For example, in one embodiment, the node checks its database to determine if all of the nodes have an average 3 phase load that is within a predetermined user defined limit. If the node determines that it is all ready for transfer, then it will go to step


526


and set a flag indicating that it is all ready for transfer.




Next the node goes to step


528


to determine if it is in the correct ready state. Each node can be either ready for a transfer process or ready for a return to normal process, and all nodes should be in the same ready state. In this step, the node will compare which ready state it thinks it should be in based on its local information and the state that other nodes are in based upon information in the database. If the node is not in the correct ready state then it goes to step


530


and determines the correct ready state and changes to it.




The node then proceeds to step


532


where it checks to determine if there is a return to normal mode mismatch. In this step the node checks to make sure that all of the nodes are set to the same return to normal mode: open transition, closed transition, or function disabled. If all the nodes are not set to the same return to normal mode then there is a mismatch and at step


534


an error flag is set. Next, the node returns to step


310


in FIG.


3


.




Transfer Process State




The transfer process state flow diagram of

FIG. 6

will be described with the aid of a simple example. Referring to

FIG. 1

, assume a fault develops in distribution channel


106


between nodes


108


A and


108


B. Typical electrical distribution systems will have a device at the source of supply for safety and for protection of the circuit. This device is typically either a breaker or a recloser (reclosing breaker). This device will sense an over current condition (fault) and open or “trip.” Reclosing devices may close again after a time delay (thus the term “recloser”), allowing transient fault conditions to clear without creating an extended service outage. If the fault has still not cleared the device may repeat the protective open operation. In either case (breaker or recloser), if the problem cannot be cleared, the device will become “locked” in an open (tripped) state (lockout).




To further isolate the faulted section of line, it is possible to place automatic devices called “sectionalizers” at switch locations


108


A-F as shown in the FIG.


1


. The sectionalizer is a switching device that senses current (and optionally voltage) such that the operation of the circuit and the source-side protective device can be monitored. The sectionalizer is configured to open its switch under certain circumstances when the circuit is de-energized after some number of pre-configured voltage losses have occurred within a brief time interval. The circumstances vary from product to product, but are always based upon sensing of conditions caused by faults followed shortly by voltage losses. Sectionalizers are designed to coordinate with the operation of the circuit's protective devices. Typical sectionalizers are devices such as the Cooper Power Systems Sectionalizer type GV or GW manufactured by Cooper Industries, Inc, or the EnergyLine Systems Model 2801-SC Switch Control manufactured by EnergyLine Systems. These are all well-known devices within the industry which form no part of the present invention and which need not be described in detail herein.




The “sectionalizer” described here is based on the EnergyLine Model 2801, with additional features added to support operation under a preferred embodiment of the invention. The standard sectionalizer logic will open (trip) the switch if: 1) its sectionalizing logic is enabled and the device is operational, 2) a pre-configured number of voltage losses (typically 1-3) on all sensed phases have been counted within a brief time period (typically 45 seconds), 3) an overcurrent condition was sensed just prior to the first voltage loss, and 4) the switch is presently closed. An additional option in the conventional software allows the switch to trip if voltage, sensed on all three phases, becomes grossly unbalanced, and remains unbalanced continuously for a configured time period (typically 30 seconds).




An optional feature that can be provided in a preferred embodiment of the invention causes the switch to open on a configured count of voltage losses even if a fault was not sensed just prior to the loss of voltage. This allows the first step of isolating both sides of the faulted section of line to be executed immediately without communication to other devices. Another optional feature causes the configured count on voltage losses (subsequent to sensed faults) to be dynamically calculated locally based upon the position of the switch relative to the presently designated open tie switch. Configuration parameters allow this dynamically calculated range of counts to be further constrained by the user to always fall between a minimum and maximum number. Another option allows the switch to open after a single extended voltage loss. Finally, the counting of faults followed by voltage losses can be configured to count each event as a fault either: 1) if the first voltage loss was preceded by a fault, or 2) if all voltage losses were preceded by faults.




Another unique feature of a preferred embodiment of the invention is its modified one-shot-to-lockout capability. If a switch is closed as part of any automatic operation (or manually closed by a human operator), some sectionalizers, including the EnergyLine Model 2801-SC, can be configured to automatically re-open the switch if a voltage loss is detected during a brief interval following the operation (typically 5 seconds). A preferred embodiment of the invention has the additional capability to avoid opening the switch until two counts of voltage loss have been detected. This becomes a benefit when the circuit's breaker reclose pattern includes an initial instantaneous close operation following a trip operation due to a fault.




