The present disclosure relates to a method for constructing a cylindrical tank.
Cylindrical tanks with a dual-shell structure that have an inner tank and an outer tank are used for storing cryogenic liquid such as LNG (liquefied natural gas) and LPG (liquefied petroleum gas). Patent Document 1 discloses a cylindrical tank that has an inner tank made of metal and an outer tank made of concrete.
Patent Document 1 discloses a method of constructing a metal inner tank and a concrete outer tank at the same time in order to make the construction period of the cylindrical tank shorter. To be more specific, jack stands are erected on a base portion of the outer tank, and are then caused to support jack-up units at a predetermined height (see FIG. 4(b) of Patent Document 1). When a sidewall of the outer tank is built, an inner tank roof and an outer tank roof are assembled on the base portion of the outer tank. Subsequently, while the inner tank roof and the outer tank roof are being raised by use of the jack-up unit, plural stages of inner tank lateral plates are attached to the inner tank roof one by one from the uppermost level to the lowermost level. As a result, the metal inner tank and the concrete outer tank are simultaneously constructed.
Patent Document 1: Japanese Unexamined Patent Application, First Publication No. H07-62924
In the conventional technique that adopts the aforementioned jack-up construction system, into the space beneath an inner tank lateral plate that has been raised by the jack-up unit, an inner tank lateral plate to be attached next is taken through a construction site entrance. To be more specific, by use of hoist devices (denoted with reference numeral 6-2 in FIG. 6 of Patent Document 1) made of a rail and a hoist, inner tank lateral plates taken in through the construction site entrance are transferred to a predetermined welding position. To a lower section of the raised inner tank lateral plate, the next-stage inner tank lateral plate is welded.
However, around the next-stage inner tank lateral plate that is to be attached to the lower section of the raised inner tank lateral plate, there are few or no structures usable for preventing the inner tank lateral plate from falling. Therefore, when a next-stage inner tank lateral plate is taken in through the construction site entrance, it is necessary to pay close attention to prevent the inner tank lateral plate from falling.
The present disclosure has been achieved in view of the above problem, and has an object to provide a method for constructing a cylindrical tank that, in the case of adopting the jack-up construction system, is capable of securely preventing an inner tank lateral plate to be attached next from falling without requiring complicated operations.
To solve the above problem, a first aspect of the present disclosure is a method for constructing a cylindrical tank, including the step of assembling a metal inner tank by individually and sequentially conducting, on an internal side of a concrete outer tank, raising of an inner tank lateral plate by a jack-up unit and welding of a next-stage inner tank lateral plate onto a lower section of the raised inner tank lateral plate, further including the step of installing a guide pair for sandwiching the raised inner tank lateral plate onto the next-stage inner tank lateral plate that is to be welded therebeneath.
With the guide pair for sandwiching the raised inner tank lateral plate being installed on the next-stage inner tank lateral plate that is to be welded therebeneath, the raised inner tank lateral plate (a structure immediately above the next-stage inner tank lateral plate) is used to make it possible to prevent the next-stage inner tank lateral plate to be attached to the lower section of the raised inner tank lateral plate from falling.
A second aspect of the present disclosure is the first aspect as set forth above, further including the step of transferring the next-stage inner tank lateral plate in a circumferential direction of the tank while the raised inner tank lateral plate is sandwiched between the guide pair.
While the raised inner tank lateral plate is sandwiched between the guide pair, the next-stage inner tank lateral plate is transferred in the circumferential direction of the tank, to thereby utilize the raised inner tank lateral plate as a transfer rail. As a result, it is possible to easily transfer the next-stage inner tank lateral plate in the circumferential direction of the tank along the raised inner tank lateral plate.
A third aspect of the present disclosure is the second aspect as set forth above, wherein the guide pair has guide rollers that roll on plate surfaces of the raised inner tank lateral plate.
With the guide pair having guide rollers, it is possible to decrease the friction and noise produced between the guide pair and the raised inner tank lateral plate when the next-stage inner tank lateral plate is transferred in the circumferential direction of the tank.
A fourth aspect of the present disclosure is the second or third aspect as set forth above, wherein a plate surface of the raised inner tank lateral plate that faces an internal side of the tank is provided with a key nut, the method further including the step of installing a first guide member out of a pair of guide members that constitute the guide pair at a level below the key nut, the first guide member being opposed to a plate surface of the raised inner tank lateral plate that faces the internal side of the tank.
In the case where a key nut used for joining the adjacent inner tank lateral plates is provided on the plate surface of the inner tank lateral plate that faces the internal side of the tank, the first guide member is installed at a level below the key nut. Thereby, interference between the first guide member and the key nut is avoided, and a smooth transfer of the next-stage inner tank lateral plate in the circumferential direction of the tank is available.
