Abstract
An apparatus and method for the installation of a deck on an offshore substructure. The invention is particularly useful with a floating substructure. Two independent pontoons each have two columns spaced apart from each other that extend upwardly from the pontoons. On each pontoon, a support beam attached to the columns spans the space between the columns. In another embodiment, there is no support beam across the space between the columns. Each pontoon is provided with ballast tanks that allow the pontoons to be selectively ballasted or de-ballasted to control pontoon depth for receiving a deck or installing a deck on an offshore substructure. The pontoons may be ballasted down during transit of the deck such that the main body portion of the pontoons is below significant wave action and the columns present a relatively small water plane area. The pontoons allow the deck to be placed directly above the offshore substructure. For a floating substructure, the pontoons are ballasted while the floating substructure is simultaneously de-ballasted to transfer the deck to the floating substructure.
Description




BACKGROUND OF THE INVENTION




1. Field of the Invention




The invention is generally related to the installation of offshore structures and more particularly to the installation of a deck on a substructure offshore.




2. General Background




In the construction and installation of offshore structures used in hydrocarbon drilling and production operations, it is much easier and less expensive to construct a large offshore structure on land and tow it to the site for subsequent installation than it is to construct the structure at sea. Because of this, every attempt is made to decrease the amount of offshore work that may be needed in an effort to minimize the cost of the structure. Regardless of these efforts, however, a certain amount of offshore work is still required in each case.




In the part, when the deck of a large offshore platform was to be installed, it was often found desirable to build the deck as one large component and install it fully assembled by lifting it from the tow barge and placing it upon the substructure. Unfortunately, as the decks became larger and heavier, there were fewer heavy-lift cranes that could handle such a load. If the deck became too large or heavy to be handled by cranes, it was divided into smaller components that were then each individually lifted into place. This prolonged the installation process since multiple lifts were required and, once in position, the equipment on the separate components had to be inter-connected and tested, thereby necessitating a large amount of offshore work.




An alternate method to dividing the deck into smaller components was to build the deck as a complete unit on shore and then skid this oversized deck onto a relatively narrow barge so that the sides of the deck extended beyond the edges of the barge. The barge would then be transported to the installation site where it would be maneuvered between the upright supports of the substructure (thus the need for a narrow barge and for a wide gap between the upright supports of the substructure) Once in place, the barge would be selectively ballasted, causing it to float lower in the water, and enabling the deck to come to rest upon the upright supports of the substructure. Afterwards, the barge would be moved out from under the deck and de-ballasted.




There are a number of disadvantages to this method. It is limited to a substructure with a large open area in its central region near the water line in order to accept the barge. The barge must also have sufficient beam width to provide stability against roll whenever the deck is supported on the barge. Thus, the substructure and barge, as well as the structural efficiency of the substructure and deck are all interrelated.




The manner of ballasting the barge prior to transferring the deck onto the substructure also posed problems. The ballasting had to occur rather quickly, almost instantaneously, while the deck was properly located and aligned with respect to the substructure. Any sudden wave or wind force could cause such alignment to go astray or the barge's heave could cause damage to the deck or substructure.




With the advent of floating structures, such as spar type structures and TLP's (tension leg platforms), the ballasting of the vessel supporting the deck can not be carried out quickly. A large deck, for example, one that weighs 15,000 tons, will cause the floating substructure to move downward and, unless the floating substructure is de-ballasted to compensate for this increased weight, it will lose freeboard and could sink. To avoid this, large amounts of water must be pumped out of the floating substructure and this must be done rapidly to avoid repetitive slamming between the deck and the substructure if the seas are rough.




Applicants are aware of U.S. Pat. No. 5,403,124, which discloses a semi-submersible vessel for transporting and installing a deck of an offshore platform onto a substructure. The towing vessel is configured with a cutout or opening therein that surrounds the substructure onto which the deck is to be placed.




A disadvantage of the vessel in U.S. Pat. No. 5,403,124 is that it is limited to a certain maximum size of offshore structure in direct relation to the size of the vessel.




SUMMARY OF THE INVENTION




The invention addresses the above problems. What is provided is an apparatus and method for the installation of a deck on an offshore substructure. The invention is particularly useful with a floating substructure. Two independent pontoons each have at least two columns spaced apart from each other that extend upwardly from the pontoons. On each pontoon, a support beam attached to the columns spans the space between the columns. In another embodiment, there is no support beam across the space between the top of the columns. Each pontoon is provided with ballast tanks that allow the pontoons to be selectively ballasted or de-ballasted to control pontoon depth for receiving a deck or installing a deck on an offshore substructure. The pontoons may be ballasted down during transit of the deck such that the main body portion of the pontoons is below significant wave action and the columns present a relatively small water plane area. The pontoons allow the deck to be placed directly above the offshore substructure. For a floating substructure, the pontoons are ballasted while the floating substructure is simultaneously de-ballasted to transfer the deck to the floating substructure. The pontoons are then easily move away from the offshore substructure, de-ballasted, and then transported to a storage or building site for further use.