Referring to

FIG. 1

, if power distribution system


100


contains a sectionalizer, then after the fault occurred between nodes


108


A and


108


B on distribution channel


106


, a typical sectionalizer, depending on how it is configured, would cause switches in any one or all of nodes


108


A,


108


B and


108


C to open causing all users


104


A,


104


B, and


104


C that are down stream from an open switch to lose service.




In one implementation of the invention, the sectionalizing logic will be set up to open all switches between the fault and the normally open tie switch


108


G. This allows the present embodiment of the invention to reclose switches one at a time to gradually increase the load seen by the distribution system to aid the system in resuming service to users. Once any node has finished sectionalization the node enters the transfer process state illustrated in flow diagram of

FIG. 6

in which a node will attempt to close its switch. Also a node will enter the transfer process when it receives a communication that another node or team of nodes has entered the transfer process.




Without departing from the present invention, the transfer process state could be initiated by an event other than finishing sectionalization. Depending on the type of distribution system and its needs and characteristics, it may be desirable to have other events trigger the system into action. For example, it may be desirable to have the system triggered into action by detection of a serious under or over voltage condition.




Each node is continually updating the record in its database concerning its own status information. Thus, while the records in the database concerning all other nodes, the ball, is sent to each node only in the synchronization process state, each node maintains an updated record on its own status.




For the purposes of this example, assume that sectionalization has caused the switches in nodes


108


A,


108


B, and


108


C to open resulting in users


104


A,


104


B, and


104


C all losing service. Once sectionalization has ended, each of the three nodes


108


A,


108


B, and


108


C will independently begin the transfer process state because they each have undergone standalone sectionalization.




When a node enters the transfer process state depicted in the flow chart of

FIG. 6

, the node executes step


612


and starts the end process timer task. This timer ensures that the nodes do not spend too long trying to complete the task. Should something prevent the node from completing the task in the allotted time, the timer will end the transfer process state. Each node will use the same start time for its timer as the node that first initiated the transfer process. In this way all nodes in the transfer process will “time out” at the same time. The operation of this timer and the task it calls are shown in FIG.


8


and will be discussed below.




The length of the timer can be set by the system operator to meet the needs of the particular system being controlled. For example, to ensure the safety of repairmen working on the power lines after a fault has occurred, the timer could be set to remove the nodes from the transfer process a known period of time after the fault occurred. In this way, even if the conditions in the transfer process state are met which would have allowed a switch to close and energize a power line, repairmen who have begun to service the system are not put in danger because the transfer process has timed out and the switch will not close.




In a preferred embodiment of the present invention, each of these three nodes enters the transfer process on its own, triggered by its own logic, stored data and sensor readings. The presently preferred embodiment of the invention does not require central control, communication, or approval for any of the nodes to enter this state.




Once the timer has been started, the node proceeds to step


616


and determines if the switch it is controlling is closed during the normal operation of the distribution network. Referring to

FIG. 1

, switches


108


A,


108


B,


108


C,


108


D,


108


E, and


108


F are closed during normal operation of distribution system, and switch


108


G, a tie switch, is open during the normal operation of the system. Since switches


108


A,


108


B, and


108


C are each normally closed during the operation of the system, these nodes will continue on to step


618


. At step


618


each of the nodes that has entered the transfer process state will transmit its updated record to the next active node listed in the database and the previous active node listed in the database. These two nodes are called the “nearest neighbor” nodes. Node


108


A will transmit to node


108


B, node


108


B will transmit to nodes


108


A and


108


C, and node


108


C will transmit to nodes


108


B and


108


G. In this way each switch that has entered the transfer process state will inform its nearest neighbors of its progress. It will be appreciated that, although the presently preferred embodiment employs communication between “nearest” neighbors, alternative embodiments may employ different node-to-node communication patterns consistent with the invention. Thus, in accordance with a presently preferred embodiment of the invention, each node can inform other nodes of its state regardless of the physical layout of the distribution system or the physical deployment of the nodes.




