The present invention is related to a method for improving the strength and stiffness of soil by treating the soil with a displacement device having a plurality of tines, and optionally subsequently filling voids made by the device with flowable media such as, for example, sand, gravel, recycled materials, waste materials, tire chips, cement, grout, concrete, or other cementitious material in order to form hardened inclusions in the improved ground area.
Heavy or settlement-sensitive facilities that are located in areas containing soft, loose, or weak soils are often supported on deep foundations. Such deep foundations are typically made from driven pilings or concrete piers installed after drilling. The deep foundations are designed to transfer structural loads through the soft soils to more competent soil strata. Deep foundations are often relatively expensive when compared to other construction methods.
Another way to support such structures is to excavate out the soft, loose, or weak soils and then fill the excavation with more competent material. The entire area under the building foundation is normally excavated and replaced to the depth of the soft, loose, or weak soil. This method is advantageous because it is performed with conventional earthwork methods, but has the disadvantages of being costly when performed in urban areas and may require that costly dewatering or shoring be performed to stabilize the excavation.
Yet another way to support such structures is to treat the soil with “deep dynamic compaction” consisting of dropping a heavy weight on the ground surface. The weight is dropped from a sufficient height to cause a large compression wave to develop in the soil. The compression wave compacts the soil, provided the soil is of a sufficient gradation to be treatable. A variety of weight shapes are available to achieve compaction by this method, such as those described in U.S. Pat. No. 6,505,998. While deep dynamic compaction may be economical for certain sites, it has the disadvantage that it induces large waves as a result of the weight hitting the ground. These waves may be damaging to structures. The technique is deficient because it is only applicable to a small band of soil gradations (particle sizes) and is not suitable for materials with appreciable fine-sized particles. What is needed in the field is a system that can rapidly improve cohesionless, cohesive, and semi-cohesive soils without inducing damaging vibrations.
More recently, ground reinforcement with aggregate columns has been used to support structures located in areas containing layers of soft soils. The columns are designed to reinforce and strengthen the soft layers and reduce settlements. Such piers are constructed using a variety of methods including drilling and tamping methods such as described in U.S. Pat. Nos. 5,249,892 and 6,354,766 (“Short Aggregate Piers”), driven mandrel methods such as described in U.S. Pat. No. 6,425,713 (“Lateral Displacement Pier”), and tamping head driven mandrel methods such as described in U.S. Pat. No. 7,226,246 (“Impact®” system).
The “Short Aggregate Pier” technique referenced above, such as described in U.S. Pat. No. 5,249,892, which includes drilling or excavating a cavity, is an effective foundation solution, especially when installed in cohesive soils where the sidewall stability of the hole is easily maintained. The Short Aggregate Pier method may, theoretically, also be applied to multiple holes at once. However, this technique has the disadvantages of requiring casing in granular soils with collapsing holes and of necessitating the filling of the holes prior to tamping. When theoretically applied to multiple holes at once, the system is limited to very shallow treatment depths such as those needed for improvement below pavements. Needed in the field is a system that overcomes these deficiencies by allowing soil improvement to a wide range of soil conditions without the necessity of filling the holes between tamping passes and of being able to treat to deeper depths required for the support of shallow spread footings.
The “Lateral Displacement Pier” and “Impact®” system methods were developed for aggregate column installations in granular soils where the sidewall stability of the cavity is not easily maintained. The Lateral Displacement Pier is built as described in U.S. Pat. No. 6,425,713 by driving a pipe into the ground, drilling out the soil inside the pipe, filling the pipe with aggregate, and using the pipe to compact the aggregate “in thin lifts.” A beveled edge is typically used at the bottom of the pipe for compaction. The Impact® system is an extension of the Lateral Displacement Pier. In this case, a smaller diameter (8 to 20 inches) tamper head is driven into the ground as disclosed in U.S. Pat. No. 7,226,246. The tamper head is attached to a pipe, which is filled with crushed stone once the tamper head is driven to the design depth. The tamper head is then lifted, thereby allowing stone to remain in the cavity, and then the tamper head is driven back down in order to densify each lift of aggregate. An advantage of the Impact® system, over the Lateral Displacement Pier, is the speed of construction.