A fifth aspect of the present disclosure is the fourth aspect as set forth above, further including the step of installing a second guide member out of the pair of the guide members that constitute the guide pair so as to extend to a level above the first guide member, the second guide member being opposed to a plate surface of the raised inner tank lateral plate that faces an external side of the tank.
With the second guide member that guides the plate surface of the inner tank lateral plate that faces the external side of the tank being extended to a level above the first guide member, it is possible to secure a wide guide area, where no key nut is provided, in the outward-facing plate surface that faces the external side of the tank.
According to the present disclosure, in a method for constructing a cylindrical tank that adopts the jack-up construction system, it is possible to securely prevent an inner tank lateral plate to be attached next from falling without requiring complicated operations.
Hereunder is a description of a method for constructing a cylindrical tank according to the present disclosure, with reference to the drawings. In the following description, a ground-type PC (prestressed concrete) double-shell tank configured to store LNG will be used as a cylindrical tank, by way of example.
As shown in
Subsequently, a base portion liner 6 is laid on the base plate 1. At the central portion of the base plate 1, a roof stand 7 is assembled. At a base end of the PC wall 2, a construction site entrance 8 through which the inner tank lateral plates 9 are to be taken in one by one is formed. Along an internal side of the base end of the PC wall 2, a plurality of portal stands 10 for assembling the inner tank lateral plates are installed. The portal stands 10 are installed so as to bridge across an annular area X, an area in which a cylindrical inner tank made of assembled inner tank lateral plates 9 is finally put down onto the base plate 1.
Subsequently, in the present technique, as shown in
Subsequently, in the present technique, on the PC wall 2 above the knuckle plate 11, in an inner-outer tank gap 15 (gap between the PC wall 2 and the inner tank lateral plates 9) above the base plate 1, a plurality of hanging-side jack stands 16 (hanging points) are installed along the circumferential direction of the tank. The hanging-side jack stand 16 is provided so as to protrude toward the internal side of the tank substantially horizontally from the PC wall 2 at a predetermined height. The hanging-side jack stand 16 is solidly and detachably fastened and fixed to, for example, an anchor plate embedded in the PC wall 2.
Furthermore, on the knuckle plate 11, there are installed a plurality of knuckle reinforcement members 17 corresponding to the hanging-side jack stands 16. The knuckle reinforcement member 17 protrudes from the knuckle plate 11 toward the inner-outer tank gap 15. The knuckle reinforcement member 17 functions as a hanged-side stand. Over the space between the hanging-side jack stand 16 and the knuckle reinforcement member 17, a jack-up unit 18 is installed. The jack-up unit 18 is a center hole jack. The main unit of the device is installed on the hanging-side jack stand 16, and a lower end of a jack-up rod 19 is attached to the knuckle reinforcement member 17.
After the jack-up units 18 are installed as described above, the roof stand 7 is removed and the knuckle plate 11 is hanged up by use of the jack-up units 18 as shown in
As shown in
On the inner tank lateral plate 9B, guide pairs 100 are installed. The guide pair 100 is a member configured to sandwich the inner tank lateral plate 9 lifted by jacking up (hereinafter, sometimes referred to as inner tank lateral plate 9A), to thereby prevent an inner tank lateral plate 9B, which is to be welded to a lower section of the inner tank lateral plate 9A, from falling. The guide pair 100 is made of a pair of guide members (a first guide member 110, a second guide member 120). The first guide member 110 is installed on one side of the inner tank lateral plate 9B. The second guide member 120 is installed on a second surface of the inner tank lateral plate 9B.
As shown in
As shown in
On the inward-facing plate surface 9A1 of the inner tank lateral plate 9A, there is provided a key nut 102. Furthermore, on the inward-facing plate surface 9B 1 of the inner tank lateral plate 9B, there is provided a key nut 102 as well. As joints when the inner tank lateral plates 9 are welded, the key nuts 102 are used for welding the adjacent inner tank lateral plates 9 to each other in advance.
To the key nut 102, there is attached a jig that, at the time of welding, positions and fixes the adjacent inner tank lateral plates 9. For example, as shown in
As shown in
On the other hand, the second guide member 120 is opposed to a plate surface of the inner tank lateral plate 9A (outward-facing plate surface 9A2), which faces an external side of the tank. The second guide member 120 is attached, via a horseshoe 101, to a plate surface of the inner tank lateral plate 9B (outward-facing plate surface 9B2), which faces the external side of the tank. The horseshoe 101 is made of a portal steel material similarly to the case of the one on the side of the first guide member 110. This horseshoe 101 is welded to the inner tank lateral plate 9B, and the second guide member 120 is fixed to the inner tank lateral plate 9B. Note that only one side of the horseshoe 101 has welded to the inner tank lateral plate 9B, similarly to the case of the one on the side of the first guide member 110.