When node


108


G receives the communication from node


108


C, node


108


G will start the transfer process state. In general, when one node receives a communication from another node that the other node has entered the transfer process state, the node receiving the communication will itself enter the transfer process state. This procedure allows the system to self organize, eventually putting each node of the system into the transfer process state without requiring any communication from a central office or any interaction with a human.




Furthermore, in the presently preferred embodiment, there need not be any centralized control or logic center to decide what actions are appropriate for each node to undertake at a given point in the process. Each node of the present invention can operate based only on its sensors and the information in the database. Due to this simple operating structure, the present invention can be easily expanded or reconfigured by simply reordering the nodes in the database without the need to change the programing or logic of the present invention. For example, to add a new node between nodes


108


B and


108


C of

FIG. 1

, the system operator would physically insert the new node into the system at the appropriate place and program it into the database between nodes


108


B and


108


C. This is accomplished by moving the records for all of the nodes in the database after node


108


B down one space and inserting the record for the new node in this newly created space in the data base.




Node


108


G executes step


612


, starts the end transfer process timer, sets it to end at the same time as the node(s) that initiated the transfer process, and then goes to step


616


. Since node


108


G controls a switch that is normally open it will go to step


638


. At step


638


node


108


G will observe its sensors, the information in its database, and the information sent to it by node


108


C to determine whether it can close. In a presently preferred embodiment of the invention, the conditions listed in Table 1 are checked by the node in order to determine if it can close. The conditions used at step 4 in Table 1 are shown in Table 2. Other sets of conditions could be used without departing from the invention.












TABLE 1











In order to close the normally open switch associated with a node,






one valid closed switch and one valid open switch must be detected






as the adjacent switches associated with adjacent nodes on either side






of the normally open switch. The following rules define the conditions






that must be met for the normally open switch to validate the state of






adjacent switches.













A normally open switch on the load side of a faulted line section may






close for the purpose of restoring load if:












1.




no error conditions exist






2.




the adjacent fault side switch is open






3.




the adjacent fault side switch did not detect a fault,







but did see a loss of voltage






4.




the current level seen by the adjacent fault side switch before







the outage is within the bounds set in the local switch







(The conditions used in this step are shown in Table 2.)






5.




the adjacent non-faulted side switch indicates it observed a







voltage loss and/or fault but it is now closed, or the adjacent







non-faulted side switch is the normally open switch, or







the adjacent non-faulted side switch is a breaker and voltage







has been restored (this step is bypassed if the local switch







is the normally open switch)






6.




the adjacent switches are in the proper logical operation step






















TABLE 2











(This Table elaborates on step 4 in tables 1 and 3)






In order to determine whether load may be restored during a transfer






process, the process uses the total load to be transferred compared






to the capacity of the alternate circuit. Three basic set points






are used by an engineer to limit transferred load. They are:






 Capacity for Transfer (total feeder load n/a)






 Maximum Capacity for Transfer






 Maximum Rated Feeder Capacity






All three set points have settings for the left feeder and the right.






All three also have summer and non-summer season settings.













The transfer process utilizes, if available, the real time total load






on the associated feeders. This real time total load value may come






over communications from any source such as a substation RTU.













The two set points that work with this process are the “Maximum






Capacity for Transfer” and the “Maximum Rated Feeder Capacity”.






The “Maximum Capacity for Transfer” is the configured amount of load






that may be transferred to an alternate feeder when that feeder is






lightly loaded. The “Maximum Rated Feeder Capacity” is used in






combination with the actual real time load. The difference between these






two is the present real time capacity the alternate feeder can handle. In






order for a transfer to occur, the load that was reported to exist before the






reconfiguration event began by the next open switch must be less than






both the present real time capacity and the “Maximum Capacity for






Transfer”.













The real time load must be sent to the switch controls at least once every






20 minutes. After 20 minutes past the last reception of real time load the






value goes to undefined. An undefined value causes the fall back process






to take affect. This prevents old load data from allowing transfers to occur






when the source of this data fails to report it.













The fall back process uses the “Capacity for Transfer (total feeder load






n/a).” This value is intended to be a conservative value. When configuring






this value the engineer should take into account average loading, peak






loading, and the emergency load capacity on the alternate feeder. The






engineer should feel comfortable that a transfer of this amount of load can






occur at any time and still be accommodated by the alternate feeder.