The “Rampact®” system is yet another displacement method in which a single conical shaped mandrel is driven into the ground and then filled with crushed stone as described in U.S. Pat. No. 7,326,004. The mandrel is hollow and fitted with a sacrificial plate or a valve mechanism at the bottom. The mandrel is later lifted to allow the rock to flow out of the bottom of the mandrel. The mandrel is then redriven back down into the cavity to compact the stone. The pier is constructed incrementally upwards in thin lifts from the bottom.
The present invention is directed to a method for ground improvement with hardened inclusions. In one embodiment, the method comprises providing a device for ground improvement comprised of a top plate having a first surface configured for having a driving device attached thereto to provide impact thereon, and a plurality of vertically extending tines attached to a second surface of the top plate opposite the first surface of the top plate, and horizontally spaced from each other at upper lateral edges thereof, for being driven into a ground surface, and the tines being shaped, spaced, and oriented relative to each other in a manner to achieve displacement of ground material downward and radially outward. The method also comprises advancing the device tines into the ground surface to create cavities at the location the tines are advanced; at least partially retracting the tines from the ground surface; and adding hardening cementitious material backfill into the cavities for forming a plurality of hardened inclusions within the cavities.
In an exemplary embodiment, the advancing, retracting, and adding steps are repeated multiple times until a desired ground condition is achieved. The tines can be hollow and each have an opening at an end away from the surface plate, such that backfill can be added through the tines and out the opening of each time upon retraction thereof. The tines can have respective valves at the open ends, and the method comprises keeping the valves closed upon advancement of the device and opening the valves upon retraction, and adding the backfill through the tines. The tines can also have respective sacrificial plates at the open ends, and the method comprises securing the sacrificial plates to the tines upon advancement of the device and allowing the sacrificial plates to separate from the tines upon retraction, and adding the backfill through the tines. The cementitious material backfill can be one of or a combination of crushed stone, sand, aggregate, gravel, grout, concrete, lime, cement, fly ash, waste materials, tire chips, recycled materials, and other flowable substances. The cementitious material backfill can be a mixture of 95% by total weight sand and 5% by total weight cement.
In another exemplary embodiment, the tines can be tapered to be narrower at an end away from the top plate than at the attachment to the second surface of the top plate. The tines can be tapered at an angle in the range of 0° to 5°, and more specifically, at an angle in the range of 0.5° to 2.5°. The tines can be cylindrical. The tines can have a length in the range of 2-30 feet, can be circular in cross-section, or articulated in cross-section. The tines can be substantially flat at an end away from the top plate, substantially pointed at an end away from the top plate, or have a bulbous shape at an end away from the top plate. The tines can be made of ferrous material, steel, or composite materials.
In yet another exemplary embodiment, the plurality of tines comprises five tines horizontally spaced from each other, with four perimeter tines spaced about the periphery of the top plate and surrounding a centrally located tine. The four perimeter tines can be oriented at 45° about their vertical axis relative to the centrally located time. In another exemplary embodiment, the plurality of tines comprises eleven tines horizontally spaced from each other, with eight perimeter tines spaced about the periphery of the top plate and surrounding three centrally located tines. The eight perimeter tines can be oriented at 45° about their vertical axis relative to the centrally located tines.
In a further exemplary embodiment, the level of ground improvement achieved can be measured through a monitoring of downward pressure during penetration for a determination of degree of densification.
It is to be understood that the invention as described hereafter is not limited to the details of construction and arrangements of components set forth in the following description or illustrations in the drawings. The invention is capable of alternative embodiments and of being practiced or carried out in various ways. Specifically, the dimensions as described, and where they appear on the drawings are exemplary embodiments only and may be modified by those skilled in the art as conditions warrant.
