A more complete appreciation of the invention and many of the attendant advantages thereof will be readily perceived as the same becomes better understood by reference to the following detailed description when considered in connection with the accompanying drawings, wherein:
Other features of this invention will become apparent in the course of the following description of exemplary embodiments, which are given for illustration of the invention and are not intended to be limiting thereof.
Exemplary embodiments of the present invention will now be explained by referring to figures.
First, a hopper part 23 which is provided on the lower end of the furnace unit 20 is cut off along dash-dotted line L1 in
An operator enters into the furnace unit 20 from the enlarged opening 30 by using a machine such as a lift (not shown). Then, the operator installs a first support (rack support) 36 in the furnace unit 20 at a height which is approximately the level of the lower end of the heat recovery area 22 as shown in
As shown in a schematic bottom view in
The first support 36 is provided in the furnace unit 20 so that each of the support bars 37 and 39 penetrates the furnace wall 27. The bars 37 and 39 are welded to the furnace wall 27 for fixing the first support 36 to the furnace unit 20.
For welding the bars 37 and 39 to the furnace wall 27, the operator can go up to a position where the first support 36 is to be installed by riding on an apparatus for high-spot operations such as a lift or a gondola. Examples of these apparatus include machines which can go through a narrow opening, as disclosed in Japanese Kokai Applications 11(2001)-50651 and 11(2001)-131789. In the present invention, however, the enlarged opening 30 is prepared in the furnace unit 20. Therefore, the operator and the support 36 can be easily conveyed to the height for the operation.
As a second support installation step at S103 in
As shown in a schematic view in
A boiler supporting step is described in S104 in
The extendable parts 40a and 42a are configured as telescopic forms which are prepared from hollow cylinders with different diameters. The cylinders can have a layered/contraction structure by inserting one cylinder to another. By using an apparatus such as a hydraulic machine, the lengths of the extendable parts 40a and 42a are increased by upwardly bringing a cylinder with a small diameter with respect to a cylinder with a large diameter provided at a lower position. As a result, the jacks 40 and 42 are extendable in a vertical direction so as to have a length of about several tens meters.
Since the supports 36 and 38 have a lattice configuration as shown in
In the present invention, the extendable parts 40a of the first support 36 is inserted in the furnace unit through the enlarged opening 30. Therefore, the furnace unit 20 can be supported without interfering with the attachment such as the control floor or piping.
Thereafter, suspending members 14, which are used for suspending the boiler 10 from the boiler building 12 (supporting structure), are cut off along dash-dotted line L2 in
The subsequent step, S106 in
When the upper remaining part 10c is disassembled from the exterior of the boiler building 12, it is possible to prepare an opening in the boiler building 12, which is for introducing a front attachment of the heavy machine, such as a digger of a power shovel. Such opening can be prepared by cutting some of the columns 12a and the beams 12b.
According to the method for disassembling a boiler of the invention, it is possible to remove a disassembling operation carried out by suspending the boiler. This is because the entire weight of the boiler 10 is supported by the jacks provided under the bottom part of the boiler 10. Furthermore, in the present invention, it is not necessary to use members for supporting the boiler 10 by utilizing the limited space around the boiler 10. To the contrary, the boiler 10 can be supported from the bottom by using the interior space of the furnace unit 20 in the present invention. Therefore, the disassembling operation can be smoothly carried out without interfering with the boiler attachment such as piping.
For performing the operation, for example, an opening (not shown) is formed in the boiler building 12 for introducing the connection bars 51. Further, a wall opening 45 is prepared in the wall 20a of the furnace unit 20 at a position opposing to the opening in the boiler building 12. Moreover, another wall opening 46 is prepared in the wall 20a at a position opposing to the wall opening 45. From the outside of the boiler building 12, the connection bars 51 are inserted to the opening in the boiler building, the wall openings 45 and 46. Therefore, the connection bars 51 reach the lower end 22a of the heat recovery area 22. Then, the connection bars 51 are fixed to the wall 20a of the furnace unit 20 and the lower end 22a of the heat recovery area 22, by welding. Then, the support bars 37 and 41 is welded to the connection bars 51 so as to extend in a perpendicular direction with respect to the connection bars 51.