Note that the process for the two feeders is independent. Real time loading






data may be provided for one feeder while the other feeder uses the






conservative transfer process.














Assume that all of the conditions are met to allow the switch at node


108


G to be able to close. Through the use of the conditions listed in Tables 1 and 2, the node can determine on its own whether or not it can close its associated switch. Additionally, only one message had to be sent to enable node


108


G to act to restore service—the message from


108


C.




If the conditions were not met to allow the switch to be able to close, then node


108


G would go to step


640


and execute the synchronization and error check routine. If an error is detected during this time then at step


642


it is recorded and the transfer is stopped. Otherwise, the node will continue to cycle between steps


638


and


640


until the switch can be closed, an error is detected, or the end transfer process timer expires.




Once node


108


G determines that it can close its associated switch it will proceed to step


626


and attempt to close it. Typically such switches will have safety devices called lockout logic, as detailed above during the discussion of sectionalization, that will force the switch back open and keep it open if an anomaly such as a voltage loss is detected when the switch is closed. At step


628


the switch determines if the closing operation was successful. If it was not then at step


624


an error flag is set and the transfer process is stopped. If the close operation was successful, then power is restored to users


104


C and node


108


G continues to step


630


.




At step


630


node


108


G sends its updated record to its nearest neighbors, nodes


108


C and


108


D. Node


108


D now enters the transfer process state, and as nodes


108


A,


108


B, and


108


C did, node


108


D will proceed down the flow chart to step


618


and send its updated record to nodes


108


G and


108


E. This will cause node


108


E to enter the transfer process state and signal nodes


108


D and


108


F causing


108


F to enter the transfer process state and signal node


108


E with its updated recorded.




As can be seen from the present example, one feature of the invention is that from only the ordering of the nodes in the database and the rules of the flow charts, each node can determine the appropriate actions to take independently of actions taken by other nodes. Nodes do not command other nodes to take any given action, nor is central control or human intervention necessary to coordinate the response of the entire system. The decisions made by each node are based solely on information it has stored in its database and sensors attached to it.




Nodes


108


A,


108


B,


108


C,


108


D,


108


E, and


108


F all will proceed to step


644


. Since the switches at nodes


108


D,


108


E,


108


F are normally closed switches and they were not affected by the fault, they will be sent to step


632


at step


644


and will wait for the process to time out while they perform the synchronization and error checking loop with steps


634


and


636


.




Since the switches at nodes


108


A,


108


B, and


108


C were affected by the event, they each proceed to step


620


. In a presently preferred embodiment of the invention the conditions listed in Table 3 are checked by the node in order to determine if it can reclose. The conditions used at step 4 in Table 3 are shown in Table 2. Other sets of conditions could be used without departing from the invention.




If these switches cannot be reclosed then the nodes will go to step


622


and perform synchronization and error checking. If an error is detected then in step


624


a flag will be set, and the transfer process state will be stopped. If no errors are detected then each node will cycle through steps


620


and


622


until the switch can be reclosed or the process timer expires.












TABLE 3











In order to reclose the normally closed switch associated with a node,






one valid closed switch and one valid open switch must be detected as the






adjacent switches associated with adjacent nodes on either side of the






normally closed switch. The following rules define the conditions that






must be met for the normally closed switch to validate the state of






adjacent switches.













A presently open switch on the load side of a faulted line section






may close for the purpose of restoring load if:












1.




no error conditions exist






2.




the adjacent fault side switch is open






3.




the adjacent fault side switch did not detect a fault, but did see a







loss of voltage






4.




the current level seen by the adjacent fault side switch before the







outage is within the bounds set in the local switch (The conditions







used in this step are shown in Table 2.)






5.




the adjacent non-faulted side switch indicates it observed a voltage







loss and/or fault but it is now closed, or the adjacent non-faulted







side switch is the normally open switch, or the adjacent non-faulted







side switch is a breaker and voltage has been restored (this step is







bypassed if the local switch is the normally open switch)






6.




the adjacent switches are in the proper logical operation step


















A normally closed switch on the source side of a faulted line section






may reclose if:












a.




no error conditions exist






b.




the adjacent fault side switch is open






c.




the adjacent fault side switch detected a fauit






d.




the adjacent non-faulted side switch indicates it saw a voltage loss







and/or fault but it is now closed, or the non-faulted side is the







breaker and voltage has been restored






e.




the adjacent switches are in the proper logical operation step














Through the use of algorithm of Tables 2 and 3, a node can determine on its own whether or not it can close its associated switch. Assume that all of the conditions are met to allow the switch at node


108


C to be able to reclose its switch. The switch will then be reclosed at step


626


.