According to the figures, the invention includes an apparatus and method for improving the strength and stiffness of in-situ subsurface materials, e.g., soil in a grounded surface, prior to loading by buildings, slabs, walls, tanks, transportation structures, industrial works, and other structures. The apparatus includes a device 15 made up of a series of vertically oriented tines 11 which extend downwardly and are fixed to a top plate 13. The purpose of the top plate 13 is to hold the tines 11 in place. The top plate 13 holds the tines together and does not necessarily provide densification or confinement during densification.
As shown in
Each tine 11 extends vertically downward from the top plate 13. As shown in the embodiment shown in
While other dimensions are possible, the embodiment associated with
The large length to width ratios of each individual tine 11 of the present invention is important to ensure adequate densification to design depths for spread footings (as opposed to shallow treatment depths such as those needed for improvement below pavements, as taught in the prior art). For example, the tines associated with
In an alternative embodiment, the tines may be cylindrical. In yet another embodiment, the tines 11 may be alternatively tapered or cylindrical. In a further embodiment, the tines 11 may have a bulbous bottom head 18 for additional densification as shown in
The tines 11 are typically made of steel, cast iron, other ferrous metal, or composite materials and are typically hollow (thereby contributing to the relatively lightweight nature of the device). The tines 11 and top plate 13 making up the device 15 should be both strong and lightweight for easy driving. The device 15 is driven into the ground or soil by a mechanical driving apparatus or hammer 17 as shown in
As shown in
The top plate 13 can include a grab plate (not shown) at the surface thereof facing the driving apparatus 17. The grab plate is conventional in nature and allows the top plate 13 to be attached to the driving device 17. The driving of the tines 11 is performed in a smooth, vibrating or hammering manner. This is in contrast to “deep dynamic compaction” devices previously discussed which require dropping a heavily weighted device from a relatively great height at intermittent intervals required for the lifting of heavy weights.
A sensor device may optionally be used for measurement of the degree of densification during the process. A sensor 101 may be attached to the driving device 17 above the top plate 13 of the multi-tined device 15 (such as, for example, at a location on a hammer sled). The sensor would enable measurement of applied downward “crowd” pressure during the densification process. The sensor could consist of a pressure gage mounted on the hydraulic lines of the rig, a strain gage mounted on the hammer sled or pull down cable, or an instrumented pin that measures shear force applied to a connection. The sensor would serve as an indicator of when the design densification level has been reached.
In another embodiment, the tines 11 are used as conduits for the placement of flowable fill such as grout or other flowable substance, including cementitious material. In this embodiment, the tips of the tines 11 may be fitted with mechanical valves, such as shown in
As will be shown subsequently, the device 15 facilitates soil improvement to a depth greater than the furthest extension of the tines 11 in the soil. This is significant because the invention provides a means to treat the soil to depths much greater than provided by other means.
A method in accordance with the invention involves driving the device 15 and its tines 11 into the ground to a depth of desired improvement. The driving takes place as quickly as possible in one smooth motion facilitated by vibratory or impact energy such as that achieved by hammering. The device is then retracted from the ground to the ground surface. During retraction, the sidewalls of formed holes may collapse if the matrix soil is in a very loose state. This collapse manifests itself into settlement of the ground surface in the area of ground improvement by the device 15. The device 15 and its tines 11 may be then reinserted into the ground to the depth desired, and then once again retracted. The process of penetration and retraction serves to achieve densification through the displacement of the ground material downward and radially outward.
For some soil profiles, after the ground is treated with the device, the ground may “tighten up” and the holes formed by the tines 11 may stay open. Optionally, these holes may be filled with flowable material, such as, for example, crushed limestone, sand, aggregate, gravel, granular waste products, tire chips, concrete, grout, fly ash, lime, cement, recycled materials (concrete, glass, etc.), or other flowable material, including cementitious material. The purpose of the backfill is to prevent the holes from collapsing at a later time. Further, the use of cement or other cementitious materials may allow for the installation of “hardened inclusions” in the holes or voids, as is described hereinbelow. The area of improvement may then be once again improved by re-inserting the device 15 and its tines 11, or it may be considered to be fully treated, depending on design requirements.
