- 1. A method for constructing a refrigerating cycle that has a first unit having a refrigerating compressor which is filled with a quantity of working medium and a first heat exchanger, and a second unit having a second heat exchanger that is located in an area of air conditioning and refrigeration, wherein the units are connected with each other by piping, the method comprising the steps of:
- connecting the first unit having the refrigerating compressor and the first heat exchanger with the second unit having the second heat exchanger that is located in an area of air conditioning and refrigeration by means of piping;
- removing oxygen in a system of the refrigerating cycle by providing an oxygen absorbent in a refrigerant circulating path;
- separating the oxygen absorbent from the refrigerating cycle; and
- circulating a refrigerant in the refrigerating cycle.
- 2. A method for constructing a refrigerating cycle according to claim 1, wherein
- the connecting, removing, separating and refrigerant circulating steps are carried out successively.
- 3. A method for constructing a refrigerating cycle according to claim 1, wherein
- the removing, separating, connecting and refrigerant circulating steps are carried out successively.
- 4. A method for constructing a refrigerating cycle according to claim 1, wherein
- the removing, connecting, separating and refrigerant circulating steps are carried out successively.
- 5. A method for constructing a refrigerating cycle that has a first unit having a refrigerating compressor which is filled with a quantity of working medium and a first heat exchanger, and a second unit having a second heat exchanger that is located in an area of air conditioning and refrigeration, wherein the units are connected by piping, the method comprising the steps of:
- connecting the first unit having the refrigerating compressor and the first heat exchanger with the second unit having the second heat exchanger that is located in an area of air conditioning and refrigeration by piping;
- substituting oxygen for gases within the second unit having the first heat exchanger that is located in an area of air conditioning and refrigeration and the piping:
- removing the oxygen in the refrigerating cycle by providing an oxygen absorbent in a refrigerant circulating path;
- separating the oxygen absorbent from the refrigerating cycle; and
- circulating refrigerant in the refrigerating cycle.
- 6. A method for constructing a refrigerating cycle according to claim 5, wherein
- the connecting, oxygen substituting, removing, separating and refrigerant circulating steps are carried out successively.
- 7. A method for constructing a refrigerating cycle according to claim 5, wherein
- the oxygen substituting, removing, separating, connecting and refrigerant circulating steps are carried out successively.
- 8. A method for constructing a refrigerating cycle according to claim 5, wherein
- the oxygen substituting, removing, connecting, separating and refrigerant circulating steps are carried out successively.
- 9. A method for constructing a refrigerating cycle according to claim 1, wherein
- the oxygen absorbent is metallic powders, and removes oxygen in the refrigerating cycle by solidifying the oxygen into metal oxides.
- 10. A method for constructing a refrigerating cycle according to claim 5, wherein
- the oxygen absorbent is metallic powders, and removes oxygen in the refrigerating cycle by solidifying the oxygen into metal oxides.
- 11. A method for constructing a refrigerating cycle according to claim 9, wherein
- the metallic powders are reduced iron powders.
- 12. A method for constructing a refrigerating cycle according to claim 10, wherein
- the metallic powders are reduced iron powders.
- 13. A method for constructing a refrigerating cycle according to claim 1, wherein
- the oxygen absorbent is a mixture of reduced iron powders and a metal chloride.
- 14. A method for constructing a refrigerating cycle according to claim 5, wherein
- the oxygen absorbent is a mixture of reduced iron powders and a metal chloride.
- 15. A method for constructing a refrigerating cycle according to claim 13, wherein
- the metal chloride is iron chloride.
- 16. A method for constructing a refrigerating cycle according to claim 14, wherein
- the metal chloride is iron chloride.
- 17. A method for constructing a refrigerating cycle according to claim 1, wherein
- the oxygen absorbent is a mixture containing reduced iron powders, metal chloride, metal hydroxide and water.
- 18. A method for constructing a refrigerating cycle according to claim 5, wherein
- the oxygen absorbent is a mixture containing reduced iron powders, metal chloride, metal hydroxide and water.
- 19. A method for constructing a refrigerating cycle according to claim 1, wherein
- the oxygen absorbent is a compound containing a metal sulfite.
- 20. A method for constructing a refrigerating cycle according to claim 5, wherein
- the oxygen absorbent is a compound containing a metal sulfite.
- 21. A method for constructing a refrigerating cycle according to claim 1, wherein
- in the removing step, the oxygen absorbent comes into contact with a part in the refrigerating cycle the part of which is filled with air or oxigen.
- 22. A method for constructing a refrigerating cycle according to claim 5, wherein
- in the removing step, the oxygen absorbent comes into contact with a part in the refrigerating cycle the part of which is filled with air or oxigen.
- 23. A method for constructing a refrigerating cycle according to claim 1, wherein the separating step is carried out after the removing step, and the refrigerant circulating step is a final step.
- 24. A method for constructing a refrigerating cycle according to clam 1, wherein the separating step is carried out immediately after the removing step, and the refrigerant circulating step is a final step.
- 25. A method for constructing a refrigerating cycle according to claims 5, wherein the removing step is carried out after the oxygen substituting step, the separating step is carried out after the removing step, and the refrigerant circulating step is a final step.
- 26. A method for constructing a refrigerating cycle according to claim 5, wherein the removing step is carried out after the oxygen substituting step, the separating step is carried out immediately after the removing step, and the refrigerant circulating step is a final step.
Priority Claims (2)
Number |
Date |
Country |
Kind |
7-295063 |
Nov 1995 |
JPX |
|
8-043932 |
Mar 1996 |
JPX |
|
Parent Case Info
This application is a continuation of application Ser. No. 08/748,351 filed Nov. 14, 1996, now abandoned.
US Referenced Citations (2)
Number |
Name |
Date |
Kind |
4304102 |
Gray |
Dec 1981 |
|
5036675 |
Anderson, Jr. |
Aug 1991 |
|
Foreign Referenced Citations (3)
Number |
Date |
Country |
3-70953 |
Mar 1991 |
JPX |
7-159004 |
Jun 1995 |
JPX |
7-269994 |
Oct 1995 |
JPX |
Continuations (1)
|
Number |
Date |
Country |
Parent |
748351 |
Nov 1996 |
|