When the support force is applied by the jacks 40 to the first support 36, the force is distributed to the second support 38. To the contrary, the support force applied by the jacks 42 to the second support 38 is distributed to the first support 36. Namely, the jacks 40 and 42 support the first and the second support 36 and 38 (
It is possible to prepare the struts 48a from various materials. In particular, a metal material with a large rigidity such as iron is preferably used. The struts 48 stretch between the main girder 12c and the first support 36, and increase the resistance of the first support 36 against the force applied by the jack 40. Consequently, the support 36 can further stably support the weight of the boiler 10.
The specific feature of the second embodiment is that the boiler 10 is disassembled simultaneously with the boiler building 12. The explanation of the reference numerals is omitted, for the structures which are the same as those in the first embodiment
Similarly to the first embodiment, the enlarged opening 30 is prepared in the furnace unit 20, after the gas duct 26 is removed (enlarged opening forming step). Thereafter, connection bars 53 (
For installing the connection bar 53 in the boiler building 12, for instance, open 55, 57 and 59 are prepared in the boiler building 12, and a wall opening 45 and an opposing wall opening 46 are prepared in the wall 20a of the furnace unit 20. The openings 55, 57, 59, 45 and 46 are prepared at a height corresponding to the lower end of the heat recovery area 22. Furthermore, the openings 55, 57, 59, 45 and 46 are prepared so that the connection bars 53 are introduced to the boiler building 12 through the openings 55 and 57, and exit from through the boiler building 12 from the opening 59, via the wall openings 45 and 46. Namely, the wall opening 45 in the wall 20a oppose with the openings 55 and the 57 in the boiler building 12, and the wall openings 45 and 46 in the wall 20a oppose with each other. Then, the connection bars 53 are installed so as to penetrate the openings 55, 57, 59, 45 and 46. Then, the support bars 37 and 41 is welded on the connection bars 53 so as to extend in a perpendicular direction with respect to the connection bars 51.
After the jacks 40 and 42 are installed, the extendable parts 40a and 42b are brought into contact with the bars 37 and 41 in the first and the second support 36 and 38, respectively. The first and the second supports 36 and 38 and the connection bars 53, which are supported by the jacks 40 and 42, support the entire weight of the boiler 10 and the boiler building 12 (boiler and supporting structure supporting step).
As shown in
As shown in
After completing the cutting off operation with respect to the parts 10b and 12d which are lower than line L3, the extendable parts 50a of the jacks 50 are extended again until the extendable parts 50a contact the cut ends of the lower part 12b of the boiler building 12, as shown in
The above described operation with respect to the part 12b supported by the jacks 50 is carried out successively. In other words, some of the lower parts 12d, which are in the state shown in
Thereafter, some other lower parts 12d are partially cut off, and the jacks 50 are adjusted so that the length of the extendable parts 50a below the cut end is increased. Namely, the cutting operation and the supporting operation with respect to the cut ends are alternately carried out.
The boiler 10 and the boiler building 12 are lowered again to a position for the subsequent operation, and the lower part 12d is removed. The lowering and cutting operations can be repeated until the boiler 10 and the boiler structure 12, which are lower than the connection bar 53, are disassembled (lowering and disassembling step).
Based on the second embodiment, it is possible to simultaneously disassembly both the boiler and the boiler building. Therefore, the entire disassembling operation can be effectively carried out in a short period of time, without disassembling the two structures in serial.
Furthermore, it is possible to use struts 48 as shown in
The third embodiment of the invention will be explained below by referring to
In the supporting step, the boiler building is partially cut as shown by a dotted line to form a removed part 19. Then, a plurality of jacks 70 are dispersedly arranged on a base surface 11 for installing the boiler building 12 thereon. The jacks 70 are provided immediately below the columns 12a or beams 12b for supporting the boiler and the boiler building in a well-balanced state. The supporting position of the boiler building 12 and the boiler 10 is determined only by the arrangement of the jacks 70 provided below.