The presence of the plurality of vertical tines 11 serves an important function for the device 15. As each tine 11 is inserted, the soil in the area of the tines 11 is displaced both downward and radially outward. The radial outward displacement is called cavity expansion. During tine 11 insertion, cavity expansion causes the soil around the tine 11 to displace outward and compact. The degree of densification depends on the ability of the soil to drain and compact, on the degree of cavity expansion, and on the boundary conditions surrounding the cavity.
The more rigid the boundary surrounding the expanded cavity, the greater the densification. In contrast, for a unitary or single tine device, i.e., single probes, the boundary of an expanded cavity at any radius from the edge of the cavity consists of soil that itself may further deform outwardly away from the single tine. This non-rigid boundary lessens the amount of potential densification because it provides little lateral restraint. For the present invention, the boundary of the expanded cavity around each tine 11 is characterized in part by the presence of, and interaction with, adjacent tines 11, that are also causing cavity expansion. Thus, the cavity expansion of each tine 11 is contained by an adjacent expanding cavity that is being expanded in the opposite direction. These equal and opposite forces effectively form a rigid vertical boundary condition or sidewall during insertion and cavity expansion. The result is a very efficient soil improvement method that leads to greater densification. This is because the tines are spaced from each other at all locations, including being horizontally spaced from each other at the respective attachment locations at the top plate.
The method described herein (and in the Examples below) contemplates various steps including multiple passes then filling; filling after each pass; never filling in soils that collapse; surface tamping later; filling with sand; filling with crushed stone; filling with other aggregate; filling with gravel; filling with granular media such as glass, recycled materials, or others; filling with tire chips; filling with a fluid media such as grout or concrete; filling with mixtures of sand, water, fly ash, cement, or other cementitious mixtures; or using two tines, three tines, four tines, five tines, or additional tines, as may appropriate to the site.
Having generally described the invention, it is more specifically described by illustration in the following specific Examples which describe different embodiments with respective different numbers and shapes of tines employed.
In May of 2009, testing was performed using a first embodiment of the invention at an Iowa Test Site. The device was used to stabilize natural sand, natural silty sand, and imported fill sand at the site. The device 15 of the invention was advanced at a total of 36 locations. The device 15 was advanced to a depth of 6 feet in all cases. This testing program was used to evaluate the quantitative improvements using the device 15, in comparison to surface compaction with a vibratory plate applied at the ground surface.
Installations
The device used in this Example I was fabricated to reflect the features shown in
The Test Site contained approximately 4 feet of natural silty sand over natural clean sand. Standard Penetration Test (“SPT”) N-values in the upper 10 feet generally ranged between 5 and 10 blows per foot. Groundwater was noted at a depth of 6 to 8 feet during the post-installation Cone Penetration Test (“CPT”) measurements.
Prior to testing, in an approximately 20-foot by 20-foot area, the upper 4 feet of silty sand overburden was removed and replaced with uncompacted sand. Testing was performed both in this area, and to the outside of this area where the silty sand overburden remained in place. The test areas were improved by the device 15.
Referring to
For a second 9 locations (Locations 10-18) in an area containing natural silty sand overlying natural sand, the same procedure was used as with the first 9 locations (Locations 1-9), although less sand was needed to fill the depressed areas. This is assumed to be caused by the upper 4 feet of sand backfill being looser at the first 9 locations (Locations 1-9) than the second 9 locations (Locations 10-18).
To increase the speed of installation from 10 minutes to 3 minutes per location, the procedure was then changed, as described below. At a third 9 locations (Locations 19-27) within the imported sand area, a total of three passes were made at each location as compared to 12 made for the first 18 locations (Locations 1-9 and Locations 10-18). Crushed stone was added to fill the depression area after each pass. This same process was performed at a fourth 9 locations (Locations 28-36) in the natural silty sand soil area.
