The invention relates to a method for managing a bank of rechargeable batteries comprising a sequential charging cycle of the batteries of the bank according to an order of priority and analysis of the state of charge of the batteries.
Numerous installations comprise a set of rechargeable batteries constituting a battery bank. Management of a battery is however generally performed by monitoring the voltage at its terminals, discharging of the battery being for example interrupted at a low voltage threshold and charging thereof being interrupted at a high voltage threshold. A battery that has reached one of these two limit voltages is generally disconnected in order to protect it respectively from overcharging or from extensive discharging which would be liable to damage the battery irreversibly. Although this type of management has the advantage of being simple to implement, setting up an improved method of management of a battery bank can ensure satisfactory operation of the system and optimize the service time of each battery of the bank and the cost and service rendered to the user.
The batteries of a battery bank are however generally recharged simultaneously or successively so as to keep them permanently charged. Intelligent management of the charge of each battery, designed to optimize the performances of the whole of the bank, in particular requires the state of charge (SOC) of each of the batteries to be taken into account.
Furthermore, although it is fully charged, a battery presents a decrease of its capacity with time. This decrease is a function of the conditions of use of the battery and its extent is generally difficult to evaluate without measuring the capacity. In numerous applications, in particular in the telecommunications field, a battery is considered to be defective and having to be replaced when its capacity drops below 80% of its nominal or initial capacity. Intelligent management of a bank of batteries therefore also requires the state of health (SOH) of each of the batteries to be taken into consideration.
In document EP-A-314155, priority is given to the most charged battery so as to rapidly provide a fully charged battery. The level of charge of the batteries is determined by measuring the voltage of the batteries at rest. After sequential charging of all the batteries during preset times, the priority criteria are reviewed if necessary, in particular when a battery is added or removed from the charger or when the priority battery has completed its charge cycle. The end of the charge cycle is determined by the charging time, the temperature and/or the voltage of the charged battery.
U.S. Pat. No. 5,057,762 also describes determination of the state of charge of batteries to be charged by a same charger to define a priority sequence for sequential charging of these batteries. The state of charge of a battery is determined by measuring the voltage at the terminals of this battery on charge during a given period (2 mn for 2 batteries). During this period, the batteries are successively charged with a high current called fast charge current, whereas the other batteries are charged with a weak current called slow charge current. At the end of this period, the state of charge of the batteries is compared and, as before, priority is assigned to the battery with the highest charge level to charge one of the batteries as quickly as possible. Management of a battery bank consisting in priority charging of the most charged batteries, as in the above-mentioned two patents, does however inevitably lead to intensive use of certain batteries of the bank in high states of charge and intensive use of the other batteries in weak states of charge. This type of management therefore results in inhomogeneous aging of the battery bank, which goes against optimization of its operation. For example, in the case of lead-acid batteries, the batteries used intensively in weak states of charge are subject to a type of degradation called hard sulphidation, that is very difficult to reverse, resulting in the formation of lead sulphide crystals and a loss of capacity. The batteries used intensively at high states of charge are for their part subject to loss of water contained in the electrolyte by electrolysis, and to corrosion of the positive electrode current collector again leading to a loss of capacity.
Document WO-A-00/75678 and U.S. Pat. No. 6,255,801 further describe methods for determining the capacity and/or age of a battery according to electrical parameters, peak voltage and plateau voltage, representative of a coup de fouet effect occurring at the beginning of discharging of a battery when the latter is fully charged. These different methods enable it to be determined whether a battery has to be replaced without having to fully discharge the latter.
U.S. Pat. No. 6,489,743 describes a method for management of an electric power production unit, more particularly a unit comprising batteries connected to photovoltaic modules. A regulator controls charging of the batteries so as to charge them successively to the maximum, taking account of their state of charge, when the solar energy source is available. Control of the state of charge of the batteries is based on the quantity of ampere-hours input to each of the batteries.
Document WO-A-2006/003287 describes a method for establishing a charging priority criterion according to the state of health of the batteries. Diagnosis of the state of health of the batteries is determined from electrical parameters representative of a coup de fouet effect on discharging, an effect observed at the beginning of discharging of a fully charged battery. This method enables the batteries considered to be in a bad state following this diagnosis to be recharged more frequently, or can even recommend that they be replaced.
The object of the invention is to provide a method for management of a bank of rechargeable batteries not presenting the shortcomings of known systems and, more particularly, a method enabling management of the bank of batteries to be optimized.
According to the invention, this object is achieved by a method according to the appended claims.
Other advantages and features will become more clearly apparent from the following description of particular embodiments of the invention given for non-restrictive example purposes only and represented in the accompanying drawings, in which:
The management method according to the invention can be implemented in a control device by any suitable means, and more particularly by means of a microprocessor in which the different steps of the management method are programmed.