At step


628


node


108


C will determine if the switch was successfully reclosed. If it was not, then an error flag is set and the transfer process is stopped in step


624


. If the switch was successfully reclosed then the node proceeds to step


630


and informs its nearest neighbors, nodes


108


B and


108


G, of its progress by sending them an updated version of its record. Node


108


C then enters the loop between steps


632


and


634


where it performs the synchronization and error checking routine while it waits for the end transfer process timer to time out. If an error is detected, step


636


is executed and a flag is set and the transfer process is stopped. An example of an error is if the lockout logic causes a switch to reopen.




As the above discussion and rules indicate, one benefit of a preferred embodiment of the present invention is its ability to operate by systematically closing only one switch at a time so that the load to the system is brought on line gradually, one segment at a time. This helps ensure that the power source will not be overloaded due to too rapid an increase in demand.




When node


108


B receives the communication from node


108


C, assume that node


108


B will have enough information to know that according to the conditions listed in Table 3, it should not close since node


108


A detected a fault and node


108


B did not. This must mean that the fault was between nodes


108


A and


108


B. Therefore, node


108


B will cycle between states


620


and


622


until an error is detected or the end transfer process timer expires. Node


108


A, since it has detected a fault, will also not be allowed to close and will cycle though steps


620


and


622


until an error is detected or the process timer times out.




When the end transfer process task timer times out, the nodes will all return to step


310


of FIG.


3


and resume synchronization, error and integrity checks until the original fault is repaired. If the fault is repaired, the system will enter the return to normal process state of

FIG. 7

discussed below. If another fault occurs before the previous one has been corrected, it would not deviate from the present invention for the system to re-enter the transfer process state and again reclose switches to return service to as many users as possible.




Return to Normal Process State




After a fault has occurred or if for any other reason the distribution network switches have been put in states other than their normal operating states, for example after the transfer process has completed, the return to normal process state can return the system to its normal operating configuration. This process can also be used to reconfigure the distribution system to any desired system set up of open and closed switches without deviating from the present invention. In the example used above, once the fault in distribution channel


106


has been repaired or cleared and switch


108


A has been manually reclosed, power will be restored to users


104


A. At this point, node


108


B will sense that normal voltage has been restored to the distribution channel between nodes


108


A and


108


B and it will be triggered to enter the return to normal process state after node


108


B has detected stable 3 phase voltage on the channel for a predetermined time. Once any switch in the system has entered the return to normal state, it will signal all other switches to enter the return to normal state.




At step


712


the node starts the end transfer process task timer. Each node will use the same start time for its end transfer process timer. This timer ensures that the system does not spend too much time attempting to execute the return to normal process. The timer is set to run for a predetermined time set by the system operator. In one embodiment, this timer is set to run for one minute. The node next executes step


716


. Since nodes


108


A-F are normally closed switches, each of these nodes continues on to step


718


.




Switches


108


D-F are normally closed switches that were not open so they will each go to step


730


and perform a synchronization and error checking loop while they wait for the process to end. Switches


108


A and


108


C are normally closed switches that were reclosed by the transfer process so each of these nodes will also go to step


730


and perform a synchronization and error checking loop while they wait for the process to end. Node


108


B is a normally closed switch that is open so it moves on to step


720


to determine if it is an open transition.




An open transition is one in which the source of supply of power to users is interrupted in the process of switching between alternate sources of supply. For instance, in this example, if tie switch


108


G was opened up before switch


108


B was closed then users


104


B and


104


C would lose power momentarily. This would be an open transition. In a closed transition, switch


108


B is closed before switch


108


G is opened and users


104


B and


104


C do not lose power. The system operator can configure the system to operate in either an open or closed transition mode.




Assume the system operator set the system to undergo a closed transition. Then node


108


B go from step


720


to step


722


. If the normally open switch,


108


G, is armed to reopen and the switch on the supply side of switch


108


B, switch


108


A, is closed then node


108


B will continue to on to step


724


and close its switch. The normally open switch is armed to reopen when all of the user defined conditions have been met such that the switch is ready to open.