To provide a comparison with the four installations described above, within approximately 10-foot by 10-foot areas in both the imported sand area and natural silty sand overburden area, the ground surface was compacted with a conventional vibrating plate compactor applied to the ground surface. There were also test sites in both the sand area and natural silty sand overburden area with no improvement of any type (with the vibrating plate or with the present invention) in order to establish initial unimproved (base line) conditions.
CPT Testing
Cone Penetration Tests (“CPT”) were performed at the 36 treated locations described above (and the vibrating plate sites and base line sites) after the installations to quantify the improvements that were achieved. The CPT results are shown in
For the imported sand site (
For the natural silty sand site (
The soil improvement using the device of the present invention applied to both the imported sand backfill and natural silty sand over clean sand sites showed 5- to 7-fold increases in CPT tip resistances over the depth of tine penetration. The soils below the maximum penetration of the tines showed 1.5- to 3-fold increases in CPT tip resistances to depths of twice the width of the top plate extending below the maximum tine penetration depth.
In consideration of the results achieved and a comparison of the installation times for the two procedures, it appears that treatment with three passes achieves almost the same results as treatment with 12 passes and is thus deemed to be more efficient.
In July of 2009, additional installations and testing were performed at the Iowa Test Site as described in Example I above. An alternate embodiment of the device 15 was advanced at a total of 22 locations, as described below. The device was advanced to a depth of 10 feet in all cases.
Installations
The embodiment used in this Example II is shown in
The installations with the embodiment of this example included four passes (insert tines, then retract and backfill holes in subsided area) and 12 passes in the imported sand site, and four passes and six passes in the natural silty sand site. For the installations using the embodiment of this example, sand backfill was used in all cases. The subsided area was filled with about 5 to 7 cubic yards of sand for each location. The treatment took about 2 minutes per pass. After the passes were completed the ground surface was surface compacted with a vibratory plate.
CPT Testing
CPT tests were performed within the footprint of the improved area to quantify the improvement that was achieved. There was also base line readings performed in untreated areas.
A summary of the CPT results performed are presented in
For the imported sand site (
For the natural silty sand site (
The test results made after installations with the 10 foot long device 15 showed significant improvements throughout the depth of device penetration and further soil improvements to about twice the width of the top plate (13) of the device extending below the maximum penetration depth. The degree of soil improvement increases with the number of passes.
The device was fabricated to increase the tine length to 20 feet for a separate embodiment as described below.
In November of 2009, additional testing was performed at the Iowa Test Site as described in Example I above. A new embodiment of the invention was advanced at a total of 10 locations, as described below. The device 15 was advanced to a depth of 20 feet in all cases, unless refusal was encountered. The intention of this testing program was to evaluate the quantitative improvements using the new embodiment.
Installations
The new embodiment in this Example III was a device 15 including eight individual tines 11 attached to an approximately 30-inch by 45-inch top plate 13 as shown in
For all of the embodiments, the perimeter tines 11 were oriented 45 degrees to any central tines 19 to reduce the potential for plugging of soil/sand between adjacent tines 11.
Testing was performed in the area that was characterized by natural silty sand over natural clean sand. Results discussed below were based on treatments consisting of four passes and one pass.
During installation at locations 1-4, significant surface depression was noted, as further evidenced by the amount of backfill that was used. Additionally, a series of radial tension cracks were noted around this area. The first cracks were noted about 8 feet from the center of the installation. At the time of completion, the furthest cracks were about 18 feet from the center, representing a circular affected area with a diameter of about 36 feet.
Surface compaction was performed after installations with the embodiment of this example and prior to CPT testing.
CPT Testing
CPT testing was performed at the locations tested to quantify the improvement that was achieved. The first CPT attempt at the center of the four installations with the 8-tines encountered refusal at a depth of 5 feet. The next CPT attempt encountered refusal at a depth of 10 feet.
