The invention relates to a method for complementing dynamic resource-level path computation with a resource grouping constraint in a network and in particular in a wavelength division multiplexing (WDM) network.
A network can be modelled as a collection of switches or other network elements which are interconnected to each other via links. Each link can further be populated with a pool of resources. In the context of wavelength division layer networks these resources can refer to fixed or tunable wavelength channels available for a WDM layer connection.
In general, there exist relationships between the resources of a network. For example, attributes of a resource or operations on a resource within the network may have an effect on other resources of the network. These relationships between the resources may be induced by hardware or device limitations, operational dependencies or non-orthogonalities. There are also situations where an entire set of resources has to be treated in a manner distinct from other resources due to the nature of specific algorithm implementations which process the resource information base of the network in a particular manner. Relationships between resources in a network can also be induced directly through application requirements of specific operational policies defined for the respective network.
If relationships between resources are not known to an application which is provided to perform a computation on the resource information base this application may be unable to produce correct results, and/or be forced to execute heuristic-based procedures which achieve only sub-optimal results. Such heuristic-based procedures can often devolve into exhaustive searches which are unacceptable, for example in an on-line or time-critical environment.
Resource information models currently used for traffic engineering purposes treat provisionable resources of a network as entirely individual and unrelated entities. For example, the WSON architecture as defined within IETF identifies the notion of asymmetries within a switching element but does not make any provisions for the notion that the resources affected by these asymmetries may be inter-related in some non-trivial manner. This lack of relationship information data renders current applications unable to generate computationally complete results under certain conditions.
At present common information models treat resources as entirely individual entities, hence, any relationships amongst them are not expressed through the information model. Applications making use of this information model of the network are therefore currently not able to compute complete solutions in all cases, and thus are forced to utilize more heuristic approaches.
Consequently, there is a need to provide a method for complementing dynamic resource-level path computation taking into account relationships between resources.
The invention provides a method for complementing dynamic resource-level path computation with a resource grouping constraint in a network comprising the steps of:
In a possible embodiment of the method according to the present invention the network resources of the network resource group are controlled depending on predetermined traffic engineering goals.
In a possible embodiment of the method according to the present invention the network resource group is automatically generated by means of a resource auto-discovery mechanism.
In an alternative embodiment of the method according to the present invention the network resource group is manually configured by an operator of said network.
In a possible embodiment of the method according to the present invention the network resource group comprises network resources which are accessible on a network element of said network from the same or separate links.
In a possible embodiment of the method according to the present invention the network resources of the network resource group share a common set of attributes, functionalities and/or inter-relationships.
In a possible embodiment of the method according to the present invention the resource computation comprises a constrained mechanism for computing a path through said network.
In a possible embodiment of the method according to the present invention the network resources comprise atomically allocatable transport units within said network.
In a possible embodiment of the method according to the present invention the network is formed by an optical wavelength division multiplexing network.
The invention further provides a network with network resources comprising resource group function deriving means which are adapted to derive a resource group function amongst network resources of at least one network resource group of said network; and
In a possible embodiment of the network according to the present invention the network further comprises a resource control unit adapted to control network resources of said at least one network resource group depending on the computation result provided by said resource-level path computation unit.
In a further possible embodiment of the network according to the present invention the network resource group is automatically generated by means of a resource auto-discovery mechanism of said network.
In an alternative embodiment of the network according to the present invention the network resource group is manually configured by an operator of said network.
In a possible embodiment of the network according to the present invention the network is formed by an optical wavelength division multiplexing WDM network comprising optical channels, transponders and regenerators as network resources.
In a further possible embodiment of the network according to the present invention the optical wavelength division multiplexing network comprises at least one reconfigurable optical add drop multiplexer as a network element.
In a further possible embodiment of the network according to the present invention the reconfigurable optical add drop multiplexer comprises a multiport-tuneable filter to which tuneable transponders are connected.
In a further possible embodiment of the network according to the present invention the multiport-tuneable filter is controlled by said resource control unit depending on a computation result on the basis of the derived resource group function of a network resource group comprising said multiport-tuneable filter.
In a further possible embodiment of the network according to the present invention the multiport-tuneable filter of said reconfigurable optical add drop multiplexer is connected to at least one wavelength selective switch connecting said reconfigurable optical add drop multiplexer with at least one optical network segment.
In a further possible embodiment of the network according to the present invention the resource group function is stored in a data storage to which said path computation unit has access.
The invention further provides a program adapted to perform a method of dynamic resource-level computation with a resource grouping constraint in a network comprising the steps of:
In a further possible embodiment of the program according to the present invention the program comprises at least one traffic engineering application program.
In a further possible embodiment of the program according to the present invention the traffic engineering application program is a resource-level path computation application program.