If the normally open switch is not armed or the supply side switch is not closed, then node


108


B will perform a synchronization and error checking loop and return to step


722


. This loop will continue until either both conditions are met or the end transfer process timer expires.




If the switch is closed at step


724


, then at step


726


the node checks to see if the switch is closed. The switch could have been reopened by lockout logic or any other safety feature on the switch that might force it back open. If the switch is closed then at step


728


the node will inform its nearest neighbors and the normally open switch,


108


G, by sending them an updated version of its record. The node then goes to step


730


where it performs the synchronization and error checking loop while waiting for the end transfer process timer to time out. If the switch is not closed at step


726


, then at step


732


an error flag is set and at step


734


the node informs all other nodes that an error has occurred and the node then goes on to step


730


.




If the system is set to undergo an open transition, then at step


720


, the node will go to step


746


. If the normally open switch is open and the supply side switch, switch


108


A, is closed then the node will continue on to step


724


. If either of these conditions is not met, then the node will perform a synchronization and error checking loop between steps


744


and


746


.




Switch


108


G is a normally open switch so at step


716


it will proceed to step


736


. If the system is undergoing a closed transition, the nodes goes to step


738


if all the other switches are closed, node


108


G will open the normally open switch at step


740


. The node will then check if the switch is actually open at step


742


. If the switch is open it will send its updated record to all the nodes at step


734


and then enter the loop at step


730


and wait for the process timer to end. If the switch is not open at step


742


then an error flag will be recorded at step


732


and the node will proceed to step


734


.




At step


738


if all the other switches were not closed then the node will loop to step


744


and perform synchronization and error checking and look back to step


738


. This loop continues until all the switches are closed, an error is recorded or the timer expires.




If the system were programed to undergo an open transition, then at step


736


node


108


G would not look to see if other switches were closed and it would skip to step


740


, open the switch and continue the flow chart from that step.




End Process Timer Task




Whenever a node enters either the transfer process or the return to normal process, the node starts the end process timer task. The flow diagram for this task is show in FIG.


8


. At step


812


the node loops until the timer expires. The timer is initiated when the node enters the task and from the information sent to the node by other nodes, each node will know the time at which the first node to enter the task in question began the task. In this way all of the nodes can set their end process timers to expire at the same time. It would not deviate from the invention to have the end process task timer be of different durations for the transfer process and the return to normal process.




Once the timer expires, the node will stop the process it is in and look to see if the switch is in the proper position for the end of the process that was stopped. For example, is the switch in its normal position at the end of the return to normal state. If the switch is not in the correct position, then step


818


is executed and an error flag is set and the node returns to the synchronization process at step


820


.




If the node's switch is in the correct position then at step


816


the node goes to step


822


and checks to see if the circuit is in the normal configuration. If it is then the node goes to step


820


. If it is not in the normal configuration, then the node goes to step


824


and checks if the return to normal is enabled. If the system does not have the return to normal enabled it will go to step


826


and change its operation state to no operation and wait for further instructions before it can re-enter the ready to transfer state. From step


826


, the system will go to


820


.




If the return to normal is enabled then at step


828


the node changes its operation state to ready for return to normal and then proceeds on to step


820


.