Additional CPT tests were added at the center of different locations in an attempt to quantify soil improvements. The CPT results are presented in
The baseline CPT readings showed tip resistances of approximately 20 tsf to a depth of 5 feet, approximately 50 tsf to 100 tsf from 5 feet to 20 feet, and approximately 70 tsf to 150 tsf from 20 feet to 30 feet. After treatment with just one pass, the CPT tip resistance values increased with depth from about 25 tsf at one foot to 200 tsf at depths of 10 to 15 feet. The tip resistances were greater than 300 tsf at depths of 15 feet to 20 feet and then decreased back to the baseline readings at about 25 feet. After treatment with four passes, even more improvement occurred with CPT tip resistances increasing to values exceeding 400 tsf at a depth of 20 feet at which depth refusal to pushing occurred.
The test results showed significant soil improvement throughout the depth of installation and substantial improvement to a depth of about twice the width of the top plate 13 below the bottom of the maximum penetration depth of 20 feet. Increased soil improvement occurred with increasing number of passes.
In January of 2010, installations were performed at a site located in Oklahoma. The device was used to treat soil for the support of a large steel storage tank. The spacing between individual installation locations was 7 feet on-center. The design of this embodiment was based on previous test results, as described with reference to the above Examples and using the geometry shown in
Installations
The device 15 used was similar to that described above with reference to Example I and shown in
Borings performed at the site before the installations were made indicate the presence of loose to medium dense sand within the reinforcement zone. The sand was fine-grained with fines content of approximately less than 5%. No groundwater was encountered.
The general procedure consisted of penetrating the tines to full length or a portion of the tine length, followed by retraction and backfilling with native sand. Each pass took approximately ½ minute to 1 minute to accomplish. Each set of 3 passes typically took about 4 minutes. The device sometimes achieved a penetration depth of only 1 to 4 feet during the third pass. Fine sand was used to backfill the cavities in all passes. Installations proceeded from one edge of the tank to the other.
Approximately 3 to 4 inches of ground heave was observed during initial installation in the first pass. Radial cracks were also observed during the first pass extending as far as 5 feet from the edge of the installations. The cavities formed by the tines remained open after each pass. This was aided in part by the moisture observed in the sand.
During the first pass, about 2 cubic yards of sand was added. After that, lesser amounts of sand were needed.
A total of eight test locations were laid out in the field for performing installation verification tests. The test site locations were in the general vicinity of the initial borings performed prior to construction. The tests were performed at installation locations and between adjacent installations. One CPT was performed outside the perimeter of the tank to serve as a baseline reading.
At all of the test site locations, excluding test site location number 8, the ground surface was compacted with three passes of a vibratory drum roller after the installations.
CPT Testing
The CPT tip resistances within the footprint of the device installations are also shown on
Installations with the device of this example increase the tip resistance within the reinforced zone and below the reinforced zone, extending to a depth of up to 13 feet, 7 feet below the bottom of the maximum tine depth. This depth of improvement is greater than twice the width of the top plate 13.
In clean sand, the device increases the tip resistance values between adjacent compaction points. The increase is, on average, two times the tip resistance for unreinforced conditions at an installation spacing of 7 feet on center.
In clean sand, the device increases the tip resistance values within the treatment footprint to up to about 250 tsf or 2 to 4 times the tip resistance for unreinforced conditions. Improvement within and below the reinforced zone, and between adjacent installation occurs from the first device penetration and increases with successive passes.
In October of 2010, an embodiment of the present invention was installed at a test site in Iowa. The test site was characterized by soft to medium stiff clay soil with an SPT N-value ranging from 3 to 6. In this embodiment of the present invention, the voids created by the device 15 were filled with a mixture of sand and cement in order to form a plurality of hardened inclusions in the improved ground area. The objective of this test program was to compare the load versus deflection characteristics of this embodiment of the present invention to unimproved ground.
