The invention relates to a method of loading a track maintenance vehicle with bulk material, wherein the latter after forming a dump cone having a defined bulk material height hs—is moved relative to a bulk material container away from a loading point in a transport—or longitudinal direction of the vehicle and a new dump cone is formed. The invention also relates to a track maintenance vehicle.
According to EP 0 429 713 or U.S. Pat. No. 7,192,238, a track maintenance vehicle is already known which, during working operations, can be coupled to any number of similar vehicles to form a loading train. In the rear region of the bulk material container of each track maintenance vehicle, with respect to a transport direction of the conveyor belts, a sensor device is arranged which is designed as a light barrier or as a mechanical feeler and which, during the storage procedure, monitors the completion of a maximal filling height.
For the purpose of determining a payload mass, it is known from DE 20 2013 102 362 to arrange strain gauges on a bogie.
It is the object of the present invention to provide a method of the kind mentioned at the beginning as well as a track maintenance vehicle with which an optimal loading operation is possible.
According to the invention, this object is achieved with a method or a track maintenance vehicle of the specified type by way of the features cited in the characterizing part of claim 1 and 4 or 7.
With a method or a track maintenance vehicle of this kind, it is possible in a particularly economical manner to achieve a maximal filling in each case in dependence on a bulk material density prevailing during the loading operation. In doing so, it is always ensured that a maximal allowable load limit is not exceeded by the payload.
Additional advantages of the invention become apparent from the further claims and the drawing description.
The invention will be described in more detail below with reference to embodiments represented in the drawing.
Track maintenance vehicles 1, shown
By means of coupling devices, any number of similarly designed track maintenance vehicles 1 can be assembled to form a loading train mobile on the track 3 and able to self-load and -unload. In doing so, bulk material 12 discharged from a transfer point 10 onto a loading point 11 of the bottom conveyor belt 6 is stored. In the region of the transfer point 10, a non-contact sensor device 13 is provided which serves for continuous detection of a bulk material height hs and of the volume of a dump cone 14 forming in the area of the loading point 11.
The on-track undercarriage 2 shown enlarged and simplified in
A strain gauge 22 is arranged on each longitudinal frame beam 20 in each case between the transverse frame beam 21 and the axle bearing 19 of the adjoining wheel set 17. However, only a single strain gauge 22 is provided on each longitudinal frame beam 20, with the two strain gauges 22 being positioned offset to one another as seen in a transverse direction extending parallel to the axis of rotation 18. The signals of the two strain gauges 22 are combined in a measuring amplifier in order to arrive at a mean value of the strain. Preferably, the strain gauges 22 are fastened to the underside of each longitudinal frame beam 20. A swivel ring 23 or a bogie pivot for connection to the vehicle frame 4 is provided centrally on the transverse frame beam 21.
Each strain gauge 22 is fastened at a point of the longitudinal frame beam 20 at which a main power flow with tension lines running parallel to one another is present in which the shear stresses become zero, the main power flow extending in the longitudinal direction 16 of the longitudinal frame beam 20 and having a minimum of transversely extending force reactions. This means that the power flow direction runs unambiguously in only one direction, without “interfering” (shear) power influences from other directions which would influence the measuring result of the strain gauge 22.
The best possible positioning of the strain gauge 22 is determined for each individual on-track undercarriage 2 by means of the finite elements method. This guarantees, on the one hand, the correct positioning and, on the other hand, a maximum of precision.
In
A respective strain gauge 22 is arranged on the frame bridge 24 in each case between the central swivel ring 23 thereof and the adjacent bogie pivot 23 of the adjoining bogie frame 15. A total of only two strain gauges 22 are arranged on the frame bridge, wherein these are positioned offset to one another as seen in a transverse direction extending parallel to the axis of rotation 18. As a result of this offset of the strain gauges 22, it is possible to compensate the tilt of the vehicle in the case of a track super elevation.
Within the scope of the method according to the invention, it is in principle also possible—for the purpose of determining the loading mass—to detect the load-caused force effect on the on-track undercarriage 2 also by means of other known methods, for example by measuring the spring compression or by arranging strain gauges on the bogie suspension.
The method according to the invention will now be described in more detail, particularly in connection with
The volume Vs of the dump cone 14 is calculated via constant detection of the bulk material height hs by the sensor device 13. In order to compensate asymmetrical loading, for instance in track super elevations, it is advantageous to employ two sensor devices spaced from one another in the transverse direction of the vehicle, which alternatively could also be positioned at the upper end of the transfer conveyor belt 9.
Parallel thereto, a force effect caused by the loading is measured at the on-track undercarriage 2 supporting the track maintenance vehicle 1, and with this the mass ms of the dump cone 14 is calculated.
With a bulk material density computed from the volume Vs and the mass ms, the maximal dumping height or the maximum degree of filling hx of the dump cone 14 is computed in relation to a maximal allowable total loading mass mmax for the track maintenance vehicle 1. As soon as the maximal dumping height is reached, the drive of the bottom conveyor belt 6 is automatically activated, causing the bulk material cone 14 to be moved forward in the transport direction 8 relative to the bulk material container 5, away from the loading point 11.
This process is repeated until the original first dump cone 14 has reached the front end of the bottom conveyor belt 6. This step-wise motion of the bottom conveyor belt 6 is controlled automatically in such a way that, with the complete loading of the bulk material container 5, the maximal allowable total loading mass mmax is reached.
Thus, the loading capacity can be utilized in an optimal way, without an impermissible transgression of the axle load or a damaging overloading of the track maintenance vehicle taking place in the process. Additionally, an optimal distribution of the stored bulk material over the entire length of the bulk material container 5 can thus be ensured.
The achieving of the maximal allowable loading is indicated to the operator optically and acoustically at the track maintenance vehicle 1. In the case of overloading, it is additionally possible—with the aid of a telematics module mounted fixedly on the vehicle—to automatically send a text message to one or more previously defined telephone numbers. By means of GPS receivers integrated into each vehicle, the working direction of the vehicle can be determined; it is also possible to link the actual loading mass as well as any possible transgressions unambiguously to a location determined by GPS.
| Number | Date | Country | Kind |
|---|---|---|---|
| A 63/2014 | Jan 2014 | AT | national |
| Filing Document | Filing Date | Country | Kind |
|---|---|---|---|
| PCT/EP2015/000002 | 1/3/2015 | WO | 00 |