Claims
  • 1. A system for automated reconfiguration of a distribution system, comprising:a plurality of switches, switches in the plurality of switches being located in the distribution system; a plurality of switch controllers; switch controllers in the plurality of switch controllers controlling respective switches in the plurality of switches and including resources which monitor the distribution system, which communicate information with at least one other switch controller in the plurality of switch controllers to transmit and receive communicated information including an address, normal switch state, present switch state, and fault detection state of the respective switch controller and respective switch; and which process the communicated information and monitor the distribution system in order to determine whether to operate their respective switches.
  • 2. The system for automated reconfiguration of the distribution system of claim 1, wherein:the resource which operates the switch in the plurality of switches controlled by the switch controller in the plurality of switch controllers in response to detection of a condition requiring reconfiguration opens the switch in the plurality of switches when the switch controller in the plurality of switch controllers detects a predetermined number of operations of a distribution system protective device.
  • 3. The system for automated reconfiguration of the distribution system of claim 1 wherein the switch controllers open their respective switches to perform fault isolation and close their respective switches to perform reconfiguration.
  • 4. The system for automated reconfiguration of the distribution system of claim 1 wherein processing of the communicated information results in switch controllers in the plurality of the switch controllers closing their respective switches one at a time.
  • 5. The system for automated reconfiguration of the distribution system of claim 4 wherein the switch controllers determine whether to close their respective switches based on information including if the switch is connected through the distribution system to a closed switch.
  • 6. The system for automated reconfiguration of the distribution system of claim 1 wherein a first switch controller in the plurality of switch controllers transmits the communicated information to a second switch controller in the plurality of switch controllers.
  • 7. The system for automated reconfiguration of the distribution system of claim 6 wherein the second switch controller in the plurality of switch controllers receives the communicated information from the first switch controller in the plurality of switch controllers and transmits the communicated information to the first switch controller in the plurality of switch controllers.
  • 8. The system for automated reconfiguration of the distribution system of claim 6 wherein the second switch controller in the plurality of switch controllers receives the communicated information from the first switch controller in the plurality of switch controllers and transmits the communicated information to a next switch controller in the plurality of switch controllers.
  • 9. The system for automated reconfiguration of the distribution system of claim 8 wherein the next switch controller is a last switch controller in the plurality of switch controllers, and the last switch controller receives the communicated information from the second switch controller in the plurality of switch controllers and transmits the communicated information to the first switch controller in the plurality of switch controllers.
  • 10. The system for automated reconfiguration of the distribution system of claim 8 wherein a last switch controller in the plurality of switch controllers receives the communicated information from a next to last switch controller in the plurality of switch controllers and transmits the communicated information to the first switch controller in the plurality of switch controllers.
  • 11. The system for automated reconfiguration of the distribution system of claim 1 including an ordering of switch controllers in the plurality of switch controllers; and switch controllers in the plurality of switch controllers communicate with switch controllers in the plurality of switch controllers which are adjacent in the ordering of switch controllers in the plurality of switch controllers.
  • 12. The system for automated reconfiguration of the distribution system of claim 1 wherein switch controllers in the plurality of switch controllers have an ordering, switch controllers in the plurality of switch controllers communicate information of a first type to switch controllers in the plurality of switch controllers which are adjacent in the ordering, and switch controllers in the plurality of switch controllers communicate information of a second type to a set of switch controllers in the plurality of switch controllers.
  • 13. A system for automated reconfiguration of a distribution system, comprising:a plurality of switches being operable between open and closed switch states, switches in the plurality of switches being located in the distribution system; a plurality of switch controllers; and switch controllers in the plurality of switch controllers controlling respective switches in the plurality of switches and including resources which monitor the distribution system, which communicate information with at least one other switch controller in the plurality of switch controllers including an address, normal switch state, present switch state, and fault detection state of the respective switch controller and respective switch, and which process the communicated information and monitor the distribution system in order to open their respective switches to perform fault isolation and close their respective switches to perform reconfiguration.
  • 14. In a distribution system including a plurality of switches located in the distribution system, a plurality of switch controllers, switch controllers in the plurality of switch controllers controlling respective switches in the plurality of switches, a method for automated fault isolation and reconfiguration of the distribution system, comprising the steps of:monitoring one or more conditions of the distribution system and detecting predetermined conditions requiring fault isolation or reconfiguration; communicating information from each of the plurality of switch controllers to one or more other switch controllers of the plurality of switch controllers, the communicated information including normal switch state, present switch state, and fault detection state of the respective switch controller and respective switch, the communicating step including receiving communicated information, processing the received communicated information, and transmitting communicated information based on the processing; and controlling operation of the respective switch based on the detection of the predetermined conditions and the communicated information.
  • 15. A system for automated reconfiguration of a distribution system, comprising:a plurality of switches being arranged in a predetermined configuration in a distribution system; and a plurality of switch controllers being arranged to control respective switches in the plurality of switches and including a resource which can do at least one of disengage and engage switch controllers in the plurality of switch controllers from acting as part of the system for automated reconfiguration of the distribution system, each of the switch controllers being responsive to sensed conditions of the distribution system and comprising means for communicating information to one or more other of the plurality of switch controllers so as to transmit and receive communicated information about the status of the one or more switch controllers including which switch controllers in the plurality of switch controllers have done at least one of engage and disengage from acting as part of the system for automated reconfiguration of the distribution of the system, each of the switch controllers in the plurality of switch controllers processes the sensed conditions and the communicated information in order to determine whether to operate their respective switches according to first predetermined conditions to perform fault isolation and thereafter to determine whether to operate their respective switches according to second predetermined conditions to perform reconfiguration of the distribution system.
RELATIONSHIP TO COPENDING APPLICATIONS