BRIEF DESCRIPTION OF THE DRAWINGS




For a further understanding of the nature and objects of the present invention reference should be made to the following description, taken in conjunction with the accompanying drawings in which like parts are given like reference numerals, and wherein:





FIG. 1

is a perspective view of a deck on the pontoons of the invention.





FIG. 2

is a perspective view of one of the pontoons of the invention.





FIG. 3

is a side partial schematic view of a pontoon of the invention.





FIG. 4

illustrates a deck being skidded onto a barge.





FIG. 5

illustrates the deck and barge of

FIG. 3

in tow.





FIGS. 6A

, B illustrate a pontoon of the invention at different drafts.





FIGS. 7A

, B illustrate the transfer of the deck to the pontoons of the invention.





FIG. 8

illustrates the pontoons supporting the deck at a draft for transit in sheltered water.





FIG. 9

illustrates the pontoons supporting the deck at a draft for transit in open water.





FIGS. 10A

, B illustrate movement of the deck and pontoons above a floating structure.





FIG. 11

is a side view of the deck and pontoons in position for the transfer of the deck to the offshore structure.





FIG. 12

is an end view of the structures in FIG.


11


.





FIG. 13

is a side view illustrating contact between the deck and offshore structure during the transfer operation.





FIG. 14

illustrates the movement of the pontoons downward from the deck.





FIG. 15

illustrates the movement of the pontoons laterally away from the deck and floating offshore structure.





FIGS. 16A

, B illustrate an alternate transit method which includes the use of a heavy lift semi-submersible vessel.





FIG. 17

illustrates another embodiment of the invention.





FIG. 18

illustrates the embodiment of

FIG. 17

supporting a deck.





FIG. 19

illustrates use of the invention to transfer a deck to a fixed offshore substructure.











DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENT




Referring to the drawings, it is seen in

FIGS. 1-3

that the invention is generally indicated by the numeral


10


. Although at least two buoyant pontoons


10


are required to carry out the invention, only one will be described since each pontoon is essentially identical.




Each pontoon


10


is formed from a main hull portion


12


, two columns


14


which extend vertically from the main hull portion


12


, and a support beam


16


which spans the columns


14


.




As best seen in

FIG. 3

, the main hull portion


12


includes a plurality of separate ballast tanks


18


along the length of the main hull portion. Ballast tanks


18


are generally considered to be normal ballast tanks from the standpoint that they are not necessarily designed for rapid filling or emptying.




Rapid fill ballast tanks


20


are provided in columns


14


. Vent lines


24


and compressed air injection lines


26


for rapid fill ballast tanks


20


are schematically illustrated in FIG.


3


.




When required by water depth or transit distance, the deck


28


may first be loaded onto a transit barge


30


as illustrated in FIG.


4


. The barge


30


and deck


28


are then towed by a self-propelled vessel


32


to water having a suitable depth (at least sixty feet) for transfer to the pontoons


10


.




As seen in the side view of

FIGS. 6A and 6B

, the pontoons


10


are ballasted down until the tops of each of the pontoon's columns


14


and the support beams


16


can pass underneath the overhand portion of the deck


28


on either side of the barge


30


. The pontoons


10


are then positioned on either side of the barge


30


under the deck


28


as seen in FIG.


7


A. As seen in

FIG. 7B

, the pontoons


10


are de-ballasted to the extent necessary to raise the deck


28


clear of the barge


30


. This operation could also include ballasting the barge


30


down to implement the de-ballasting of the pontoons


10


.




Once the deck


28


is clear of the barge


30


, the barge


30


is removed and the pontoons


10


are ballasted to a selected towing draft as seen in FIG.


8


. This draft may be governed by the water depth of the route to open sea. For example, if the minimum water depth of the route were thirty feet, the towing draft of the pontoons


10


would be set to clear this depth.




When the tow reaches deeper water and open sea, as seen in

FIG. 9

, the pontoons


10


are ballasted down to a draft that minimizes the motions of the pontoons


10


and deck


28


. Normally, the water line for such an open sea tow will be approximately halfway between the top of the submerged pontoon


10


and the underside of the support beam


16


. The pontoons


10


and deck


28


are then towed to the installation site. At this open sea tow draft, the pontoons


10


and deck


28


are able to withstand very severe seas because of the reduced water plane of the pontoon columns


14


. Model tests show that the tow will withstand the seas having significant waves of forty feet without undergoing excessive motions.