The second guide member 120 has guide rollers 121 that roll on the outward-facing plate surface 9A2 of the inner tank lateral plate 9A. The guide rollers 121 have a rotation shaft 122 that extends vertically. The rotation shaft 122 is supported rotatably in the second guide member 120. In an upper end of the second guide member 120 that extends vertically, the guide rollers 121 are rotatable about the rotation shaft 122.
The outward-facing plate surface 9A2 of the inner tank lateral plate 9A is not provided with any key nuts 102. The second guide member 120 opposed to the outward-facing plate surface 9A2 of the inner tank lateral plate 9A is installed at a level above the first guide member 110. The second guide member 120 is opposed to a rear side of the key nuts 102 provided on the inner tank lateral plate 9A. Namely, the guide rollers 121 of the second guide member 120 roll at a height equivalent to that of the key nuts 102.
By the way, an upper stage of the inner tank lateral plate 9 is thin while a lower stage thereof is gradually thicker so as to be capable of withstanding weight, water pressure, and the like. As shown in
A plurality of guide pairs 100 with the above structure are installed along the upper end of the inner tank lateral plate 9B, as shown in
After installation of the guide pairs 100 as described above, an inner tank lateral plate 9B, which has been carried in through the construction site entrance 8 shown in
Furthermore, with the utilization of the inner tank lateral plates 9A as a transfer rail, it is possible to transfer an inner tank lateral plate 9B along the inner tank lateral plate 9A as a welding target. This makes it easy to vertically position the welding positions of the inner tank lateral plates 9A, 9B. The guide pair 100 has the guide rollers 111, 121 that roll on the plate surfaces of the inner tank lateral plate 9A, as shown in
Furthermore, the inward-facing plate surface 9A1 of the inner tank lateral plate 9A is provided with the key nut 102 for joining the adjacent inner tank lateral plates 9. In the present technique, the first guide member 110 opposed to the inward-facing plate surface 9A1 of the inner tank lateral plate 9A is installed below the key nut 102. This makes it possible for the guide rollers 111 to roll on the flat plane section A below the key nuts 102. Therefore, on the inward-facing plate surface 9A1 of the inner tank lateral plate 9A, smooth transfer of the inner tank lateral plate 9B in the circumferential direction of the tank while avoiding the interference with the key nuts 102 is available.
On the other hand, the outward-facing plate surface 9A2 of the inner tank lateral plate 9A is not provided with any key nuts 102. Therefore, in the present technique, the second guide member 120 opposed to the outward-facing plate surface 9A2 of the inner tank lateral plate 9 is installed above the first guide member 110. This makes it possible for the guide rollers 121 to roll at a height equivalent to that of the key nuts 102. Therefore, in the outward-facing plate surface 9A2 where no key nuts 102 are provided, a contact area between the guide rollers 121 and the outward-facing plate surface 9A2 is greater, to thereby make it possible to secure a wide guide area by the guide rollers 121.
After an inner tank lateral plate 9B is transferred to a predetermined welding position, the inner tank lateral plates 9B adjacent in the circumferential direction of the tank are welded to each other. As shown in
If the inner tank lateral plate 9B is to fall to the external side of the tank, the first guide member 110 constituting the guide pair 100 is brought into abutment with the inward-facing plate surface 9A1 of the inner tank lateral plate 9A, to thereby prevent the inner tank lateral plate 9B from falling. If the inner tank lateral plate 9B is to fall to the internal side of the tank, the second guide member 120 constituting the guide pair 100 is brought into abutment with the outward-facing plate surface 9A2 of the inner tank lateral plate 9A, to thereby prevent the inner tank lateral plate 9B from falling. The inner tank lateral plate 9B is not held by the jack-up units 18 unlike the case of the inner tank lateral plate 9A. Therefore, with this installation of the guide pairs 100, it is possible to prevent the inner tank lateral plate 9B from falling.
