Claims
- 1. A method for preparation of a cable, the method comprising the steps of:providing a first cable preparation device (1) and at least one second cable preparation device (2); operating the first cable preparation device (1) according to a first program control (3), and operating the at least one second cable preparation device (2) according to a separate, second program control (4) spatially separated from the first program control; connecting the at least one second cable preparation device (2) to the first cable preparation device (1) via a data transfer unit (5); transferring data from the first program control to the second program control via the data transfer unit; receiving all the transferred data in the second program control and selecting only a desired portion of the transferred data as control data for the second program control for controlling the second cable preparation device (2) during operation; and feeding at least a part of the control data for the second program control (4) back via the data transfer unit (5) to the first program control (3).
- 2. The method according to claim 1, further comprising the steps of selecting a third cable preparation device from the group of:a) a coiling device (2a) having a coiling pan or coiling plate (8a), b) a wire stacker (cable stacker), c) a prefeeder (cable unwinding unit), d) a cable marking device, e) a device for cable end preparation, comprising the operations of twisting, fluxing, tin-plating, soldering, welding, crimping, pressing-on of contacts or sleeves, mounting of seals, plug housings on the cable end, f) a device for cable layer preparation comprising mechanical or thermal tools, g) a cable transport device, h) a binding device, and effecting at least one of a preliminary, parallel and subsequent cable processing step based on the selected third device for cable processing.
- 3. The method according to claim 2, further comprising the steps of:selecting the coiling device as the third device for cable processing; gripping the cable in the coiling device (2a) with a clamping device (9) connected to the coiling device and clamping the cable; effecting acceleration and rotary movement of the cable with the coiling device (2a) in one of a feed direction (23) and an opposite direction to the feed direction during processing of the cable according to the second program control; producing one of a programmed tensile load on the cable within a defined tension range throughout the entire processing of the cable without any direct measurement of a cable tensile load, and a geometrically defined, tension-free laying of at least one cable end and cable windings of the coil during processing according to the second program control.
- 4. The method according to claim 2 further comprising the steps of:maintaining the rear end of a coiled cable in a cable feed arm (10) upon completion of cable processing; and rotating the coiling plate into a desired position wherein the ends of the cable comes to rest in a specific, preprogrammable position.
- 5. The method according to claim 4 further comprising the steps of:arranging a position detection sensor (7) on the coiling plate (8); controlling a coiling plate drive so that a rotary position of the coiling plate (8) can be fixed for cable feed, laying at least one of the cable ends of the coil in a defined position for removal or binding of the cable by one of a cable guide arm (19) and a rotary positioning of the coiling plate (8) according to the second program control (4a).
- 6. The method according to claim 5 further comprising the step of controlling the coiling plate drive according to at least one of tables and computational instructions with data for startup ramp controls.
- 7. The method according to claim 5 further comprising the steps of providing a braking mode to the coiling plate drive and equipping said coiling plate drive with a power consumption sensor which, during operation, monitors the power consumption of the coiling plate drive and feeds back the values for control purposes to the second program control.
- 8. The method according to claim 5 further comprising the step of positioning the third device for cable preparation is positioned one of upstream, downstream and parallel of the first device for cable preparation.
Priority Claims (1)
| Number |
Date |
Country |
Kind |
| 654/99 |
Apr 1999 |
CH |
|
CROSS REFERENCE TO RELATED DOCUMENT
The present application is a 371 application of PCT/IB00/00214 filed Feb. 28th 2000, which claims the benefit of Switzerland Patent Application No. 654/99, filed Apr. 8th 1999.
PCT Information
| Filing Document |
Filing Date |
Country |
Kind |
| PCT/IB00/00214 |
|
WO |
00 |
| Publishing Document |
Publishing Date |
Country |
Kind |
| WO00/62381 |
10/19/2000 |
WO |
A |
US Referenced Citations (17)
Foreign Referenced Citations (5)
| Number |
Date |
Country |
| 0 086 452 |
Aug 1983 |
EP |
| 0 330 840 |
Sep 1989 |
EP |
| 0 396 068 |
Nov 1990 |
EP |
| 0 474 152 |
Aug 1991 |
EP |
| 0 584 493 |
Mar 1994 |
EP |