Method for increasing subsea accumulator volume

Information

  • Patent Grant
  • 9885221
  • Patent Number
    9,885,221
  • Date Filed
    Friday, December 30, 2016
    7 years ago
  • Date Issued
    Tuesday, February 6, 2018
    6 years ago
Abstract
In a subsea system where subsea devices are operated using a pressurized fluid from one or more accumulators, the method of providing flow of pressurized fluid to operate a device which is greater than the flow from an accumulator providing the flow, comprising discharging the accumulator to drive one or more motors, driving one or more pumps by the one or more motors, the one or more pumps having a larger displacement than the one or more motors such that the one or more pump outputs a greater volume of fluid than the motor consumes, and delivering the output of the one or more pumps to operated the subsea device.
Description
TECHNICAL FIELD

This invention relates to the general subject of providing for the flow of fluids in a subsea environment in which volumes are required to be stored under pressure in bottles as a ready reserve and are needed to be deployed to operate low pressure functions, high pressure functions, and functions which require low pressure at one time and high pressure at another time.


CROSS-REFERENCE TO RELATED APPLICATIONS

Not applicable.


STATEMENT REGARDING FEDERALLY SPONSORED RESEARCH OR DEVELOPMENT

Not applicable


REFERENCE TO A “MICROFICHE APPENDIX”

Not applicable


BACKGROUND OF THE INVENTION

The field of this invention is that of providing fluid power to operate subsea components such as the shear rams of subsea blowout preventers and similar components. These components typically make up what is called a subsea blowout preventer stack and have a high volume requirement to operate an appropriate number of these functions. It can range up to 200 gallons of accumulated capacity necessary to operate various blowout preventers and valves on a subsea blowout preventer stack. In many cases such as with shear rams the pressure required to stroke the shear rams to the point of contacting the pipe to be sheared is relatively low (i.e. 500 p.s.i.) and then the force required to shear the pipe is relatively high (i.e. 5000 p.s.i.).


This is further complicated by the fact that an accumulator typically pressurizes the fluid by having compressed gas such as nitrogen provide pressure on the fluid. The compressibility of the gas allows a substantial volume of fluid to be pressurized and then discharged under pressure. A disadvantage of this is that as the liquid is discharged from the accumulator, the volume of the gas becomes larger and therefore the pressure of the gas and liquid becomes lower. As the pistons and rams of the blowout preventer move forward and need higher pressure to do their functions, the pressure of the powering fluid becomes lower. This has typically meant that the lowest pressure from the accumulator must exceed the highest operational pressure of the system. The highest pressure of the accumulator to make this work is simply higher. When a higher pressure is provided by the accumulator than is needed, it is simply throttled to reduce the pressure and turn the energy into heat.


This has been the nature of the operations of subsea accumulators for the past 50 years. There has been a long felt need for more accumulator volume capacity and the only way that those skilled in the art have met the challenge is with larger and higher pressure accumulators.


BRIEF SUMMARY OF THE INVENTION

The object of this invention is to provide an accumulator system which provides a relatively lower pressure at the start of the stroke of an operated device and a relatively higher pressure at the end of the stroke of an operated device.


A second object of this invention is to provide a system which fully utilizes the stored energy of an accumulator rather than throttling the pressure and discarding the energy as wasted heat.


A third object of this invention is to provide fluid flow at the pressure which is required by the operated function.





BRIEF DESCRIPTION OF THE DRAWINGS


FIG. 1 is a view of a deepwater drilling system such as would use this invention.



FIG. 2 is a partial section of a blowout preventer stack showing conventional operation.



FIG. 3 is a schematic showing the conventional pressure decline of an accumulator as the fluid is discharged.



FIG. 4 is a schematic showing the conventional pressure decline of an accumulator as the fluid is discharged with the area below the graphed line cross hatched to illustrate the energy expended.



FIG. 5 is the schematic of FIG. 3 with an added line indicating the actual pressure requirement of a function to be operated.



FIG. 6 is the schematic of FIG. 5 with the utilized and wasted energy cross hatched.



FIG. 7 is a partial section of a blowout preventer stack showing pumps and motors arranged according to the method of this invention in a simple form.



FIG. 8 is a schematic illustrating how much energy can be saved when operating the function illustrated in FIG. 5.



FIG. 9 is a schematic illustrating the pressure requirement of a function such as shearing pipe which has a portion of the stroke actually requiring high pressure.



FIG. 10 is the schematic of FIG. 9 with the utilized and wasted energy cross hatched.



FIG. 11 is a schematic illustrating how much energy can be saved by the present method.



FIG. 12 is a partial section of a blowout preventer stack showing pumps and motors arranged according to the method of this invention in variable displacement form.