On the other hand, because held by the jack-up units 18, the inner tank lateral plate 9A is capable of receiving from the inner tank lateral plate 9B a load for fall prevention. Furthermore, because joined to each other in the circumferential direction of the tank, the inner tank lateral plates 9A have a strength in terms of shape as well. Furthermore, for example in the case where a load for fall prevention is applied at the same time from a plurality of inner tank lateral plates 9B, it is possible to easily limit the sway (positional displacement) of the inner tank lateral plate 9A caused by the load, if the inner tank lateral plate 9A, the knuckle plate 11, or the like is provided with a space keeper that is to be brought into abutment with the PC wall 2 to maintain the gap between the PC wall 2 and the inner tank lateral plate 9A.
Welding the inner tank lateral plates 9B adjacent to each other in the circumferential direction of the tank into a generally cylindrical shape eliminates the possibility that the inner tank lateral plate 9B will fall. Therefore, the guide pairs 100, which have become unnecessary, are removed. The first guide member 110 and the second guide member 120 are both attached, with wedges or the like, to the only one side of the horseshoes 101 which has welded. Therefore, with the wedge being struck in the reverse direction with a hammer or the like, it is possible to easily remove the guide pair 100. Note that the removed guide pairs 100 are reused for fall prevention and transfer of the inner tank lateral plate 9B to be carried in next.
After the inner tank lateral plates 9B are joined in the circumferential direction of the tank, an upper end thereof and a lower end of the inner tank lateral plate 9A are welded. Subsequently, the inner tank lateral plates 9 united by this welding is jacked up by the jack-up units 18. Into the space produced beneath the inner tank lateral plate 9A by the jacking up, a next-stage inner tank lateral plate 9B is carried, and the removed guide pairs 100 are installed thereon. Thus, the raising of each of the plurality of an inner tank lateral plate 9 by the jack-up units 18 and the welding of a next-stage inner tank lateral plate 9B to a lower section of the previous raised inner tank lateral plate 9A are individually and sequentially conducted.
During this working process, the cold insulation work on the annular section 13 is done beneath the portal stands 10.
The cold insulation work on the annular section 13 is done as follows. Perlite concrete blocks 41A, 41B and structural lightweight concrete blocks 42 are assembled on a base portion cold resistance relaxation material 39. Thereonto, an annular plate 43 is attached. Because the annular section 13 is a member that finally supports the assembled inner tank lateral plates 9, the annular plate 43 therefor is formed thick, and a cold insulation structure therefor is formed of hard material such as concrete blocks.
After completion of the cold insulation work on the annular section 13, leg portions 10c, which have been arranged in an area of the tank more inner than the annular section 13, is relocated on the annular section 13. With this relocation, no interfering entity is present in the area of the tank inner than the annular section 13. Therefore, it is possible to do the cold insulation work on a central section of the base plate 1. In the cold insulation work on the central section, foam glass 40 is placed onto the base portion cold resistance relaxation material 39 as shown in
Subsequently, as shown in
As shown in
After that, the knuckle reinforcement members 17 are cut off, and the jack-up units 18 are removed. After that, tensing work is done on the PC wall 2. Then, after the construction site entrance 8 is closed and the pump barrel 25 is installed, water is poured in and a pressure/airtight test is conducted.
Finally, as shown in
The aforementioned embodiment adopts a technique of a method for constructing a cylindrical tank 50, including the step of assembling a metal inner tank 30 by individually and sequentially conducting, on an internal side of a PC wall 2, raising of an inner tank lateral plate 9 by a jack-up unit 18 and welding of a next-stage inner tank lateral plate 9B onto a lower section of the raised inner tank lateral plate 9A, further including the step of installing a guide pair 100 configured to sandwich the raised inner tank lateral plate 9A onto the next-stage inner tank lateral plate 9B that is to be welded therebeneath. As a result, in the case of adopting the jack-up construction system, it is possible to prevent an inner tank lateral plate 9B to be attached next from falling.
While an embodiment of the prevent disclosure has been described above with reference to the drawings, the present disclosure is not limited to the embodiment. Shapes, combinations, and the like of the components shown in the embodiment are merely exemplary examples, and various modifications based on design requirements and the like can be made without departing from the scope of the disclosure.
For example, even if a structure as shown in
A guide pair 100 (a second guide member is not illustrated in
Furthermore, for example, in the aforementioned embodiment, a technique has been described in which the guide rollers are rolled on the surfaces of the raised inner tank lateral plate to transfer a next-stage inner tank lateral plate. However, the present disclosure is not limited to this technique. For example, even with guide pairs having the structure shown in
Furthermore, for example, in the aforementioned embodiment, a technique has been described in which a horseshoe is welded and the first guide member is attached to the inner tank lateral plate. However, the present disclosure is not limited to this technique. A pre-welded key nut may be utilized to attached the first guide member to the inner tank lateral plate.