As seen in

FIG. 10A

, if the offshore substructure


34


is a floating substructure it is moored in place prior to the arrival of the deck


28


and also is ballasted down to a draft such that the top of the offshore substructure is below the lower mating surface


36


of the deck


28


. This will tend to position the top of the floating offshore structure


34


approximately ten to fifteen feet above the water surface


38


. A winch


40


and winch line


42


may be connected between the pontoons


10


and offshore substructure


34


for movement of the pontoons


10


and deck


28


relative to the offshore substructure


34


. For ease of illustration,

FIG. 10B

does not include the deck


28


.

FIG. 10B

illustrates the attachment points of winch lines


42


beyond the midpoint of the floating offshore structure


34


, which is necessary to achieve the proper positioning of the deck


28


. The movement of the pontoons


10


and winch lines


42


is shown in phantom view. Lines


43


may be used in conjunction with anchors or vessels to control swinging motions during the operation.




As seen in

FIGS. 11 and 12

, the pontoons


10


are moved to straddle the offshore substructure


34


such that the deck


28


is over the top of the offshore substructure


34


.




A procedure for transferring load from the pontoons


10


to the substructure


34


is as follows: The pontoons


10


are positioned over the substructure


34


and the horizontal position is fixed with winch lines


42


. The pontoons


10


are ballasted and/or the substructure


34


is de-ballasted until the deck


28


is within a docking distance of the substructure


34


, typically about four feet. At this point, alignment pins become engaged with slots which insure proper contact points. When alignment is secured, the rapid flooding tanks are flooded to a sufficient amount of deck load to the substructure


34


to insure that operational waves will not cause separation and impact of the deck


28


and the substructure


34


. Model tests have been performed showing that between ten to twenty percent of the deck load should be transferred in this step to mitigate impacts in seas between six to ten feet. This criteria, that the pontoons


10


must rapidly ballast through a four foot draft change and enough displacement to transfer ten to twenty percent of the deck weight to the substructure


34


, sets the minimum volume for the rapid flooding tanks. Also, the rate of ballasting is limited by the size of openings


22


and the vent area


24


and these properties must be carefully considered in the design.




Once the required amount of initial deck load is transferred, the pontoons


10


may be ballasted and/or the substructure


34


de-ballasted at a slower rate with the criteria that the pontoon draft be maintained at a position of favorable responses, i.e. that the pontoons remain submerged and that the water plane intersect the columns with a suitable freeboard to the pontoon decks. At some point in the load transfer when the deck load on the substructure is between approximately forty to sixty percent, the rapidly flooding tanks on the pontoon need to be de-ballasted by supplying compressed air. This is because the rapid ballasting feature should be used again at the end of the load transfer to cause the pontoons to fall away from the deck quickly when the entire load is transferred.




As seen in

FIG. 15

, the pontoons


10


are then moved away from the offshore substructure


34


and the offshore substructure


34


continues to be de-ballasted until it reaches a pre-selected operating draft. Final hook up between the offshore substructure


34


and deck


28


may then be made.




The above procedure may also be reversed to remove a deck from an offshore substructure and then transport the deck back to a dockside location. It should also be understood that it is possible to eliminate the use of the barge


30


when there is suitable water depth adjacent the fabrication site for direct loading of the deck


28


onto the pontoons


10


.





FIG. 16A

, B illustrate the use of a heavy lift vessel


46


in conjunction with the pontoons


10


. The heavy lift vessel


46


is ballasted down and the pontoons


10


, with the deck


28


loaded thereon, are moved into position above the vessel


46


. The vessel


46


is then de-ballasted and the pontoons


10


and deck


28


are secured to the vessel


46


. This would be useful where the increased speed of the vessel


46


provides an advantage either relative to time constraints or the distance to the installation site. Once at the installation site, the pontoons


10


and deck


28


are floated off the vessel


46


and the deck installation is carried out as described above. As an alternative, the barge


30


may also be used in conjunction with the vessel


46


in the same manner as described for the pontoons


10


.




It should be understood that the pontoons


10


may also be used to transfer the deck


28


to a fixed offshore substructure


48


as seen in FIG.


19


. The only difference is that the fixed offshore substructure is not de-ballasted.