DETAILED DESCRIPTION OF THE INVENTION

Referring now to FIG. 1, a view of a complete system for drilling subsea wells 20 is shown in order to illustrate the utility of the present invention. The drilling riser 22 is shown with a central pipe 24, outside fluid lines 26, and cables or hoses 28.


Below the drilling riser 22 is a flex joint 30, lower marine riser package 32, lower blowout preventer stack 34 and wellhead 36 landed on the seafloor 38.


Below the wellhead 36, it can be seen that a hole was drilled for a first casing string 40, that first casing string 40 was landed and cemented in place, a hole drilled through the first string for a second string, the second string 42 cemented in place, and a hole is being drilled for a third casing string by drill bit 44 on drill string 46.


The lower Blowout Preventer stack 34 generally comprises a lower hydraulic connector for connecting to the subsea wellhead system 36, usually 4 or 5 ram style Blowout Preventers, an annular preventer, and an upper mandrel for connection by the connector on the lower marine riser package 32, which are not individually shown but are well known in the art.


Below outside fluid line 26 is a choke and kill (C&K) connector 50 and a pipe 52 which is generally illustrative of a choke or kill line. Pipe 52 goes down to valves 54 and 56 which provide flow to or from the central bore of the blowout preventer stack as may be appropriate from time to time. Typically a kill line will enter the bore of the Blowout Preventers below the lowest ram and has the general function of pumping heavy fluid to the well to overburden the pressure in the bore or to “kill” the pressure. The general implication of this is that the heavier mud cannot be circulated into the well bore, but rather must be forced into the formations. A choke line will typically enter the well bore above the lowest ram and is generally intended to allow circulation in order to circulate heavier mud into the well to regain pressure control of the well. Normal circulation is down the drill string 46, through the drill bit 44.


In normal drilling circulation the mud pumps 60 take drilling mud 62 from tank 64. The drilling mud will be pumped up a standpipe 66 and down the upper end 68 of the drill string 46. It will be pumped down the drill string 46, out the drill bit 44, and return up the annular area 70 between the outside of the drill string 46 and the bore of the hole being drilled, up the bore of the casing 42, through the subsea wellhead system 36, the lower blowout preventer stack 34, the lower marine riser package 32, up the drilling riser 22, out a bell nipple 72 and back into the mud tank 64.


During situations in which an abnormally high pressure from the formation has entered the well bore, the thin walled central pipe 24 is typically not able to withstand the pressures involved. Rather than making the wall thickness of the relatively large bore drilling riser thick enough to withstand the pressure, the flow is diverted to a choke line or outside fluid line 26. It is more economic to have a relatively thick wall in a small pipe to withstand the higher pressures than to have the proportionately thick wall in the larger riser pipe.


When higher pressures are to be contained, one of the annular or ram Blowout Preventers are closed around the drill pipe and the flow coming up the annular area around the drill pipe is diverted out through choke valve 54 into the pipe 52. The flow passes up through C&K connector 50, up pipe 26 which is attached to the outer diameter of the central pipe 24, through choking means illustrated at 74, and back into the mud tanks 64.


On the opposite side of the drilling riser 22 is shown a cable or hose 28 coming across a sheave 80 from a reel 82 on the vessel 84. The cable or hose 28 is shown characteristically entering the top of the lower marine riser package. These cables typically carry hydraulic, electrical, multiplex electrical, or fiber optic signals. Typically there are at least two of these systems for redundancy, which are characteristically painted yellow and blue. As the cables or hoses 28 enter the top of the lower marine riser package 32, they typically enter the top of a control pod to deliver their supply or signals. Hydraulic supply is delivered to a series of accumulators located on the lower marine riser package 32 or the lower Blowout Preventer stack 34 to store hydraulic fluid under pressure until needed.


Referring now to FIG. 2, a partial section of several parts of the conventional state of the art system for drilling subsea wells is shown including a wellhead connector 100, ram type blowout preventers 102 and 104, annular blowout preventer 106, flex joint 30, and drilling riser central pipe 24.


Ram type blowout preventer 104 has pistons 110 and 112 which move rams 114 and 116 into central bore 118. Fluid flow into line 120 will move the pistons and rams forward to seal off bore 118 with return flow going out line 124. Fluid flow into line 124 will move the pistons and rams out off bore 118 with return flow going out line 120.


Control pod 130 receives electric and communication signals from the surface along line 132 and receives hydraulic supply from line 134, and exhausts hydraulic fluid to sea along line 136. Accumulator 140 receives pressurized hydraulic supply from the surface along line 142 and supplies the control pod 130 when appropriate. Electro-hydraulic valve 138 receives hydraulic supply from accumulator 140 and directs the hydraulic supply to open or close the rams of blowout preventer 104


Referring now to FIG. 3, a graph is shown for fluid which might be coming out of an accumulator such as is shown at 140. For understanding, this graph presumes that the accumulator will go from fully charged to fully discharged when moving one function from open (fully charged) to closed (discharged) as shown by line AB. In reality an accumulator might operate several functions, or several accumulators can be required to operate one function.