This application is a Continuation of application Ser. No. 09/294,588, filed Apr. 20, 1999, now U.S. Pat. No. 6,111,735, which is a Continuation of application Ser. No. 08/978,966, filed Nov. 26, 1997, now U.S. Pat. No. 6,018,449, which claims the benefit under 35 USC′ 119(e) of Provisional Application No. 60/032,576, filed Dec. 4, 1996, each of which is incorporated herein by reference in its entirety.

US Referenced Citations (34)
Number Name Date Kind
3152286 Field et al. Oct 1964
3331921 Neiswinter et al. Jul 1967
3702460 Blose Nov 1972
3970898 Baumann et al. Jul 1976
4057785 Furniss et al. Nov 1977
4075699 Schneider et al. Feb 1978
4315251 Robinson et al. Feb 1982
4359644 Foord Nov 1982
4396915 Farnsworth et al. Aug 1983
4535409 Jindrick et al. Aug 1985
4551718 Cookson et al. Nov 1985
4587588 Goldstein May 1986
4672555 Hart et al. Jun 1987
4745512 Hampson May 1988
4777381 Fernandes Oct 1988
4803635 Andow Feb 1989
4835651 Li et al. May 1989
4847780 Gilker et al. Jul 1989
4868410 Nakamura Sep 1989
4916628 Kugler Apr 1990
4972290 Sun et al. Nov 1990
4984124 Yeh Jan 1991
5006846 Granville et al. Apr 1991
5179376 Pomatto Jan 1993
5237511 Caird et al. Aug 1993
5303112 Zulaski et al. Apr 1994
5305174 Morita et al. Apr 1994
5341268 Ishiguro et al. Aug 1994
5513061 Gelbien et al. Apr 1996
5517423 Pomatto May 1996
5701226 Gelbien et al. Dec 1997
5760492 Kanoi et al. Jun 1998
5784237 Velez Jul 1998
5793750 Schweitzer III, et al. Aug 1998
Non-Patent Literature Citations (8)
Entry
Caird, K. et al., “An Advanced Distribution Automation RTU”, Westronic, Inc., Canada, 1990, pp. 1-8. (No Month).
“Model 2801-SC Automatic Switch Control User's Manual”, EnergyLine Systems, Inc., Berkeley, CA, DOC024-000691-0F, Nov. 2, 1995.
Casains, R., “Automatic Operation of Distribution Network In Areas of Medium Load Density”, International Conference on Electricity Distribution, London, IEE Contr. Pub. #99 (1973), pp. 191-196. (No Month).
Joslyn “Sectionalizers” advertisement, Joslyn Hi-Voltage Corporation, D.B. 750-202, Jun. 1996, pp. 1-8.
Cooper “Sectionalizers” advertisement for Electronically Controlled, Manually Closed, Types GV and GW, Cooper Power Systems, Electrical Apparatus 270-20, Oct. 1991, copyright 1990 Cooper Industries, Inc., pp. 1-15.
Cooper “Sectionalizers” advertisement for Hydraulically Controlled Types GH, GN3, GN3V, Cooper Power Systems, Electrical Apparatus 270-10, Jan. 1990, copyright 1990 Cooper Industries, Inc., pp. 1-13.
“Model 2800S Switch Control, Model 2801S Automatic Sectionalizer Control” Operation Guide (Preliminary), EnergyLine Systems, Inc., Doc. 2800S/2801S-003, Sep. 3, 1992, pp. 1-30.
L. Fendrick, “Intelligent Substation Improves Performance,” Transmission & Distribution World, Oct. 1998.
Provisional Applications (1)
Number Date Country
60/032576 Dec 1996 US
Continuations (2)
Number Date Country
Parent 09/294588 Apr 1999 US
Child 09/606461 US
Parent 08/978966 Nov 1997 US
Child 09/294588 US