The pontoons


10


are designed and proportioned to minimize wave-induced motion when supporting the deck


289


during the open sea to the installation site and during the time that the deck is floated over the offshore substructure for transfer thereto. The pontoons must have sufficient displacement to support the weight of the deck and must be stable throughout all ranges of draft. On pontoons designed to support a seventeen thousand-ton deck, the normal ballast tanks are designed to take on and discharge ballast water at relatively normal rates (i.e.: fifty tons/minute). The rapid fill ballast tanks are designed to each hold five hundred tons of water. Typical dimensions for such pontoons would be as follows: two hundred fifty feet in length, forty feet in width, sixty feet tall at the columns, twenty feet tall at the lower portion of the pontoon, one hundred ten foot spacing between two columns, and one hundred fifty foot spacing between the outermost edges of two columns. Although the description and drawings refer to two columns on the pontoons, it should be understood that more than two columns may be provided on the pontoons if required.




An advantage of the invention, during installation, is the relatively large change in pontoon draft that may be achieved with relatively small amounts of ballasting/de-ballasting. For example, the dimensions described above indicate a total capacity of two thousand tons for the rapid fill ballast tanks. The water plane area for this case results in a draft change of approximately one foot for each one hundred fifty tons of ballast change. Thus, only six hundred tons of ballast needs to be taken on to close the initial four-foot clearance between the deck and the floating substructure.





FIG. 17

illustrates another embodiment of the invention where there is no support beam across the space between the columns


14


.

FIG. 18

illustrates a deck


28


that is supported directly on the columns


14


of this embodiment. The embodiment with no support beam across the space between the columns


14


provides the following advantages over the embodiment that includes the support beam. The lack of the support beam can reduce the amount of material required to build the pontoons


10


and thus can result in reduced cost for production. The lack of the support beam also results in a lower center of gravity for the pontoon and thus increased stability when floating singularly.




Because many varying and differing embodiments may be made within the scope of the inventive concept herein taught and because many modifications may be made in the embodiment herein detailed in accordance with the descriptive requirement of the law, it is to be understood that the details herein are to be interpreted as illustrative and not in a limiting sense.



Claims
  • 1. A method for the installation of a deck on a floating offshore substructure, comprising the steps of:a. placing the deck on a floating barge such that the deck extends beyond the edges of the barge; b. providing at least two independent buoyant pontoons each formed from a main hull portion having two columns spaced apart from each other along the length of the hull and extending upwardly therefrom; c. ballasting said pontoons such that the columns thereon are below the deck; d. positioning said pontoons on both sides of the barge such that said pontoons are under the deck; e. de-ballasting said pontoons such that said pontoons support the deck independently from the barge; f. positioning said pontoons to straddle the floating offshore substructure such that the deck is above the top of the floating offshore substructure; and g. ballasting said pontoons and de-ballasting the floating offshore substructure to transfer the deck to the floating offshore substructure.
  • 2. A method for the installation of a deck on an offshore substructure, comprising the steps of:a. placing the deck on a floating barge such that the deck extends beyond the edges of the barge; b. providing at least two independent buoyancy pontoons each formed from a main hull portion having two columns spaced apart from each other along the length of the hull and extending upwardly therefrom; c. ballasting said pontoons such that the columns thereon are below the deck; d. positioning said pontoons on both sides of the barge such that said pontoons are under the deck; e. de-ballasting said pontoons such that said pontoons support the deck independently from the barge; f. positioning said pontoons to straddle the offshore substructure such that the deck is above the top of the offshore substructure; and g. ballasting said pontoons to transfer the deck to the floating offshore substructure.
  • 3. A method for the installation of a deck on a fixed offshore substructure, comprising the steps of:a. placing the deck on a floating barge such that the deck extends beyond the edges of the barge; b. providing at least two independent buoyant pontoons each formed from a main hull portion having two columns spaced apart from each other along the length of the hull and extending upwardly therefrom and a support beam between said columns; c. ballasting said pontoons such that the support beams thereon are below the deck; d. positioning said pontoons on both sides of the barge such that said pontoons are under the deck; e. de-ballasting said pontoons such that said pontoons support the deck independently from the barge; f. positioning said pontoons to straddle the fixed offshore substructure such that the deck is above the top of the fixed offshore substructure; and g. ballasting said pontoons to transfer the deck to the fixed offshore substructure.
CROSS REFERENCES TO RELATED APPLICATIONS

This application is a continuation-in-part of U.S. application filed Oct. 15, 1997 and assigned Ser. No. 08/951,095 now U.S. Pat. No. 5,924,822.

US Referenced Citations (7)
Number Name Date Kind
3078680 Wepsala Feb 1963
4176614 Goss et al. Dec 1979
4232625 Goren et al. Nov 1980
4556004 Lamy et al. Dec 1985
4729695 Silvestri Mar 1988
4825791 Foster, Jr. et al. May 1989
4909174 Bowes Mar 1990
Foreign Referenced Citations (1)
Number Date Country
2184402 Jun 1987 GB
Continuation in Parts (1)
Number Date Country
Parent 08/951095 Oct 1997 US
Child 09/333060 US