Referring now to FIG. 4, the area under line AB is cross hatched. As the energy expended from an accumulator is proportionate to the product of the volume times the pressure, the cross hatched area is generally an indication of the amount of energy of the accumulator.


Referring now to FIG. 5, line CD indicates the actual flow and pressure which could be utilized to close a function. It generally indicates that 900 p.s.i. will close it, but the entire volume of the accumulator is required.


Referring now to FIG. 6, the area below line CD is proportionate to the utilized energy in closing the function and the cross hatched area between lines AB and CD is wasted energy. This energy in excess of the required amount will be burned up in faster than required operations and resultant line flow friction losses. This generally indicates that 25% of the energy was used and 75% of the energy was wasted.


Referring now to FIG. 7, the output of accumulator is not directed to control valve but rather to motor 150. Motor 150 output torque is directed to drive pumps 152, 154, and 156, all of which have the same volume displacement for the purpose of this example. As line 134 required 900 p.s.i. in the example of FIGS. 5 and 6, line 158 will require 3*900=2700 p.s.i. to drive the motors, which is readily available from the accumulator 140. Low pressure tank 160 is provided to collect the returns from control valve 138 such that when 3 times as much is drawn from tank 160 by pumps 152, 154, and 156 as is put into tank by motor 150, standard control fluid will be available. As control valve 138 exhausts into tank 160, excess flow will be vented to sea through line 162.


Referring now to FIG. 8, this is shown graphically. On the X scale is can be seen that only ⅓ of the volume of the accumulator was expended, and the Y scale shows that it was expended at 3 times the pressure, for the same cross hatched area below line EF. The wasted energy between lines EF and GH is less than ¼ of the wasted energy as seen in FIG. 6 to do the same job. Referring now to FIG. 9, line JKLMNP indicates a special operation such as a shear ram on a subsea blowout preventer stack in which a higher pressure is actually needed. In this case as the pistons moved from J to K, the same 900 p.s.i. was required as was in the prior figures. When the shearing of the steel pipe was being done, 2900 p.s.i. as shown in line segment LM was required. After the shearing was accomplished, only 900 p.s.i. was required to continue moving to the sealing position as shown line segment NP.


Referring now to FIG. 10, it can be seen that the wasted energy between lines JKLMNP and AB is almost as much as was wasted in FIG. 6.


Referring now to FIG. 11, if all the accumulator pressure is expended at the maximum required pressure, we can reduce the required volume by more than 50 percent and substantially reduce the wasted volume as is seen between lines AQ and RS.


Referring now to FIG. 12, the three pumps 152, 154, and 156 of FIG. 7 are replaced by a single pump 170. The pump 170 is a variable displacement pump which is horsepower limited. This means that when the combination of pressure and flow rate (a measure of horsepower) exceeds a maximum, the variable flow rate is lowered until the horsepower setting is not exceeded. In the example of FIGS. 9 and 10, if the horsepower is set to that calculated by the given flow rate times 2900 p.s.i., the pipe will be sheared as was anticipated in FIGS. 9 and 10. At the times when the pipe is not being sheared, the 2900 p.s.i. cannot be achieved in line 134. As a result the variable displacement pump will change the displacement until the increased flow times 900 p.s.i. will equal the original flow time 2900 p.s.i. In this case the flow will need to be adjusted upwardly by (2900/900=3.22) a factor of 3.22/1. As the same volume is actually required to move the pistons and rams, it means that in the non-shearing portion of the stroke, the volume required from the accumulator will be reduced by a factor of 3.22.


Referring back to FIG. 11, it can be seen that the net required volume from the accumulators can be reduced by more than 50%. This means that the size of the required accumulators can be reduced to accomplish the set of required tasks, or that more capability can be provided by the same accumulators.


The same benefit can be obtained if the motor is the variable displacement device and the pumps are fixed displacement. The volume output of the pumps is generally inversely proportionate to the required pressure to operate the device to be operated.


The previous examples have shown how to increase the flow volume from an accumulator to an operated device. Alternately, the flow to the device can be decreased in order to achieve a higher pressure.


The particular embodiments disclosed above are illustrative only, as the invention may be modified and practiced in different but equivalent manners apparent to those skilled in the art having the benefit of the teachings herein. Furthermore, no limitations are intended to the details of construction or design herein shown, other than as described in the claims below. It is therefore evident that the particular embodiments disclosed above may be altered or modified and all such variations are considered within the scope and spirit of the invention. Accordingly, the protection sought herein is as set forth in the claims below.