Thereafter, the jacks 70 are adjusted so as to support the boiler 10 and the boiler building 12. Namely, the length of the extendable parts 70a of the jacks 70 is extended for lifting up the entire structures including the boiler 10 and the boiler building 12 to a predetermined height. For this operation, for instance, the number of jacks 70 is, for instance, in the range of 10 to 40, depending on the size of the boiler building 12. The jacks 70 are adjusted to support the structure 12 usually at a supporting height of several meters, from the installation base. In
In this state, the extendable parts 70a of the jacks 70 are extended upwardly for bringing the jacks 70 into a pressure contact with the lower surface of the beam 12b-2, and the lower end of the columns 12a obtained by removing the part 19. Thus, the supporting step is completed. At this point of time, the boiler building 12 is stably supported by the jacks 70. Six jacks 70 can be viewed from the front side of the boiler building 12, as shown in
Thereafter, a removal step and a lowering step are carried out. In the removal step, a removal operation is carried out from lower parts of the boilers 10 and the boiler building 12, which are supported by the jacks 70. More concretely, the boiler 10 and the boiler building 12 are cut at the height shown by dash-dotted line L5 in
After removing the parts below line L5, the boiler 10 and the boiler building 12 are still being upheld by the jacks 70, and the parts lower than the line L5 do not exist any more. In this state, a lowering step is carried out. Differently from the supporting step, the lowering step is carried out by lowering all the jacks 70 at the same rate simultaneously. Namely, the supporting height of the boiler 10 and the boiler building 12 is lowered by contracting/shortening all the extendable parts 70a of the jacks 70. During this operation, it is necessary to maintain the supporting balance of the boiler 10 and the boiler building 12 on the jacks 70. It is preferable to carry out the lowering step so as to have a predetermined space from the lower end (cut end) of the boiler 10 and the boiler building 12 to the base surface 11.
Thereafter, the removal step is carried out with respect to the lowered structures. After the first jacks 70 are contracted to a maximum extent to obtain a lowest supporting height, second jacks 72 are provided.
In the additional supporting operation, the second jacks 72 are arranged below the boiler 10 and the boiler building 12 for obtaining a stable support with a good weight balance. While a part of the boiler structure is cut so as to form a removed part 19 corresponding to each one of the second jacks 72, the relevant extendable part 72a is extended.
After the additional supporting operation, the removal step and the lowering step are repeated until the jacks 72 are lowered to a maximum lowest position. The jacks 70 used in the supporting step shown in
Between two adjacent supporting steps, it is possible to carry out one or more removal step and one or more lowering step. Moreover, it is possible for the extendable part 70a of the jack 70 to support not only the columns 12a and the beams 12b, but also one or more supporting elements which has been provided on the supporting structure.
The operation of the jacks 70 and 72 can be carried out individually. Moreover, it is possible to provide a control unit for controlling all the jacks collectively. By using the control unit, it is possible to perform a simultaneous lowering operation in all the lowering steps, or to make individual supporting operation, and to precisely control the additional supporting operation.
Moreover, it is possible to change the number or kind of first and second jacks. Namely, it is possible to use only one kind of jacks (jacks 70 or jacks 72), or two or three kinds of jacks, depending on the size of the boiler and the boiler building to be disassembled.
According to the third embodiment of the present invention, it is possible to quickly disassemble the boiler 10 and the boiler building 12 as a simultaneous operation. Then, it is not necessary to disassemble the boiler 10 and the boiler building 12 one after another. The disassembling operation proceeds from lower parts of the boiler 10 and the boiler building 12. This makes it possible to perform the cutting operation at a height close to the base surface 11 such as a ground, and almost no operation is conducted at an elevated spot. Accordingly, the disassembling operation is carried out safely. Moreover, it is not necessary to bring down the cut parts of the boiler 10 and the boiler building 12 from an elevated spot. Therefore, the cut parts can be easily transported from the disassembling site. Thus, the cut parts can be easily and cheaply disposed.