In the particular embodiment represented in
Advantageously, during the sequential charging cycle the control device checks, in known manner, whether the batteries have reached a preset discharge level, i.e. whether they have reached a preset end of discharge criterion, for example a preset low voltage threshold. When a battery is fully discharged, it is preferably at least temporarily disconnected from the discharging system, i.e. it is no longer authorized to discharge. It can on the other hand still undergo full charging if its turn for charging occurs subsequently in the course of the current sequential charging cycle. The corresponding information, in particular the number K of fully discharged batteries and their identity, is then stored. If at the end of the current sequential charging cycle, several batteries are fully discharged, the control circuit goes on to a step (F3) of management of the K fully discharged batteries before reverting to a new sequential charging step.
In the particular embodiment illustrated in
If at the end of a sequential charging cycle at least one battery is fully discharged (Yes output of F4), the control circuit checks (F5) whether more than one battery is fully discharged (K>1 ?). If this is not the case (No output of F5), this means that a single battery is fully discharged. The control circuit then modifies the order of priority (F6) so that the single fully discharged battery is charged first (B1=discharged battery) in the next sequential charging cycle. After it has modified the order of priority in step F6, the control circuit loops back to step F2 and runs a new sequential battery charging cycle taking the new order of priority into account, i.e. first recharging the fully discharged battery.
If several batteries are fully discharged at the end of a sequential charging cycle (Yes output of F5), the control circuit goes on to step F3 of management of the K discharged batteries before returning to a new sequential charging step. The latter then takes account of a new order of priority if one has been established at the outcome of this process, described in greater detail below with reference to
In the particular embodiment of
Simultaneous charging of the fully discharged batteries during step F7 ensures that these batteries are charged under similar conditions, for example as regards the current and/or the temperature, thereby ensuring dependability of the diagnosis established when analysis of their state of charge and/or health is performed during the step F8. The charging conditions then do not need to be controlled to ensure dependable diagnosis of the state of the batteries.
The state of charge of these K batteries is then used to update the charging order of priority, in a step F9, that will be used in the next sequential charging cycle (F2). In a preferred embodiment, analysis of the state of charge of the batteries comprises comparison of the depth of discharge of the different simultaneously recharged batteries. This depth of discharge is more particularly representative of the state of the material of the fully discharged batteries. The order of priority is then preferably modified (F9) so that priority is assigned to charging the most deeply discharged batteries at the next sequential charging cycle.
Analysis of the state of health of the batteries partially and simultaneously recharged during step F7 among other things enables the defective batteries to be detected. This state of health can be used, in a step F10, to trigger maintenance and/or replacement actions of the defective batteries. For example, a maintenance action of step F10 may consist in adjusting the charging strategy according to the state of health of each battery.
Although in
In
In the particular embodiment of
Thus, at the end of sequential charging step F2, all the batteries of the bank have been successively charged according to the order of priority in force at the beginning of this sequential charging cycle, using the charging energy available in the installation. Moreover, the control circuit has placed the fully discharged batteries on standby and stored their number K and their identity so as to then enable management of the discharged batteries (F3) and modification of the order of priority for the next sequential charging cycle if necessary.
Monitoring of the batteries can be performed either permanently or periodically, in parallel with sequential charging of the batteries or systematically at the end of each sequential charging step, when the batteries are all discharging.
As indicated above with reference to
As illustrated in
After simultaneous charging of previously discharged batteries, analysis of the electrical parameters representative of a coup de fouet effect on charging thereby in particular enables the presence or absence of this coup de fouet effect at the beginning of charging to be detected (
In the example illustrated in
In the example illustrated in
As illustrated in
Such a maintenance action can consist in having recourse to a boost charge, which generally involves increasing the high voltage threshold, to pulsed current charging or to notifying the user that he should perform maintenance of the battery himself, which may for example involve checking the electrolyte level and/or making additional electrical measurements.
If the defective battery diagnosis is repeated (Yes output of F24), which is the case of K3 batteries (K3≦K2) in the example of
The management method described above thereby enables intelligent management of a bank of batteries or of a set of electrochemical cells, ensuring homogeneous use and aging of the different batteries of the bank and optimization of their service lifetime. This management method takes account of the state of charge of the batteries to preferentially charge the most discharged batteries, and takes account of the state of health of the batteries to trigger maintenance actions of the most degraded batteries and/or to recommend that the latter be replaced. The dependability and performances of the battery bank can thereby be optimized.
The priority criteria are preferably based on diagnosis of the state of charge of the batteries, and more particularly on diagnosis of the state of the active material of the discharged batteries, which enables priority to be given to charging the battery that is the most discharged according to this diagnosis.