Claims
  • 1. A method for a subsea blow out preventer stack having an accumulator and a shear ram for drilling oil and gas wells utilizing pressurized fluid as a power supply to activate said shear ram, comprising: providing said subsea blow out preventer stack having said accumulator in communication with one or more motors and said one or more motors in communication with one or more pumps and said one or more pumps in communication with said shear ram,storing in said accumulator said pressurized fluid at a first pressure and at a first volume,using said first pressure and said first volume from said accumulator to generate a second larger volume than said first volume at a second pressure lower than said first pressure via said motor and said one or more pumps, andthereby increasing the volume available to activate said shear ram while maintaining said second pressure at a level high enough to activate said shear ram.
  • 2. The method of claim 1 further comprising using said first pressure and at said first volume to drive one or more motors to drive one or more pumps to generate said second pressure and said second volume.
  • 3. The method of claim 2, further comprising said one or more pumps have variable displacement.
  • 4. The method of claim 3, further comprising said variable displacement of said one or more pumps is a function of the inverse of an output pressure of said one or more pumps.
  • 5. The method of claim 2, further comprising said one or more of said one or more motors is variable displacement.
  • 6. The method of claim 5, further comprising said variable displacement of said one or more motors is an inverse function of an output pressure of said one or more motors.
US Referenced Citations (72)
Number Name Date Kind
2552901 Miller May 1951 A
3090437 Geer May 1963 A
3163222 Foster Dec 1964 A
3163224 Haeber et al. Dec 1964 A
3207221 Cochran Sep 1965 A
3215203 Sizer Nov 1965 A
3282336 Wakefield, Jr. Nov 1966 A
3308881 Chan Mar 1967 A
3318377 Otteman May 1967 A
3338302 Hubby Aug 1967 A
3396789 Dean Aug 1968 A
3405387 Koomey Oct 1968 A
3474857 Newman Oct 1969 A
3496999 Rowley Feb 1970 A
3592263 Nelson Jul 1971 A
3827239 Ulrich, Jr. Aug 1974 A
3834460 Brun Sep 1974 A
4290735 Sulko Sep 1981 A
4337829 Banzoli Jul 1982 A
4378848 Milberger Apr 1983 A
4413642 Smith Nov 1983 A
4461354 Buras Jul 1984 A
4506735 Chaudot Mar 1985 A
4688633 Barkley Aug 1987 A
4955195 Jones Sep 1990 A
5088558 Mohn Feb 1992 A
5122036 Dickes Jun 1992 A
5145324 Dickes Sep 1992 A
5527156 Song Jun 1996 A
6318482 Fidtje Nov 2001 B1
6343654 Brammer Feb 2002 B1
6435279 Howe Aug 2002 B1
6588500 Lewis Jul 2003 B2
6609572 Andersen Aug 2003 B1
6814140 Robichaux Nov 2004 B2
7096955 Zhang Aug 2006 B2
7111687 Donald Sep 2006 B2
7374146 Whitby May 2008 B2
7387166 Bartlett Jun 2008 B2
7559523 Whitby Jul 2009 B2
7565932 Lawson Jul 2009 B2
7934376 Biester May 2011 B2
7934562 Grimseth May 2011 B2
7963110 Bollinger Jun 2011 B2
7992643 Donald Aug 2011 B2
8297361 Root Oct 2012 B1
8322427 Inderberg Dec 2012 B2
8430168 Goodall Apr 2013 B2
8490705 Curtiss, III Jul 2013 B2
8616861 Weaver Dec 2013 B2
8622139 Herbel Jan 2014 B2
8651190 Dietz Feb 2014 B2
20030051881 Vinegar Mar 2003 A1
20030150619 Meaders Aug 2003 A1
20030178200 Fox Sep 2003 A1
20050196288 Cherney Sep 2005 A1
20060102357 Williams May 2006 A1
20070187110 Lima Goncalves Aug 2007 A1
20080210500 Walker Sep 2008 A1
20080264646 Sten-Halvorsen Oct 2008 A1
20080296025 Inderberg et al. Dec 2008 A1
20090127925 Borgemenke May 2009 A1
20100300679 Lorimer Dec 2010 A1
20100307768 Bell Dec 2010 A1
20110192610 Machin Aug 2011 A1
20120006556 McHugh Jan 2012 A1
20120117970 Ostlund May 2012 A1
20120175125 Krohn Jul 2012 A1
20120279720 Whitby Nov 2012 A1
20130153242 Flight Jun 2013 A1
20130333894 Geiger Dec 2013 A1
20130343928 McCarthy Dec 2013 A1
Related Publications (1)
Number Date Country
20170107780 A1 Apr 2017 US
Continuations (2)
Number Date Country
Parent 14832384 Aug 2015 US
Child 15395653 US
Parent 13134277 Jun 2011 US
Child 14832384 US