Claims
- 1. A method for improving the output capacity level of a factory, the factory having a plurality of workstations performing one or more functions, each function operating on a batch of materials, the method comprising the steps of:
- inputting an output capacity level for the factory and a selected parameter for improvement;
- determining whether the maximum possible variation of the selected parameter would achieve the output capacity level;
- determining an achievable capacity output level when the maximum possible improvement of the parameter does not allow for the desired improved output capacity level;
- determining the amount of improvement required to achieve the output capacity level when the maximum possible improvement meets or exceeds the output capacity level; and
- adjusting the processes of one or more workstations of the factory to implement the parameter improvements.
RELATED APPLICATION
This application is a continuation-in-part of copending U.S. application Ser. No. 07/384,292, filed on Jul. 24, 1989, now U.S. Pat. No. 5,195,041
US Referenced Citations (12)
Foreign Referenced Citations (1)
Number |
Date |
Country |
930320 |
May 1982 |
SUX |
Non-Patent Literature Citations (3)
Entry |
Kochen, "Hocus Takes the Risk Out of Planning FMS", FMS Magazine, pp. 91-93 (Apr. 1984). |
Naylor et al., "The Manufacturing Game: A Formal Approach to Manufacturing Software," IEEE Transactions on Systems, Man and Cybernetics, pp. 321-334 (May/Jun., 1986). |
Symankiewicz, Solving Business Problems by Simulation, Chapter 5 (1977). |
Continuation in Parts (1)
|
Number |
Date |
Country |
Parent |
384292 |
Jul 1989 |
|