Moreover, in the third embodiment of the invention, it is possible to support the boiler building 12 easily by using the jacks 70 with extendable parts 70a. Further, the supporting height is easily changed only by adjusting the extendable parts 70a. Only by the vertical extension and contraction of the extendable parts 70a, the boiler 10 and the boiler building 12 can be stably supported, and vertically moved. Therefore, the operation can be carried out in a limited space, i.e., within the installation site of the boiler 10 and the boiler building 12.
Furthermore, in the third embodiment, it is possible to carry out a plurality of supporting steps by using jacks 70 and 72. Therefore, the individual jacks can be relatively small and light, which are convenient in view of installation and portability.
In the fourth embodiment, a lower part of the boiler supporting building 12, for example, a part of the beam 12b-2 supported by one of the jacks 70 (jack 70-2) is partially removed, to create another removed part 19 (partial removal operation).
Thereafter, the length of the extendable part 70a of the jack 70-2 is increased to the lower surface of the beam 12b-3, whereby the beam 12b-3 is supported by the jack 70-2 again (supporting step in a recurrent operation). Likewise, the supporting height of the jacks 70 except for the jack 70-2 is increased, for example, one after another. The supporting step in the recurrent operation is carried out by adjusting one or more the jacks at one time, with maintaining a stable supporting state. The supporting step in the recurrent operation is repeated until all the jacks 70 are subjected to this step. Subsequently, the removal step and the lowering step are repeated. Thus, the boiler 10 and the boiler building 12 are completely disassembled by using the first jacks 70, without using the second jacks 72.
For performing the above described operation, relatively large number of jacks is used. It is possible to gradually decrease the number of jacks as the total weight of the boiler 10 and the boiler building 12 is decreased after the disassembling operation proceeds to a predetermined extent.
In the above embodiment, small and identical jacks 70 can be used for disassembling the boiler 10 and the boiler building 12 simultaneously, from the lower parts of the boiler 10 and the structure 12. It is possible, in the present invention, to easily and speedily carry out the disassembling operation with respect to the boilers and the boiler buildings with various sizes.
On the other hand, it is possible to use jacks having extendable parts which are longer than those of the jacks 70 shown in
Moreover, when a relatively small boiler and a suspending structure are disassembled with the large jacks, it is possible to directly support the main girder 12c of the boiler building for the supporting step. In this case, it is possible to completely disassemble the boiler 10 and the boiler building 12 by repeating the removal step and the lowering step only, after a single supporting step.
In the removal step, it is preferable that the interior of the boiler part, which has not yet been disassembled, has a negative pressure. Accordingly, it is possible to avoid damages caused by a harmful cut substance. For providing a negative pressure within the boiler 10, open parts of the boiler is first closed by closure members. Then, an apparatus including a piping for air suction is provided at an appropriate position of the boiler, and then the air in the boiler 10 is absorbed through the piping for air suction by using, for example, a fan. By using a fan, it is possible to obtain a large absorption toward the interior of the boiler 10.
It is possible, in a general disassembling operation, that powder (e.g. metal powder or powder of fire-resistant substance such as asbestos) is formed when the boiler part such as the outer or inner casing 27a and 27b of the furnace unit 27 is cut. By the application of negative pressure in the present invention, the powder can is retained in the interior of the boiler 10, and is not released to the outside environment. Accordingly, it is possible to eliminate possible environmental problems which can be caused by harmful powder.
For closing the open parts of the boiler, it is possible to utilize the base surface 11. More specifically, the boiler 10 is lowered, after the lower part of the furnace unit is cut off, until the lower edge contacts the base surface 11. Then, the opening of the boiler is at least partially closed with the base surface 11.
Moreover, it is preferable to wrap the lower end of the boiler 10 by using a wrapping member such as a plastic sheet. By the provision of the wrapping member, it is possible to prevent a part of the boiler 10 such as a fire resistant material including asbestos from falling, or a small cut pieces or powder of the boiler 10 from scattering.
The present invention being thus described, it will be clearly understood that the same may be varied in many ways. Such variations are not to be regarded as a departure from the spirit and scope of the present invention, and all such modification as would be easily understood to one skilled in the art are intended to be included within the scope of the appended claims.