Claims
- 1. A method for accurately determining lifting distances of a load hook on a crane with a frame, at least one extensible length boom mounted on said frame and adapted for movement between a plurality of angles in at least one vertical plane, a rope for hoisting and lowering a load attached to the hook, said hook being operatively connected to said rope and supportively suspended from said boom, winch means mounted on said frame for hoisting and lowering said rope and hook therewith, a CPU means, a key group for entering data in the CPU means, a screen means for graphically and numerically displaying operation modes of the crane, a plurality of crane operation parameter sensors mounted on the crane at predetermined positions for generating and transmitting signals representative of the boom length, angle, rope lengths and the hook positions to the CPU means, comprising the steps of:
- a) setting the frame and boom of the crane in a first preselected operation state and entering the data representative of said state into the CPU means by the key group;
- b) using the data from the first preselected operation state of the boom for establishing a first hook overhoist position below a selected portion of said boom;
- c) using the first hook overhoist position for determining a hook lifting distance relative to a preselected datum located vertically below said first hook overhoist position;
- d) generating signals by operation parameter sensors to indicate changes in the boom length and angle relative to said first preselected operation state, and transmitting the generated signals to the CPU means;
- e) measuring the extension and retraction lengths of the rope when hoisting and lowering the hook;
- f) determining the distance of the hook from the first overhoist position by calculating the accumulated extension and retraction lengths values of the rope with the CPU means and a rope movement parameter sensor;
- g) resetting the accumulated rope extensions and retraction lengths to a zero (0) value in response to the load hook reaching said first overhoist position; and
- h) displaying graphically and numerically the boom length, boom angle and hook lifting distance between said preselected datum and said first hook overhoist position.
- 2. A method according to claim 1, wherein an overground height of the load hook at the first hook overhoist position is the maximum lifting distance at the first preselected operation state.
- 3. A method according to claim 1, wherein said resetting of the accumulated rope extensions and retraction lengths is conducted only when the load hook is at the first overhoist position longer than a predetermined time period.
Parent Case Info
This is a continuation application of U.S. Ser. No. 07/834,331, filed as PCT/JP90/00784, on Jun. 14, 1990 published as WO91/1966, on Dec. 26, 1991 now abandoned.
US Referenced Citations (5)
Foreign Referenced Citations (18)
Number |
Date |
Country |
1205161 |
May 1986 |
CAX |
2155446 |
May 1973 |
DEX |
54-30754 |
Sep 1979 |
JPX |
140350 |
Oct 1979 |
JPX |
75393 |
Jun 1981 |
JPX |
149995 |
Nov 1981 |
JPX |
56-47117 |
Nov 1981 |
JPX |
58-23883 |
Feb 1983 |
JPX |
74496 |
May 1983 |
JPX |
53338 |
Mar 1984 |
JPX |
60-107710 |
Jul 1985 |
JPX |
119585 |
Jul 1986 |
JPX |
27896 |
Jul 1986 |
JPX |
62-205993 |
Sep 1987 |
JPX |
63-178291 |
Nov 1988 |
JPX |
992404 |
Feb 1983 |
RUX |
1104098 |
Jul 1984 |
RUX |
1527134 |
Dec 1989 |
RUX |
Non-Patent Literature Citations (1)
Entry |
Liebherr Operating Instruction Manual, Germany 1970. |
Continuations (1)
|
Number |
Date |
Country |
Parent |
834331 |
Feb 1992 |
|