In the following possible embodiments of a method for complementing dynamic resource-level path computation with a resource grouping constraint in a network o are described with reference to the enclosed figures.
As can be seen in
In a further step S2 the resource group function RGF is derived from relationships amongst network resources within at least one network element forming at least one network resource group NRG. Deriving the resource group function from the relationships amongst the network resources within the at least one network element of the network step S2 is performed automatically.
In a further step S3 the resource-level path computation is performed accounting for the derived resource group function RGF. The resource-level path computation can comprise a constraint mechanism computing a path through the network. The path computation algorithm is aware of the relationships between the resources in order to compute feasible paths within the network.
In a further possible embodiment of the method according to the present invention after having calculated the resource-level path in response to the resource group function RGF a resource control unit of the network or network element controls the network resources of the at least one network resource group NRG in step S4 on the basis of the resource-level path computation result and depending on predetermined traffic engineering goals.
As illustrated in
As can be seen in
In a further possible embodiment the network 1 further comprises a resource control unit 5 adapted to control network resources of the at least one network resource group NRG depending on the computation result provided by the resource-level path computation unit 4. In a possible embodiment the network 1 shown in
The resource group function deriving unit 3 as shown in
The relationships between resources can be induced via hardware or device limitations or non-orthogonalities. Other relationships can be induced directly through application or specific operational policies for the given network 1. For example, a network element containing a multi-port tunable filter 6 as shown in
As another example, resource relationships may also be created in order to express a particular capability such as providing protection or restoration functionality. Applications to the given resource as a primary source to protect a service may then introduce a relationship with other resources to become either selectable or excluded from use for the secondary resource.
Further, it is possible that resources of the network are explicitly grouped through manual configuration to indicate relationships between resources based on an administrative policy for the network. For example, individual resources of the network may be identified in a network resource group as being available for provisioning prior to actual insertion of the underlying facilities.
In order for applications to be able to process the resource relationships these relationships can be exposed to other applications. For example, a past computation algorithm can be aware of the relationships between network resources in order to properly compute feasible paths. In a possible embodiment the method according to the present invention provides an abstract grouping concept to an information model which allows normally hidden resource relationships to be expressed to applications which can then perform computationally complete operations on the respective information model. In a preferred embodiment network resource groups NRG are uniquely identifiable within a network element of the network and can be used either implicitly by an application performing computation or may be explicitly specified by an operator of the network as a constraint during service path computation. The method for complementing dynamic resource-level path computation with a resource grouping constraint in a network 1 can be performed by a program, for example, by a traffic engineering application program. This traffic engineering application program can be a resource-level path computation application program. The execution of such a program can be triggered in response to a command of a network operator or can be event driven, for example, when a configuration of the network 1 is changed or when an additional constraint occurs. Such a program can for example be executed by a control unit of the network 1. In a further embodiment the derived resource group function RGF of a network resource group NRG can be displayed to an operator of the network. In a further possible implementation the network operator can edit the resource group function RGF. In a further possible implementation the constraint expressed by the resource group function RGF can distinguish between physical constraints which cannot be influenced by the operator and configuration constraints which can be varied by the network operator. A resource group function RGF based on configuration requirements may be changed by the network operator according to traffic engineering goals. In contrast, if the resource group function RGF is based on physical requirements the derived resource group function RGF cannot be changed by the network operator. Consequently, the resource group function RGF can in a possible implementation be adjustable whereas the resource group function RGF can in another implementation be predetermined and fixed. In a possible embodiment the resource group function RGF is derived during operation of the network. The resource-level path computation can in a possible embodiment be performed during operation of the network taking into account the derived resource group function RGF. In a further possible embodiment the resource group function RGF is derived for planning the network before the operation of the network is started. In a further possible embodiment the deriving of the resource group function RGF from relationships amongst network resources of at least one network element forming at least one network resource group NRG can be performed in real time, for example when an event in the network is detected, e.g. a network failure of a network element or the like. In a further possible embodiment an error can be indicated to an operator if the configuration of network elements or network resources violate a given resource group function RGF.
The subject matter described herein can be implemented using a non-transitory computer-readable medium having stored thereon executable instructions that when executed by the processor of a computer control the computer to perform steps. For example, the various units described herein can be implemented in software stored in memory and executed by a microprocessor. Exemplary computer-readable media suitable for implementing the subject matter described herein include chip memory devices, disk memory devices, programmable logic devices, and application-specific integrated circuits. In addition, a computer-readable medium that implements the subject matter described herein may be located on a single device or computing platform or may be distributed across multiple devices or computing platforms.
This application claims the benefit of U.S. Provisional Patent Application Ser. No. 61/421,459, filed Dec. 9, 2010; the disclosure of which is incorporated herein by reference in its entirety.
| Number | Date | Country | |
|---|---|---|---|
| 61421459 | Dec 2010 | US |