Installations
The device 15 used was similar to that described above with reference to Example I and Example IV, and shown in
The installation procedure included penetrating the native ground with the plurality of tines until the top plate was level with the ground surface, and so that the tip of each tine was situated approximately 2 meters (6.4 ft) below the ground surface. The device was then extracted and the voids created by the tines were backfilled with a mixture of sand and cement. In this example the mixture was proportioned such that 5 percent of the total weight of the mixture was cement and 95 percent of the total weight was sand.
The device then penetrated the backfill material so that the tip of the individual tines were situated at a depth of approximately 1 meter (3.2 ft) below the ground surface. The voids created by the second pass of the device were then backfilled with the same sand and cement mixture described above.
The device then penetrated the backfill material so that the tip of the individual tines were situated at a depth of approximately 0.3 meter (1 ft) below the ground surface. The voids created by the third pass of the device were then backfilled with the same sand and cement mixture described above.
Load Testing
The load deflection characteristics of the unimproved ground and the load deflection characteristics of the ground improved with the plurality of tine cavities backfilled with the sand-cement mixture were determined by performing two separate load tests. One load test was performed on the unimproved ground and one load test was performed on the improved soil with the plurality of backfilled tine cavities. To facilitate load testing, a 0.76 m (30 inch) square concrete footing was constructed over the unimproved ground. A similar footing was then constructed over the improved soil with the plurality of backfilled hardened inclusions.
Both load tests were completed using a hydraulic jack pushing between a test frame and the concrete footing.
The foregoing detailed description of embodiments refers to the accompanying drawings, which illustrate specific embodiments of the invention. Other embodiments having different structures and operations do not depart from the scope of the present invention. The term “the invention” or the like is used with reference to certain specific examples of the many alternative aspects or embodiments of the applicants' invention set forth in this specification, and neither its use nor its absence is intended to limit the scope of the applicants' invention or the scope of the claims. This specification is divided into sections for the convenience of the reader only. Headings should not be construed as limiting of the scope of the invention. The definitions are intended as a part of the description of the invention. It will be understood that various details of the present invention may be changed without departing from the scope of the present invention. Furthermore, the foregoing description is for the purpose of illustration only, and not for the purpose of limitation.
This patent application is a continuation-in-part of, is related to, and claims priority to U.S. patent application Ser. No. 12/792,258, filed Jun. 2, 2010, which is related to and claims priority to U.S. Provisional Application Ser. No. 61/219,814, filed Jun. 24, 2009. The entire disclosures of said applications are specifically incorporated by reference herein.
Number | Name | Date | Kind |
---|---|---|---|
794971 | Ericsson | Jul 1905 | A |
5152348 | Flanagan et al. | Oct 1992 | A |
5249892 | Fox et al. | Oct 1993 | A |
6354766 | Fox | Mar 2002 | B1 |
6425713 | Fox et al. | Jul 2002 | B2 |
6505998 | Bullivant | Jan 2003 | B1 |
7226246 | Fox | Jun 2007 | B2 |
7326004 | Wissmann et al. | Feb 2008 | B2 |
20050274532 | Lephart et al. | Dec 2005 | A1 |
20060088388 | Wissmann et al. | Apr 2006 | A1 |
20080205993 | Wissmann et al. | Aug 2008 | A1 |
Number | Date | Country |
---|---|---|
299118 | Jan 1989 | EP |
514559 | Nov 1992 | EP |
758699 | Feb 1997 | EP |
2286613 | Aug 1995 | GB |
08-296252 | Nov 1996 | JP |
2001140247 | May 2001 | JP |
2002275879 | Sep 2002 | JP |
2008121401 | May 2008 | JP |
Number | Date | Country | |
---|---|---|---|
20110091291 A1 | Apr 2011 | US |
Number | Date | Country | |
---|---|---|---|
61219814 | Jun 2009 | US |
Number | Date | Country | |
---|---|---|---|
Parent | 12792258 | Jun 2010 | US |
Child | 12977196 | US |