Furthermore, for example, in the aforementioned embodiment, a technique has been described in which key nuts are welded in advance to the inward-facing plate surface of the raised inner tank lateral plate. However, the present disclosure is not limited to this technique. For example, in the case where no key nuts are welded to the raised inner tank lateral plate, the first guide member and second guide member that are to be attached to the next-stage inner tank substrate may be put at an equivalent height.
Furthermore, for example, in the aforementioned embodiment, the second guide member is positioned at a level above the first guide member and is installed at a height equivalent to that of the key nuts. However, the present disclosure is not limited to this. In terms of stability of the guide, it is preferable that the first guide member and the second guide member be partially overlapped in a height direction (see
Furthermore, for example, in the aforementioned embodiment, the first guide member and the second guide member have a similar structure. However, the present disclosure is not limited to this. For example, one of the first guide member and the second guide member may have guide rollers while the other may have no guide rollers. For example, the first guide member to which centrifugal force is applied when transferred in the circumferential direction of the tank may have guide rollers while the second guide member on which centrifugal force has little influence may have no guide rollers (the structure shown in
Furthermore, for example, the present technique is applicable not only to the aforementioned embodiment, but also obviously to the conventional technique of jacking up the inner tank lateral plate.
According to the present disclosure, in a method for constructing a cylindrical tank that adopts the jack-up construction system, it is possible to securely prevent an inner tank lateral plate to be attached next from falling without requiring complicated operations.
Number | Date | Country | Kind |
---|---|---|---|
2013-135162 | Jun 2013 | JP | national |
This application is a continuation application based on a PCT Patent Application No. PCT/JP2014/066998, filed on Jun. 26, 2014, whose priority is claimed on Japanese Patent Application 2013-135162, filed on Jun. 27, 2013. The contents of both the PCT Application and the Japanese Application are incorporated herein by reference.
Number | Name | Date | Kind |
---|---|---|---|
1453983 | Kerlin | May 1923 | A |
1631051 | Nichols | May 1927 | A |
1839578 | Morton | Jan 1932 | A |
1842735 | Spence | Jan 1932 | A |
1966244 | Hansen | Jul 1934 | A |
2057682 | Horton | Oct 1936 | A |
2216701 | Cole | Oct 1940 | A |
2378126 | Blair | Jun 1945 | A |
2708012 | Talcott | May 1955 | A |
2808097 | Martin | Oct 1957 | A |
2866261 | Macku | Dec 1958 | A |
2984898 | Svensson | May 1961 | A |
2993679 | Morgan | Jul 1961 | A |
3131908 | Payton | May 1964 | A |
3199839 | Linder | Aug 1965 | A |
3554491 | Tegtmeier | Jan 1971 | A |
3966533 | Goldsworthy | Jun 1976 | A |
4044517 | Schroter | Aug 1977 | A |
4062468 | Bongiovanni | Dec 1977 | A |
4067097 | Okamoto | Jan 1978 | A |
4177915 | Blankenburg | Dec 1979 | A |
4197689 | DeMuth | Apr 1980 | A |
4207716 | Moldrup | Jun 1980 | A |
4453351 | Moore | Jun 1984 | A |
4610376 | Regent | Sep 1986 | A |
4989751 | Gillett | Feb 1991 | A |
6282863 | Christian | Sep 2001 | B1 |
6715243 | Fons | Apr 2004 | B1 |
9441389 | Shiomi | Sep 2016 | B2 |
20080224022 | Kreiner | Sep 2008 | A1 |
20080302804 | Simmons | Dec 2008 | A1 |
20100154332 | Shockley | Jun 2010 | A1 |
20130319552 | Svarczkopf | Dec 2013 | A1 |
20140103046 | Hata | Apr 2014 | A1 |
20140138389 | Allen | May 2014 | A1 |
20140348619 | Granger | Nov 2014 | A1 |
20150197953 | Shiomi et al. | Jul 2015 | A1 |
20150267434 | Shiomi et al. | Sep 2015 | A1 |
20160097211 | Deguchi et al. | Apr 2016 | A1 |
Number | Date | Country |
---|---|---|
52-49666 | Dec 1977 | JP |
7-62924 | Mar 1995 | JP |
2012137671 | Oct 2012 | WO |
Entry |
---|
International Search Report mailed Aug. 26, 2014 in PCT/JP2014/066998 (with an English translation) (2 pages). |
Number | Date | Country | |
---|---|---|---|
20160083957 A1 | Mar 2016 | US |
Number | Date | Country | |
---|---|---|---|
Parent | PCT/JP2014/066998 | Jun 2014 | US |
Child | 14959154 | US |