This management method differs from existing methods in particular by the nature of diagnosis of the state of the batteries, which is based on the electrical parameters of a coup de fouet effect on charging, in particular on comparison of the amplitudes of the coup de fouet effects on charging corresponding to the different batteries. This method in particular presents the advantage of taking the impact of the conditions of the previous charging and discharging cycles into account in diagnosing the established state of charge, of establishing this diagnosis not at the end of charging for subsequent rechargings but right at the beginning of recharging. The whole of the electrical history of the analyzed batteries can thereby be taken into consideration. Furthermore, establishing the diagnosis does not require discharging, and therefore a loss of power, and also enables a diagnosis of the state of health of the analyzed batteries to be established at the same time.
The management method described above, and in particular priority recharging of the most extensively discharged batteries, ensures the most homogeneous possible use of each of the batteries of a battery bank. This moreover enables any over-dimensioning of the battery bank to be avoided thereby reducing the cost with equivalent performances.
The term ‘battery’ used in the above description extends to both rechargeable batteries and electrochemical cells.
The management method described above applies to any type of battery. It is in particular well suited for management of a bank of lead-acid batteries the use of which is commonplace in applications for which power production is intermittent, so as to adapt the power production to the demand, for example in photovoltaic applications.
In a general manner, all types of charging or discharging can be used, taking account of the type of battery and/or of the type of application in which this battery is used. In known manner, the voltage at the terminals of the battery and/or the charging and discharging current are monitored and/or measured during charging and/or discharging. Likewise, all end of charge and end of discharge criteria can be used, based for example on voltage thresholds or on voltage and/or current time profiles.
The invention is not limited to the particular embodiments described above. In an alternative embodiment, step F3 can for example concern management of all the N batteries of the bank and not only management of the subset formed by the K discharged batteries. In this case, all the batteries undergo the step of partial charging and measurement of the electrical parameters representative of a coup de fouet on charging. It is then not indispensable to previously detect the fully discharged batteries during the sequential charging cycle. By analyzing the parameters representative of a coup de fouet on charging, step F3 in fact also determines whether a battery is discharged or not (using the distinction illustrated in
Analysis of the extent of discharge of each of the batteries on the basis of the electrical parameters representative of a coup de fouet on charging measured during partial charging of the batteries can moreover be used to choose the charging strategies to be used in a subsequent sequential charging cycle of the batteries. In general manner, all types of charging strategies can be used. Standard charging strategies conventionally comprise successive phases during which charging is controlled in current or voltage. These phases are generally interrupted on cut-off criteria according to voltage thresholds or charge quantities. A new charging strategy, based on the depth of discharge, determined on the basis of the electrical parameters representative of a coup de fouet effect on charging observed at the beginning of charging of a battery, can for example consist for this battery in adding an overcharging phase following a standard charging procedure, in applying a boost charge or a pulsed current.
Number | Date | Country | Kind |
---|---|---|---|
06 04193 | May 2006 | FR | national |
Filing Document | Filing Date | Country | Kind | 371c Date |
---|---|---|---|---|
PCT/FR2007/000800 | 5/11/2007 | WO | 00 | 10/21/2008 |
Publishing Document | Publishing Date | Country | Kind |
---|---|---|---|
WO2007/132086 | 11/22/2007 | WO | A |
Number | Name | Date | Kind |
---|---|---|---|
4767977 | Fasen et al. | Aug 1988 | A |
4849682 | Bauer et al. | Jul 1989 | A |
5057762 | Goedken et al. | Oct 1991 | A |
5539297 | Fiebig | Jul 1996 | A |
5554920 | Kokuga | Sep 1996 | A |
5627452 | Okada | May 1997 | A |
5818202 | Miyamoto et al. | Oct 1998 | A |
5977750 | Ng et al. | Nov 1999 | A |
6137292 | Hirsch et al. | Oct 2000 | A |
6255801 | Chalasani | Jul 2001 | B1 |
6489743 | Alzieu et al. | Dec 2002 | B1 |
6924622 | Anbuky et al. | Aug 2005 | B1 |
7663344 | Le Gall et al. | Feb 2010 | B2 |
20070222418 | Le Gall et al. | Sep 2007 | A1 |
Number | Date | Country |
---|---|---|
0 314 155 | May 1989 | EP |
A-2000-278872 | Oct 2000 | JP |
WO 0075678 | Dec 2000 | WO |
WO 03047064 | Jun 2003 | WO |
WO 2006003287 | Jan 2006 | WO |
Number | Date | Country | |
---|---|---|---|
20090072788 A1 | Mar 2009 | US |